ISSUED FOR CONSTRUCTION
DESCRIPTION

AS-BUILT

AS-BUILT

SOUTHERN AREA PROJECTS DEPARTMENT


SAPD/DHAHRAN COMMUNITY HOUSING PROJECT DIVISION

BI-10-01382
JO/EWO

10-01382
10-01382

09/21/17 10-01382

EXPAND DHAHRAN RESIDENTIAL COMMUNITY


07/24/17
06/28/15
DATE

UTILITIES INFRASTRUCTURES AND NETWORKS


PACKAGE 2~7
NO.
REV

00

01
02

DISCIPLINE
ENGINEER
SAG
09/21/17
DATE:
PROJECT
ENGINEER
JZM
ETAP STUDY REPORT
09/21/17
DATE:
CERTIFIED
AMJ
09/21/17
DATE:
CONSTRUCTION
AGENCY
AMJ
09/21/17
DATE:
OPERATIONS
AFS
09/21/17
DATE:

Prepared by
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________

SEPTEMBER 2017
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 1


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

AMJ
TABLE OF CONTENTS
AMJ AMJ
AMJ
TAA
ENGG CERT
AYS

SAG
SAG

1.0 OBJECTIVE ........................................................................................................................................ 3


2.0 DEFINITIONS ..................................................................................................................................... 3
3.0 REFERENCES ................................................................................................................................... 4
4.0 PROJECT SUMMARY ....................................................................................................................... 5
ISSUED FOR CONSTRUCTION

5.0 PROPOSED ELECTRICAL SYSTEM DESCRIPTION ...................................................................... 5


DESCRIPTION

6.0 STUDY INPUTS AND ASSUMPTIONS ............................................................................................. 6


AS-BUILT

AS-BUILT

7.0 ELECTRICAL SYSTEM STUDIES FOR BASE CASE ...................................................................... 6


8.0 CONCLUSION AND RESULTS SUMMARY ................................................................................... 11
9.0 ATTACHMENTS............................................................................................................................... 11
JO/EWO

10-01382
10-01382

09/21/17 10-01382
07/24/17
06/28/15
NO. DATE
REV

00

01
02

DISCIPLINE
ENGINEER
SAG
09/21/17
DATE:
PROJECT
ENGINEER
JZM
09/21/17
DATE:
CERTIFIED
AMJ
09/21/17
DATE:
CONSTRUCTION
AGENCY
AMJ
09/21/17
DATE:
OPERATIONS
AFS
09/21/17
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 2


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

1.0 OBJECTIVE
AMJ
AMJ AMJ

The objective of this study is to verify the performance of the proposed electrical system
AMJ
TAA
ENGG CERT

and the sizes and ratings of the electrical equipment that will be installed under this
AYS

SAG
SAG

Budget Item (BI). This is accomplished by conducting the studies listed below using the
Electrical Transient Analyzer Program (ETAP) version 12.5.0:

I. Load flow
ISSUED FOR CONSTRUCTION

II. Short circuit


2.0 DEFINITIONS
DESCRIPTION

AS-BUILT

AS-BUILT

Related definitions as per SAES-P-100 Basic Power System Design Criteria:


AFD: Adjustable Frequency Drive
Approval or Approved: Written approval of the Projects Consulting Services Coordinator.
Base Voltage: The bus voltage calculated by starting with the nominal voltage at the
swing bus and calculated for each bus based on the transformer turns ratios.
Bus Tie Breaker: A breaker used to connect the two busses of secondary-selective
JO/EWO

10-01382
10-01382

09/21/17 10-01382

system.
Controlgear: Equipment manufactured to either 16-SAMSS-503 (LV Controlgear), 16-
07/24/17
06/28/15
DATE

SAMSS-506 (HV Controlgear) or 16-SAMSS-507 (HV Motor Controller - Outdoor).


NO.
REV

00

01
02

Demand: Electrical load averaged over a specified time period.


DISCIPLINE
ENGINEER Distribution Equipment: Equipment used to distribute power to utilization equipment or
SAG

DATE:
09/21/17
other distribution equipment. For example switchgear, controlgear, panel boards,
PROJECT
ENGINEER
switchracks, switchboards, etc.
JZM

DATE:
09/21/17 ESP: Electrical Submersible Pump
CERTIFIED
AMJ GIS: Gas Insulated Switchgear
09/21/17
DATE: High Voltage: Voltages 1000 V or greater unless otherwise designated in a specific
CONSTRUCTION
AGENCY
AMJ
MSAER or referenced international standard.
09/21/17
DATE: Low Voltage: Voltages less than 1000 V, unless otherwise designated in a specific
OPERATIONS
AFS
MSAER or referenced international standard.
09/21/17
DATE: MSAER: Mandatory Saudi Aramco Engineering Requirements.
CONTROL NUMBER
VERIFICATION

Examples of MSAERs are Saudi Aramco Materials System Specifications (SAMSSs),


EDSD

Engineering Standards (SAESs) and Standard Drawings (SASDs).


