OBRA: MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONA

Costo Unitario Desagregado


Aporte del Programa Total
N Partidas Unid. Metrado
Cofinanc. Cofinanc. costo
MONC Otros
unitario
100.00% 0.00% 0.00% 100.00%

01 TRABAJOS PROVISIONALES

### 0.00 207.50 0.00 0.00


01.01 ALQUILER DE LOCAL PARA LA OBRA mes 3.00 207.50
### 50.00 983.29 0.00 0.00
01.02 CARTEL DE OBRA IMPRESION DE BANNER DE 3.60 M X 2.40 M (SOPORTE DE MADE und 1.00 1,033.29

02 TRABAJOS PRELIMINARES
### 0.50 0.00 0.00 0.00
02.01 LIMPIEZA MANUAL DE TERRENO NORMAL m2 3,230.07 0.50

### 0.63 0.00 0.00 0.00


02.02 LIMPIEZA MANUAL DE TERRENO CON PRESENCIA DE MALEZA Y VEGETACIN m2 625.16 0.63
### 0.25 0.914 0.00 0.00
02.03 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 3,230.07 1.16

03 EXTRACCION Y ACARREO DE AGREGADOS


### 10.00 0.00 0.00 0.00
03.01 EXTRACCION DE HORMIGON EN CANTERA m3 606.00 10.00

### 7.14 0.00 0.00 0.00


03.02 EXTRACCIN Y ACOPIO DE AFIRMADO EN CANTERA (SELECCIONADO) m3 787.81 7.14
### 25.00 0.00 0.00 0.00
03.03 ACARREO DE AGREGADOS D>100M m3 1,393.81 25.00
### 1.00 0.00 0.00 0.00
03.04 ACARREO DE CEMENTO DMX <= 100M und 4,848.00 1.00
### 8.33 0.00 0.00 0.00
03.05 ACARREO DE AGUA PARA LA OBRA DMX<=50M m3 200.00 8.33

04 PAVIMENTO VIA

04.01 MOVIMIENTO DE TIERRAS


### 7.14 1.72 0.00 0.00
04.01.01 CORTE EN TERRENO NORMAL m3 884.29 8.86
### 0.83 0.00 0.00 0.00
04.01.02 PERFILADO DE CALZADA DE VAS TERRENO NORMAL m2 2,210.73 0.83
### 0.50 0.53 0.00 0.00
04.01.03 NIVELACIN Y COMPACTACIN DE SUBRASANTE CON EQUIPO LIVIANO m2 2,210.73 1.03
### 1.67 14.39 0.00 0.00
04.01.04 RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=8" INC. COMPACTACIN E m2 2,210.73 16.05
### 12.50 0.00 0.00 0.00
04.01.05 ACARREO Y ELIMINACION DE MATERIAL EXEDENTE DMAX <= 100 M MANUAL m3 884.29 12.50

### 0.23 23.69 0.00 0.00


04.01.06 ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6M3+CARGADOR FRONTAL D<= 5 m3 442.15 23.92

04.02 OBRAS DE CONCRETO SIMPLE


### 5.36 15.59 0.00 0.00
04.02.01 ENCOFRADO Y DESENCOFRADO PAVIMENTO RIGIDO m2 196.61 20.95
### 6.88 70.22 0.00 0.00
04.02.02 PAVIMENTACIN DE CONCRETO F'C=210 KG/CM2 E=0.20M C/MEZCLADORA INC C m2 2,210.73 77.09

04.03 JUNTAS

### 0.71 2.43 0.00 0.00


04.03.01 JUNTA CON ASFALTO E= 1" m 983.06 3.14

05 VEREDAS DE CONCRETO

05.01 MOVIMIENTO DE TIERRAS


### 7.14 1.72 0.00 0.00
05.01.01 CORTE EN TERRENO NORMAL m3 302.86 8.86

### 0.07 13.21 0.00 0.00


05.01.02 CONFORMACIN Y COMPACTACIN BASE GRANULAR E=0.20M.(AFIRMADO BATIDO m2 757.16 13.28
### 12.50 0.00 0.00 0.00
05.01.03 ACARREO Y ELIMINACION DE MATERIAL EXEDENTE DMAX <= 100 M MANUAL m3 151.43 12.50
### 5.21 29.33 0.00 0.00
05.01.04 ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO MANUAL D<= 5KM m3 151.43 34.53

05.02 OBRAS DE CONCRETO SIMPLE

### 4.17 37.25 0.00 0.00


05.02.01 VEREDAS - MORTERO F'C= 175 KG/CM2 E=0.10M INCLUYE ACABADO Y BRUA m2 757.16 41.41
### 1.67 18.03 0.00 0.00
05.02.02 VEREDAS - ENCOFRADO Y DESENCOFRADO m2 358.46 19.69

