JOB COMPLETION REPORT

OUR REF: Q/6307/S.E.W.17 Date: 30.04.2017

Customer :Hajar Trading and Technical services WLL


Customers client : EWA Bahrain

Location :Juffai T611

Sub.:3PH,930RPM ,400V Motor repair . reg

Detailed Scope of Work.:


Problem Found:
* Winding was burnt.
* Bearing Failure.
* Output lead burnt.
Job Done:
*. Check the stator windings.
*. Rewinding the Stator Completely.
*. Apply Varnish and Bake it in Oven.
*.Replaced the bearings of DE & NDE Side.
* Checked the housing,
* Replace the output cable.
*.After the rewinding Check the insulation resistance was good 1Giga ohms.
* Assemble the motor test run.
*. Delivery .
TEST READINGS:

STATOR WINDING RESISTANCES : U1U2 = V1V2 = W1W2 = 39.6 Ohms

INSULATION RESISTANCE @ 500V MEGGER is 1GighaOhms

BEARINGS REPLACED:6205 (DE)& 6205 NDE


VIBRATION TESTED: 0.6 mm/s (DE side) & 0.6 mm/s ( NDE side)
TEMPRATURE TEST :
Before starting : 30C
After 5 min running: DE & NDE 32C
Stator 33C

MOTOR TESTED: (Star) STARTING CURRENT: 5. AMPS


RUNNING CURRENT: 0.5 AMPS

As per our Quotation, and your LPO documents, the Job was successfully completed and
delivered to your site.

With Best Regards

Mohamed Thameem B.E


For Sanad Electrics