DATE:

Nominal Voltage: Refer to SAES-P-100 Table 1.


BY:
REVISIONCERTIFICATION

Operating Load:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

For new facilities: Anticipated one-hour demand based on plant or facility design
_____________________

conditions.
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 3


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
For existing facilities: When data from metering equipment is available: Maximum
AYS

AMJ
AMJ AMJ

60-minute demand measured over a minimum of one year.


AMJ
TAA
ENGG CERT

SAMSS: Saudi Aramco Materials System Specification


AYS

SAG
SAG

SBC: Saudi Building Code


SEC: Saudi Electricity Company
Secondary-Selective: A switchgear assembly consisting of two buses connected with a
ISSUED FOR CONSTRUCTION

single bus tie breaker. Each bus has one breaker to receive incoming power. (i.e., power
flow into and between the two busses is controlled with three breakers). These schemes
DESCRIPTION

AS-BUILT

AS-BUILT

are standardized. Refer to SAES-P-116 for standardized schemes.


Secondary-selective Substation: A substation fed by two independent power sources
(different transmission or distribution lines) which consists of one or more sets of two
transformers and associated secondary-selective switchgear. Also referred to as a dou-
ble-ended substation.
Switchgear: Equipment manufactured to either 16-SAMSS-502 (Low Voltage Switch-
JO/EWO

10-01382
10-01382

09/21/17 10-01382

gear) or 16-SAMSS-504 (High Voltage Switchgear).


Switchrack: Equipment manufactured per 16-SAMSS-512.
07/24/17
06/28/15
DATE

Utilization Device/Equipment: Equipment whose primary function is to convert electrical


NO.
REV

00

01
02

energy to another form or store electrical energy. Examples of utilization equipment would
DISCIPLINE
ENGINEER be motors, heaters, lamps, batteries, etc. Equipment directly feeding/controlling the
SAG

DATE:
09/21/17 utilization equipment is considered part of the utilization equipment (e.g., AFDs, reduced
PROJECT
ENGINEER voltage starters, battery chargers, etc.).
JZM

DATE:
09/21/17 3.0 REFERENCES
CERTIFIED
AMJ 3.1 Saudi Aramco Engineering Standard SAES-P-100 (Electrical Design Criteria).
09/21/17
DATE: 3.2 Saudi Aramco Engineering Standard SAES-P-104 (Wiring Methods and Materials).
CONSTRUCTION
AGENCY
AMJ
3.3 Saudi Aramco Engineering Standard SAES-P-121 (Transformers and Reactors).
09/21/17
DATE: 3.4 Design Documents And Drawings
OPERATIONS
AFS
3.4.1 Electrical One Line Diagram, Loop-01 & Loop-02, feeder-4 S/S-46, AYC-E-
DATE:
09/21/17 107-sht.074 rev. 01
CONTROL NUMBER
VERIFICATION

3.4.2 Electrical One Line Diagram, Loop-04 & Loop-05, feeder-2 S/S-46, AYC-E-
EDSD

107-sht.075 rev. 01
DATE:

3.4.3 Electrical One Line Diagram, Sewage Lift Station-1 Package-2, AYC-E-107-
BY:
REVISIONCERTIFICATION

sht.288 rev.01
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

3.4.4 Cable & Conduit Schedule, AYC-E-107-SHT.128-130 rev.03 & sht.207-215-


_____________________

rev.01- as-built.
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 4


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

4.0 PROJECT SUMMARY


AMJ
AMJ AMJ

It is proposed to expand Dhahran residential community in order to support company


AMJ
TAA
ENGG CERT

mission and accommodate manpower projected in the future. Under this BI, it is required
AYS

SAG
SAG

to construct new residential villas, apartment buildings, schools, community facilities, and
support facilities to achieve Saudi Aramco residential program.
In addition, it is requested to design new electrical power distribution system. It is planned
ISSUED FOR CONSTRUCTION

to design a new 115 kV gas insulated switchgear (GIS) substation that will interface with
National Grid 115 kV substation located at Half-moon bay via 2 underground cables.
DESCRIPTION

AS-BUILT

AS-BUILT

Moreover, the residential primary distribution system will operate at 13.8 kV through
looped pad-mounted SF6 switchgears, underground cables, and looped package
substations. A new double-ended 13.8 kV substations will be constructed to feed the
residential pad-mounted SF6 loops and all other facilities requires a 13.8 kV distribution
system such as the existing substation no. 16.
5.0 PROPOSED ELECTRICAL SYSTEM DESCRIPTION
JO/EWO