05.03 JUNTAS
### 0.71 2.43 0.00 0.00
05.03.01 JUNTA CON ASFALTO E= 1" m 243.72 3.14

06 MUROS DE CONTENCION

06.01 MOVIMIENTO DE TIERRAS


### 6.25 0.00 0.00 0.00
06.01.01 EXCAVACION MANUAL DE ZANJAS PARA MURO DE PIRCA CONTENCION APROM=0. m 80.00 6.25
### 25.00 15.65 0.00 0.00
06.01.02 RELLENO COMPACTADO ZANJAS CAPAS E 0.15M C/MAT. PROPIO INC. PLANCHA C m 80.00 40.65
### 12.50 0.00 0.00 0.00
06.01.03 ACARREO Y ELIMINACION DE MATERIAL EXEDENTE DMAX <= 100 M MANUAL m3 96.00 12.50
### 5.21 29.33 0.00 0.00
06.01.04 ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO MANUAL D<= 5KM m3 96.00 34.53

06.02 OBRAS DE CONCRETO SIMPLE


### 9.38 33.26 0.00 0.00
06.02.01 MURO DE CONTENCIN - ENCOFRADO Y DESENCOFRADO m2 240.00 42.63
### 19.44 134.79 0.00 0.00
06.02.02 MURO DE CONTENCIN DE CONCRETO CICLOPEO C:H 1:8 + 30% DE PIEDRA GRA m3 144.00 154.23
### 2.08 0.40 0.00 0.00
06.02.03 CURADO DE CONCRETO CON ADITIVO m2 600.00 2.48

07 PRUEBA DE RESISTENCIA A LA COMPRESION

### 1.00 20.00 0.00 0.00


07.01 PRUEBA DE RESISTENCIA A LA COMPRESIN DEL CONCRETO und 10.00 21.00

08 MITIGACION DE IMPACTO AMBIENTAL DURANTE LA EJECUCION


### 0.00 3,000.00 0.00 0.00
08.01 MITIGACION POR IMPACTO NEGATIVO EN EL AIRE (RUIDO, POLVOS, OLORES Y GAS GLB 1.00 3,000.00

09 FLETE

### 0.00 14,999.52 0.00 0.00


09.01 FLETE TERRESTRE GLB 1.00 14,999.52

10 OTROS
### 0.00 8,000.00 0.00 0.00
10.01 KIT DE IMPLEMENTOS DE SEGURIDAD und 1.00 8,000.00
### 0.00 6,000.00 0.00 0.00
10.02 KIT DE HERRAMIENTAS und 1.00 6,000.00

### 6.25 257.50 0.00 0.00


10.03 SUMINISTRO E INSTACION DE PLACA RERCORDATORIA DE METAL Y VIDRIO (SEG und 1.00 263.75
### 11.11 62.72 0.00 0.00
10.04 BARANDA DE TUBO ACERO NEGRO 1" SUMINISTRO Y COLOCACION m 80.00 73.83
### 3.33 0.00 0.00 0.00
10.05 DEMOLICION DE VEREDAS DE 0.15 M. m2 30.67 3.33
Total Costo directo

Total Costo Indirecto 10.11%

COSTO TOTAL DE OBRA


% AVANCE MENSUAL

% AVANCE ACUMULADO
FORMATO N 16
CRONOGRAMA VALORIZADO MENSUAL REPROGRAMADO
VEHICULAR Y PEATONAL DE LOS PASAJES LOS PELICANOS, LOS PETIRROJOS, LOS HERRERILLOS Y JR. LOS PUQUIALES EN EL BARRIO DE SHANCAYAN, INDEPENDENCIA

ado MES 1: FEBRERO - 2016 MES 2: MARZO - 2016 MES 3: ABRIL - 2016
Aporte del Programa Valorizacin Aporte del Programa Valorizacin Aporte del Programa
Costo
Metrado MONC Otros Cofinanc. Mensual Metrado MONC Otros Cofinanc. Mensual Metrado MONC Otros Cofinanc.
Parcial
S/. S/.

1,655.80 207.50 1,137.04

622.51
1.00 0.00 207.50 0.00 207.50 0.50 0.00 103.75 0.00 103.75 0.00 0.00 0.00 0.00
1,033.29
0.00 0.00 0.00 0.00 0.00 1.00 50.00 983.29 0.00 1,033.29 0.00 0.00 0.00 0.00

5,765.56 3,162.00 131.25


1,615.04
1,750.00 875.00 0.00 0.00 875.00 200.00 100.00 0.00 0.00 100.00 320.00 160.00 0.00 0.00

390.73
400.00 250.00 0.00 0.00 250.00 50.00 31.25 0.00 0.00 31.25 150.00 93.75 0.00 0.00
3,759.80
1,750.00 437.50 1,599.50 0.00 2,037.00 0.00 0.00 0.00 0.00 0.00 1300.00 325.00 1,188.20 0.00

53,047.18 0.00 525.00


6,060.00
0.00 0.00 0.00 0.00 0.00 15.00 150.00 0.00 0.00 150.00 380.00 3,800.00 0.00 0.00

5,627.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.00 1,857.18 0.00 0.00
34,845.25
0.00 0.00 0.00 0.00 0.00 15.00 375.00 0.00 0.00 375.00 75.00 1,875.00 0.00 0.00
4,848.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 200.00 0.00 0.00
1,666.60
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 166.66 0.00 0.00

246,716.58 8,501.75 5,433.60

69,080.06 8,501.75 5,433.60


7,833.04
185.00 1,321.46 317.28 0.00 1,638.73 120.00 857.16 205.80 0.00 1,062.96 290.00 2,071.47 497.35 0.00
1,841.54
150.00 124.95 0.00 0.00 124.95 0.00 0.00 0.00 0.00 0.00 1340.00 1,116.22 0.00 0.00
2,285.89
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1490.00 745.00 795.66 0.00
35,488.85
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 280.00 466.76 4,028.08 0.00
11,053.63
185.00 2,312.50 0.00 0.00 2,312.50 120.00 1,500.00 0.00 0.00 1,500.00 290.00 3,625.00 0.00 0.00

10,577.11
185.00 43.29 4,382.28 0.00 4,425.57 120.00 28.08 2,842.56 0.00 2,870.64 0.00 0.00 0.00 0.00

174,545.78 0.00 0.00


4,118.39
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
170,427.39
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3,090.74
0.00 0.00

3,090.74
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

59,042.25 1,676.76 1,890.34

19,860.93 1,676.76 1,890.34


2,682.73
30.00 214.29 51.45 0.00 265.74 40.00 285.72 68.60 0.00 354.32 180.00 1,285.74 308.70 0.00

10,055.84
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,892.88
30.00 375.00 0.00 0.00 375.00 40.00 500.00 0.00 0.00 500.00 60.00 750.00 0.00 0.00
5,229.48
30.00 156.24 879.78 0.00 1,036.02 30.00 156.24 879.78 0.00 1,036.02 60.00 312.48 1,759.56 0.00

38,415.06 0.00 0.00

31,356.27
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7,058.79
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

766.26 0.00 0.00


766.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

42,197.59 0.00 0.00

8,267.18 0.00 0.00


500.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.90 268.13 0.00 0.00
3,251.92
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.90 1,072.50 671.34 0.00
1,200.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 450.00 0.00 0.00
3,315.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 187.49 1,055.74 0.00

33,930.41 0.00 0.00


10,231.20
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.60 333.75 1,183.88 0.00
22,209.41
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.60 692.21 4,798.45 0.00
1,489.80
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 150.00 312.45 60.00 0.00

210.00 0.00 0.00

210.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3,000.00 0.00 0.00


3,000.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

14,999.52 3,749.88 719.98

14,999.52
0.25 0.00 3,749.88 0.00 3,749.88 0.05 0.00 719.98 0.00 719.98 0.26 0.00 3,899.88 0.00

20,272.61 14,000.00 0.00


8,000.00
1.00 0.00 8,000.00 0.00 8,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6,000.00
1.00 0.00 6,000.00 0.00 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

263.75
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5,906.64
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
102.22
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 33.33 0.00 0.00
446,907.09 31,297.89 9,837.20
6,110.23 25,187.67 4,033.45 5,803.75 22,200.11 20,246.83

45,176.91
3,162.38 993.89
492,084.00
34,460.28 10,831.10
7.00% 2.20%

7.00% 9.20%
ANCAYAN, INDEPENDENCIA - HUARAZ - ANCASH PLAZO DE EJECUCIN: 146 DAS CALENDARIO (103 DAS HBILES)
FECHA DE INICIO: 15 - 02 - 2016 FECHA DE TRMINO: 08 - 07 - 2016
MES 4: MAYO - 2016 MES 5: JUNIO - 2016 MES 6: JULIO - 2016
Valorizacin Aporte del Programa Valorizacin Aporte del Programa Valorizacin Aporte del Programa
Mensual Metrado MONC Otros Cofinanc. Mensual Metrado MONC Otros Cofinanc. Mensual Metrado MONC Otros Cofinanc.
S/. S/. S/.