10-01382
10-01382

09/21/17 10-01382

This project will add substation no. 46 which consist of two buildings accommodating the
115 kV GIS switchgear and 13.8 kV substation feeding six 13.8 kV distribution loops.
07/24/17
06/28/15
DATE

The new electrical system will receive power via two (2) 115 kV underground cables from
NO.
REV

00

01
02

SEC. The 115 kV will be stepped down to the 13.8 kV via two (2) 115/13.8 kV transform-
DISCIPLINE
ENGINEER ers. The two transformers will supply power to the new 13.8 kV switchgear, at substation
SAG

DATE:
09/21/17 no. 46, which will be used to feed the power distribution loops next to the substation
PROJECT
ENGINEER services transformers.
JZM

DATE:
09/21/17 The scope of this job order, Package 2, is to supply and install the new 115 kV and 13.8
CERTIFIED
AMJ kV substations. The following equipment is related to ETAP study:
DATE:
09/21/17
One (1) 115 kV substation building and its service equipment.
CONSTRUCTION
AGENCY
AMJ
115 kV indoor GIS consisting of double bus, single breaker in Z shape configuration.
DATE:
09/21/17
Two (2) 115/13.8 kV, 50/67 MVA (ONAN/ONAF), 60Hz power transformers
OPERATIONS
AFS One (1) 13.8 kV substation building and its service equipment.
Four (4) 13.8 kV, 3000 A cable busses.
09/21/17
DATE:
CONTROL NUMBER
VERIFICATION

One (1) 13.8 kV, 3000 A, 40 kA for 2 sec double ended indoor metal clad switchgear.
EDSD

Two (2) 13.8/0.48 kV, 1500 kVA, 60 Hz power transformers.


DATE:

One (1) 480 V double ended indoor metal clad switchgear.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Two (2) 480 V indoor motor control centers.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

125 V battery charger systems


_____________________
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 5


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
15 kV power cables
AYS

AMJ
AMJ AMJ

Other packages, under different job orders, will be responsible for supplying and installing
AMJ
TAA
ENGG CERT

the 13.8 kV power distribution loops that consists of the following:


AYS

SAG
SAG

13.8 kV underground cables.


13.8 kV, 21 kA, 400 A Ring Main Units (RMU).
Packaged Substation (PS) consisting of the following:
ISSUED FOR CONSTRUCTION

o 13.8 kV, 21 kA, 400 A Ring Main Units.


o 13.8/0.48 kV or 13.8/0.4 kV distribution transformers.
DESCRIPTION

AS-BUILT

AS-BUILT

13.8 kV, 25 kA, 600 A pad mounted switchgears.


6.0 STUDY INPUTS AND ASSUMPTIONS
SEC (Saudi Electric Company) source ultimate, maximum and minimum fault conditions at
the point of supply are summarized as shown in Table-1:
Table 1: Utility short circuit values

3-Phase Single-Line-Ground
JO/EWO

10-01382
10-01382

09/21/17 10-01382

Type Reference
I sym I asym I sym I asym
X/R X/R
07/24/17
06/28/15
DATE

(kA) (kA) (kA) (kA)


Minimum 14.2 19.7 17.7 15.9 6.3 16.2 Attachment 1A
NO.
REV

00

01
02

DISCIPLINE
ENGINEER Maximum 15.5 20.0 19.4 17.5 6.2 17.8 Attachment 1A
SAG

DATE:
09/21/17
Ultimate 16.5 12.6 18.6 11.8 6.7 12.1 Attachment 1B
PROJECT
ENGINEER

All new electrical equipment such as switchgear, transformers, cables, and loads
JZM
09/21/17
DATE:
CERTIFIED data are based on NMR Data.
AMJ

DATE:
09/21/17 Cable lengths are based on the project cable and conduit schedule.
115 KV Incoming power cables to the GIS are assumed as 1/C 400 mm2, 1 km.
CONSTRUCTION
AGENCY
AMJ

DATE:
09/21/17 All tap changers of the transformer at all packaged substation are set one point
OPERATIONS
below the neutral point (at -2.5%).
AFS
09/21/17 7.0 ELECTRICAL SYSTEM STUDIES FOR BASE CASE
DATE:
CONTROL NUMBER

7.1 Load Flow Normal Voltage Configuration


VERIFICATION

The utility is set at minimum short circuit configuration


EDSD

Network is in normal operation. All secondary selective switchgears are operating


DATE:
BY:
REVISIONCERTIFICATION

with bus-tie in open position.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

All power distribution loops are in the normal configuration and being fed from two
_____________________

ends. The loop is normally open at the package substation in the center for each of
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 6


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

the six loops.