0.00 103.75 207.50

0.00 0.50 0.00 103.75 0.00 103.75 1.00 0.00 207.50 0.00 207.50 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1,766.95 373.90 312.73

160.00 500.00 250.00 0.00 0.00 250.00 450.00 225.00 0.00 0.00 225.00 10.07 5.04 0.00 0.00

93.75 12.00 7.50 0.00 0.00 7.50 10.00 6.25 0.00 0.00 6.25 3.16 1.97 0.00 0.00

1,513.20 100.00 25.00 91.40 0.00 116.40 70.00 17.50 63.98 0.00 81.48 10.07 2.52 9.20 0.00

7,898.84 12,961.90 10,128.58

3,800.00 100.00 1,000.00 0.00 0.00 1,000.00 100.00 1,000.00 0.00 0.00 1,000.00 11.00 110.00 0.00 0.00

1,857.18 200.00 1,428.60 0.00 0.00 1,428.60 200.00 1,428.60 0.00 0.00 1,428.60 127.81 912.95 0.00 0.00

1,875.00 300.00 7,500.00 0.00 0.00 7,500.00 200.00 5,000.00 0.00 0.00 5,000.00 803.81 20,095.25 0.00 0.00

200.00 2200.00 2,200.00 0.00 0.00 2,200.00 2200.00 2,200.00 0.00 0.00 2,200.00 248.00 248.00 0.00 0.00

166.66 100.00 833.30 0.00 0.00 833.30 60.00 499.98 0.00 0.00 499.98 20.00 166.66 0.00 0.00

13,345.54 104,324.78 93,798.16 0.00

13,345.54 24,300.42 13,773.80 0.00

2,568.82 120.00 857.16 205.80 0.00 1,062.96 100.00 714.30 171.50 0.00 885.80 69.29 494.94 118.83 0.00
1,116.22 300.00 249.90 0.00 0.00 249.90 300.00 249.90 0.00 0.00 249.90 120.73 100.57 0.00 0.00

1,540.66 300.00 150.00 160.20 0.00 310.20 300.00 150.00 160.20 0.00 310.20 120.73 60.37 64.47 0.00

4,494.84 1200.00 2,000.40 17,263.20 0.00 19,263.60 600.00 1,000.20 8,631.60 0.00 9,631.80 130.73 217.93 1,880.68 0.00

3,625.00 120.00 1,500.00 0.00 0.00 1,500.00 120.00 1,500.00 0.00 0.00 1,500.00 49.29 616.13 0.00 0.00

0.00 80.00 18.72 1,895.04 0.00 1,913.76 50.00 11.70 1,184.40 0.00 1,196.10 7.15 1.67 169.37 0.00

0.00 78,766.76 78,766.76 0.00

0.00 80.00 428.56 1,247.20 0.00 1,675.76 80.00 428.56 1,247.20 0.00 1,675.76 36.61 196.12 570.75 0.00

0.00 1000.00 6,875.00 70,216.00 0.00 77,091.00 1000.00 6,875.00 70,216.00 0.00 77,091.00 210.73 1,448.77 14,796.62 0.00

0.00 1,257.60 1,257.60

0.00 400.00 285.60 972.00 0.00 1,257.60 400.00 285.60 972.00 0.00 1,257.60 183.06 130.70 444.84 0.00

4,416.48 23,382.63 20,430.85

4,416.48 3,486.35 4,675.87

1,594.44 30.00 214.29 51.45 0.00 265.74 20.00 142.86 34.30 0.00 177.16 2.86 20.43 4.90 0.00

0.00 200.00 13.40 2,642.80 0.00 2,656.20 300.00 20.10 3,964.20 0.00 3,984.30 257.16 17.23 3,398.11 0.00

750.00 12.00 150.00 0.00 0.00 150.00 8.00 100.00 0.00 0.00 100.00 1.43 17.88 0.00 0.00

2,072.04 12.00 62.50 351.91 0.00 414.41 12.00 62.50 351.91 0.00 414.41 7.43 38.70 217.89 0.00

0.00 19,519.00 15,377.70

0.00 400.00 1,666.80 14,898.40 0.00 16,565.20 300.00 1,250.10 11,173.80 0.00 12,423.90 57.16 238.19 2,128.98 0.00

0.00 150.00 250.05 2,703.75 0.00 2,953.80 150.00 250.05 2,703.75 0.00 2,953.80 58.46 97.45 1,053.74 0.00

0.00 377.28 377.28

0.00 120.00 85.68 291.60 0.00 377.28 120.00 85.68 291.60 0.00 377.28 3.72 2.66 9.04 0.00

11,085.93 14,869.86 14,432.12

3,705.19 2,349.00 1,911.26


268.13 20.00 125.00 0.00 0.00 125.00 15.00 93.75 0.00 0.00 93.75 2.10 13.13 0.00 0.00

1,743.84 20.00 500.00 312.98 0.00 812.98 10.00 250.00 156.49 0.00 406.49 7.10 177.50 111.11 0.00

450.00 30.00 375.00 0.00 0.00 375.00 30.00 375.00 0.00 0.00 375.00 0.00 0.00 0.00 0.00

1,243.22 30.00 156.24 879.78 0.00 1,036.02 30.00 156.24 879.78 0.00 1,036.02 0.00 0.00 0.00 0.00

7,380.74 12,520.86 12,520.86

1,517.63 100.00 937.50 3,325.50 0.00 4,263.00 100.00 937.50 3,325.50 0.00 4,263.00 4.40 41.25 146.32 0.00

5,490.66 50.00 972.20 6,739.40 0.00 7,711.60 50.00 972.20 6,739.40 0.00 7,711.60 8.40 163.33 1,132.22 0.00

372.45 220.00 458.26 88.00 0.00 546.26 220.00 458.26 88.00 0.00 546.26 10.00 20.83 4.00 0.00

0.00 105.00 105.00

0.00 5.00 5.00 100.00 0.00 105.00 5.00 5.00 100.00 0.00 105.00 0.00 0.00 0.00 0.00

0.00 1,500.00 1,500.00

0.00 0.50 0.00 1,500.00 0.00 1,500.00 0.50 0.00 1,500.00 0.00 1,500.00 0.00 0.00 0.00 0.00

3,899.88 2,999.90 2,999.90

3,899.88 0.20 0.00 2,999.90 0.00 2,999.90 0.20 0.00 2,999.90 0.00 2,999.90 0.04 0.00 629.98 0.00

33.33 2,986.65 2,986.65

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 6.25 257.50 0.00

0.00 40.00 444.44 2,508.88 0.00 2,953.32 40.00 444.44 2,508.88 0.00 2,953.32 0.00 0.00 0.00 0.00

33.33 10.00 33.33 0.00 0.00 33.33 10.00 33.33 0.00 0.00 33.33 0.67 2.23 0.00 0.00
42,446.95 163,608.37 146,901.50
32,059.43 131,548.95 27,229.60 119,671.90 25,666.62 27,148.56

4,291.81 16,539.27 14,849.65

46,738.76 180,147.64 161,751.15


9.50% 36.61% 32.87%

18.70% 55.31% 88.18%


NO: 08 - 07 - 2016

Valorizacin
Mensual
S/.

0.00

0.00

0.00

18.73

5.04

1.97

11.72

21,532.86

110.00

912.95

20,095.25

248.00

166.66

21,312.75

3,724.95

613.77
100.57

124.83

2,098.61

616.13

171.04

17,012.26

766.87

16,245.39

575.54

575.54

7,245.20

3,715.14

25.33

3,415.34

17.88

256.59

3,518.36

2,367.17

1,151.19

11.70

11.70

1,809.68

301.73
13.13

288.61

0.00

0.00

1,507.95

187.57

1,295.55

24.83

0.00

0.00

0.00

0.00

629.98

629.98

265.98

0.00

0.00

263.75

0.00

2.23
52,815.17

5,339.91

58,155.08
11.82%

100.00%
CRONOGRAMA DE EJECUCION
OBRA: MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LOS PASAJES LOS PELICANOS,LOS PETIR
Mes 01 : FEBRERO - 2016 Mes 02 : MARZO - 2016
Semana Semana Semana Semana Semana Semana
N Partidas Unid. Metrado Total 1 2 3 5 6 7
Metrado Dia Dia Dia Metrado Dia Dia Dia
15-19 22-26 29 01-04 07-11 14-18

01 TRABAJOS PROVISIONALES
01.01 ALQUILER DE LOCAL PARA LA OBRA mes 3.00 1.00 xx 0.50 xx
01.02 CARTEL DE OBRA IMPRESION DE BANNER DE 3.60 M X 2.40 M (SOPORTE DE M und 1.00 0.00 xx 1.00 xx
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA MANUAL DE TERRENO NORMAL m2 3,230.07 1,750.00 xxxxxxxxxxxxxxxxxxxxxxxxxx 200.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
02.02 LIMPIEZA MANUAL DE TERRENO CON PRESENCIA DE MALEZA Y VEGETACIN m2 625.16 400.00 xxxxxxxxxxxxxxxxxx 50.00 xxxxxxxxx
02.03 TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO m2 3,230.07 1,750.00 xxxxxxxxxxxxxxxxxxxxxxxxxx 0.00
03 EXTRACCION Y ACARREO DE AGREGADOS
03.01 EXTRACCION DE HORMIGON EN CANTERA m3 606.00 0.00 15.00 xxxxxxxx
03.02 EXTRACCIN Y ACOPIO DE AFIRMADO EN CANTERA (SELECCIONADO) m3 787.81 0.00 0.00
03.03 ACARREO DE AGREGADOS D>100M m3 1,393.81 0.00 15.00
03.04 ACARREO DE CEMENTO DMX <= 100M und 4,848.00 0.00 0.00
03.05 ACARREO DE AGUA PARA LA OBRA DMX<=50M m3 200.00 0.00 0.00
04 PAVIMENTO VIA
04.01 MOVIMIENTO DE TIERRAS
04.01.01 CORTE EN TERRENO NORMAL m3 884.29 185.00 xxxxxxxxxxxxxxxxxxxxxx 120.00 xxxxxxxxxxxxxxxxxxxxxx

04.01.02 PERFILADO DE CALZADA DE VAS TERRENO NORMAL m2 2,210.73 150.00 0.00


04.01.03 NIVELACIN Y COMPACTACIN DE SUBRASANTE CON EQUIPO LIVIANO m2 2,210.73 0.00 0.00
04.01.04 RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=8" INC. COMPACTACI m2 2,210.73 0.00 0.00
04.01.05 ACARREO Y ELIMINACION DE MATERIAL EXEDENTE DMAX <= 100 M MANUAL m3 884.29 185.00 xxx 120.00 xxxxxx

04.01.06 ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6M3+CARGADOR FRONTAL D<= m3 442.15 185.00 120.00 xxxxxxxxxx

04.02 OBRAS DE CONCRETO SIMPLE


04.02.01 ENCOFRADO Y DESENCOFRADO PAVIMENTO RIGIDO m2 196.61 0.00 0.00
04.02.02 PAVIMENTACIN DE CONCRETO F'C=210 KG/CM2 E=0.20M C/MEZCLADORA I m2 2,210.73 0.00 0.00
04.03 JUNTAS
04.03.01 JUNTA CON ASFALTO E= 1" m 983.06 0.00 0.00
05 VEREDAS DE CONCRETO
05.01 MOVIMIENTO DE TIERRAS
05.01.01 CORTE EN TERRENO NORMAL m3 302.86 30.00 xxxxxxxxxxx 40.00 xxxxxxxxxxx

05.01.02 CONFORMACIN Y COMPACTACIN BASE GRANULAR E=0.20M.(AFIRMADO BA m2 757.16 0.00 0.00


05.01.03 ACARREO Y ELIMINACION DE MATERIAL EXEDENTE DMAX <= 100 M MANUAL m3 151.43 30.00 xxxxx 40.00 xxxxx

05.01.04 ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO MANUAL D<= 5 m3 151.43 30.00 xxxxx 30.00 xxxxx

05.02 OBRAS DE CONCRETO SIMPLE


05.02.01 VEREDAS - MORTERO F'C= 175 KG/CM2 E=0.10M INCLUYE ACABADO Y BR m2 757.16 0.00 0.00
05.02.02 VEREDAS - ENCOFRADO Y DESENCOFRADO m2 358.46 0.00 0.00 xxxxxxxxx

05.03 JUNTAS
05.03.01 JUNTA CON ASFALTO E= 1" m 243.72 0.00 0.00
06 MUROS DE CONTENCION
06.01 MOVIMIENTO DE TIERRAS
06.01.01 EXCAVACION MANUAL DE ZANJAS PARA MURO DE PIRCA CONTENCION APRO m 80.00 0.00 0.00
06.01.02 RELLENO COMPACTADO ZANJAS CAPAS E 0.15M C/MAT. PROPIO INC. PLANCH m 80.00 0.00 0.00
06.01.03 ACARREO Y ELIMINACION DE MATERIAL EXEDENTE DMAX <= 100 M MANUAL m3 96.00 0.00 0.00
06.01.04 ELIMINACIN DE MAT.EXCED.C/VOLQUETE DE 6 M3 CARGUIO MANUAL D<= 5 m3 96.00 0.00 0.00
06.02 OBRAS DE CONCRETO SIMPLE
06.02.01 MURO DE CONTENCIN - ENCOFRADO Y DESENCOFRADO m2 240.00 0.00 0.00
06.02.02 MURO DE CONTENCIN DE CONCRETO CICLOPEO C:H 1:8 + 30% DE PIEDRA m3 144.00 0.00 0.00
06.02.03 CURADO DE CONCRETO CON ADITIVO m2 600.00 0.00 0.00
07 PRUEBA DE RESISTENCIA A LA COMPRESION
07.01 PRUEBA DE RESISTENCIA A LA COMPRESIN DEL CONCRETO und 10.00 0.00 0.00
08 MITIGACION DE IMPACTO AMBIENTAL DURANTE LA EJECUCION
08.01 MITIGACION POR IMPACTO NEGATIVO EN EL AIRE (RUIDO, POLVOS, OLORES Y GLB 1.00 0.00 0.00
09 FLETE
09.01 FLETE TERRESTRE GLB 1.00 0.25 0.05
10 OTROS
10.01 KIT DE IMPLEMENTOS DE SEGURIDAD und 1.00 1.00 xxxxxxx 0.00
10.02 KIT DE HERRAMIENTAS und 1.00 1.00 xxxxxxx 0.00
10.03 SUMINISTRO E INSTACION DE PLACA RERCORDATORIA DE METAL Y VIDRIO (S und 1.00 0.00 0.00
10.04 BARANDA DE TUBO ACERO NEGRO 1" SUMINISTRO Y COLOCACION m 80.00 0.00 0.00
10.05 DEMOLICION DE VEREDAS DE 0.15 M. m2 30.67 0.00 0.00
FORMATO N 15
OGRAMA DE EJECUCION REPROGRAMADO
OS PELICANOS,LOS PETIRROJOS, LOS HERRERILLOS Y JR. LOS PUQUIALES EN EL BARRIO DE SHANCAYAN - INDEPENDENCIA - HUARAZ ANCASH
s 02 : MARZO - 2016 Mes 03 : ABRIL - 2016 Mes 04 : MAYO - 2016 Mes 05 : JUNIO - 2016 Mes 06 : JULIO - 2016
Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana
8 9 9 10 10 11 12 12 13 14 15 16 12 13 14 15 16 12 13
Dia Dia Metrado Dia Dia Dia Dia Dia Metrado Dia Dia Dia Dia Dia Metrado Dia Dia Dia Dia Dia Metrado Dia Dia
21-25 28-31 1 04-08 11-15 18-22 25-29 02-06 09-13 16-20 23-27 30-31 01-03 06-10 13-17 20-24 27-30 64-65 66-70

0.50 x 0.50 1.00 0.00


0.00 0.00 0.00 0.00

xxxxxxxxxxxxxxxxxx 969.02 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 500.00 xxxxxxxxxxxxxxxxxxxx 450.00 xxxxxxxxxxxxxxxxxxxx 10.07 xxxxxxxxxxxx


175.16 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 12.00 10.00 3.16
1,300.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 100.00 xxxxxxxxxxxxxx 70.00 xxxxxxxxxxxxxx 10.07 xxxxxxxxxxxxxx

200.00 xxxxxxxxxxx 100.00 xxxxxxxxxxxxxxxxxxxxxx 100.00 xxxxxxxxxxxxxxxxxxxxxx 11.00 xxxxxxxxxxxxxxx


400.00 xxxxxxxxxxxxxxxxx 200.00 xxxxxxxxxxxxxxxx 200.00 xxxxxxxxxxxxxxxx 127.81 xxxxxxxxxxxxxxxx
xxxxxxxx 418.14 300.00 xxxxxxxxxxxxxxxx 200.00 xxxxxxxxxxxxxxxx 803.81 xxxxxxxxxxxxxxxx
1,454.40 xxxxxxxxxxxxxxxxxxxx 2200.00 xxxxxxxxxxxxxxxx ### xxxxxxxxxxxxxxxx 248.00 xxxxxxxxxxxxxxxx
60.00 xxxxxxxx 100.00 xxxxxxxxxxxxxxxx 60.00 xxxxxxxxxxxxxxxx 20.00 xxxxxxxxxxxxxxxx
0.00
0.00
xxxxxxxxxxxxxxxxxxxxxx 530.57 xxxxxxxxxxxxxxxxxxxxxx 120.00 xxxxxxxxxx 100.00 xxxxxxxxxx 69.29 xxxxxxxxxx
1,326.44 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 300.00 xxxxxxxxxxxxxxxxx 300.00 xxxxxxxxxxxxxxxxx 120.73 xxxxxxxxx
663.22 xxxxxxxxxx 300.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 300.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 120.73 xxxxxxxx
663.22 xxxxxxxxxx 1200.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 600.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 130.73 xxxxxxxxx
xxxxxx 442.15 xxxxxx 120.00 120.00 49.29
xxxxxxxxxx 137.15 xxxxxxxxxx 80.00 50.00 7.15
0.00
58.98 xxxxxxxxxxx 80.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 80.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 36.61 xxxxxxxxxxxxxxxxxxx
663.22 xxxxxxxxxxxx 1000.00 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx ### xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 210.73 xxxxxxxxxxxxxxxxxxx

294.92 xxxxxxx 400.00 xxxxx 400.00 xxxxx 183.06

90.86 xxxxxxxxxxx 30.00 xxxxxxxxxx 20.00 xxxxxxxxxx 2.86 xxxxxxxxxx


227.15 xxxxxxxxxxxxxxxxxxxxxxx 200.00 xxxxxxxxxxxxx 300.00 xxxxxxxxxxxxx 257.16 xxxxxxxxxxxxx
45.43 xxxxx 12.00 xxxxx 8.00 xxxxx 1.43
45.43 xxxxx 12.00 xxxxx 12.00 xxxxx 7.43

227.15 xxxxxxxx 400.00 xxxxxxxx 300.00 xxxxxxxx 57.16 xxxxxxxx


xxxxxxxxx 107.54 xxxxxxxxx 150.00 xxxxxxxxx 150.00 xxxxxxxxx 58.46 xxxxxxxxx

73.12 xxxx 120.00 xxxx 120.00 xxxx 3.72 xxxx

24.00 20.00 15.00 2.10


24.00 20.00 10.00 7.10
28.80 30.00 30.00 0.00
28.80 30.00 30.00 0.00

72.00 100.00 100.00 4.40


43.20 50.00 50.00 8.40
180.00 220.00 220.00 10.00

3.00 5.00 5.00 0.00

0.30 0.50 0.50 0.00

xx 0.30 xxxxxxx 0.20 xxxxxxxxx 0.20 xxxxxxxxx 0.04 xxxxxxxxx

0.00 #VALUE! 0.00 0.00


0.00 #VALUE! 0.00 0.00
0.00 0.00 xxxxxxxxx 0.00 xxxxxxxxx 1.00
0.00 40.00 xxxxxxxxxxxxxx 40.00 xxxxxxxxxxxxxx 0.00
0.00 10.00 xxxxxxx 10.00 xxxxxxx 0.67 xxxxxxx
FORMATO N17
CRONOGRAMA REPROGRAMADO DEL RECURSO PARTICIPANTE
(REPROGRAMADO POR AMPLIACIN DE PLAZO N 01)
OBRA: MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LOS PASAJES LOS PELICANOS, LOS PETIRROJOS, LOS

EN EL BARRIO DE SHANCAYAN, DISTRITO DE INDEPENDENCIA, PROVINCIA DE HUARAZ - ANCASH""

Periodo Mes 1: Febrero - 2016 Mes 2: Marzo - 2016 Mes 3: Abril - 2016 mes 4: Mayo - 201

Promedio
participantes por 23 30 28
mes:

Mano de obra no Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana
calificada (MONC) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

a) N de das 5 5 1 4 5 5 3 4 1 5 5 5 5 5 5
tiles

b) N de 17 28 24 30 31 28 31 29 27 21 31 29 30 65 65
participantes

c) Monto por
Compensacin
econmica = 125.00 125.00 25.00 100.00 125.00 125.00 75.00 100.00 25.00 125.00 125.00 125.00 125.00 125.00 125.00
(N de das x
S/. 25.00)

d) Total de 2125 3525 600 3000 3875 3500 2325 2850 675 2600 3875 3600 3775 8125 8125
MONC=( b x c )
Montos Totales ### ### ###
por mes

Por tanto, la cantidad de participantes promedio mensual trabajando en el proyecto es: 46


, LOS PETIRROJOS, LOS HERRERILLOS Y JR. LOS PUQUIALES

HUARAZ - ANCASH""

Promedio
mes 4: Mayo - 2016 mes 4: Junio - 2016 mes 4: Julio - 2016
General

65 65 64 46

Semana Semana Semana Semana Semana Semana Semana Semana Semana Semana
Total
16 17 18 19 20 21 22 23 24 24

5 5 2 3 5 5 5 4 1 5 103.00

65 65 65 65 65 65 65 65 65 62 1133

125.00 125.00 50.00 75.00 125.00 125.00 125.00 100.00 25.00 125.00 2575.00

8125 8125 3250 4875 8125 8125 8125 6500 1625 7750 117200
### ### 9,375.00 ###