AMJ
AMJ AMJ

Table 2: ETAP Model Setting-Normal Case


AMJ
TAA
ENGG CERT

Configuration
Revision Study case Output report
AYS

SAG
SAG

status
Base LF_NOR LF-NORMAL LF_NOR

Results
ISSUED FOR CONSTRUCTION

The study revealed that the system is healthy and confirming to SAES-P-100
requirements. For the generated ETAP study summary, one line diagram and study
DESCRIPTION

AS-BUILT

AS-BUILT

alert, refer to Table 5, Attachment 2, 3 and 4 respectively.


7.2 Load Flow Minimum Voltage Configuration
The utility is set at minimum short circuit configuration.
All substations are in abnormal operation, one incomer/transformer is out of service,
and operating with bus-tie in close position.
All power distribution loops are being fed from one end. At the package substations
JO/EWO

10-01382
10-01382

09/21/17 10-01382

in the center, the loops are closed.


07/24/17
06/28/15
DATE

Table 3: ETAP Model Setting-Minimum Case


Configuration
Revision Study case Output report
NO.
REV

00

01
02

status
DISCIPLINE
ENGINEER Base LF_MIN_END A LF-MIN-END A LF_MIN END A
SAG
09/21/17
DATE:
PROJECT
Base LF_MIN_END B LF-MIN-END B LF_MIN END B
ENGINEER
JZM
Results
09/21/17
DATE:
CERTIFIED The study revealed that the system is healthy and confirming to SAES-P-100
AMJ
09/21/17 requirements.
DATE:
CONSTRUCTION
AGENCY
For the generated ETAP study summary, one line diagram and study alert, refer to
AMJ
09/21/17
Table 5, Attachment 2, 5, 6, 7 and 8 respectively.
DATE:
OPERATIONS 7.3 Load Flow Maximum Voltage Configuration
AFS
09/21/17
The utility is set at ultimate short circuit configuration.
DATE:
Network in normal configuration with all motors are disconnected.
CONTROL NUMBER
VERIFICATION

All secondary selective switchgears with bus-tie in open position.


EDSD

All power distribution loops are in the normal configuration and being fed from two
DATE:
BY:

ends.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 7


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

Table 4: ETAP Model Setting-Maximum Case


AMJ
AMJ AMJ

Configuration
AMJ
TAA
ENGG CERT

Revision Study case Output report


status
AYS

SAG
SAG

Base LF_MAX LF-Max LF_MAX

Results
The study revealed that the system is healthy and confirming to SAES-P-100
ISSUED FOR CONSTRUCTION

requirements.
For the generated ETAP study summary, one line diagram and study alert, refer to
DESCRIPTION

AS-BUILT

AS-BUILT

Table 5, Attachment 2, 9 and 10 respectively.

Table 5: Load Flow Studies summary for relevant buses

LOOP LF_MAX LF_MIN END A LF_MIN END B LF_NOR


Bus ID Nominal kV
No.
Voltage Voltage Voltage Voltage

Loop 1 L84-PS301 13.8 99.79 98.23 97.78 99.79


JO/EWO

10-01382
10-01382

09/21/17 10-01382

Loop 1 L84-PS312 13.8 99.63 97.82 97.93 99.63


07/24/17
06/28/15
DATE

Loop 1 L84-PS313 13.8 99.76 97.8 97.95 99.76


NO.
REV

00

01
02

Loop 1 L84-PS321 13.8 99.85 97.72 98.26 99.85


DISCIPLINE
ENGINEER
SAG
Loop 2 L85--PS301 13.8 99.8 98.24 97.78 99.8
09/21/17
DATE:
PROJECT
Loop 2 L85--PS312 13.8 99.6 97.74 97.92 99.6
ENGINEER
JZM Loop 2 L85--PS313 13.8 99.74 97.73 97.93 99.74
09/21/17
DATE:
CERTIFIED Loop 2 L85--PS322 13.8 99.83 97.65 98.23 99.84
AMJ

DATE:
09/21/17 Loop 4A L86-PS301 13.8 99.98 98.57 98.41 99.98
CONSTRUCTION
AGENCY
AMJ
Loop 4A L86-PS308 13.8 99.95 98.46 98.45 99.95
09/21/17
DATE:
Loop 4A L86-PS309 13.8 99.95 98.45 98.46 99.95
OPERATIONS
AFS Loop 4A L86-PS315 13.8 99.98 98.4 98.58 99.99
09/21/17
DATE:
Loop 4B L86-PS316 13.8 99.99 98.59 98.4 99.99
CONTROL NUMBER
VERIFICATION
EDSD

Loop 4B L86-PS324 13.8 99.94 98.45 98.45 99.94


DATE:

Loop 4B L86-PS325 13.8 99.96 98.43 98.48 99.96


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Loop 4B L86-PS331 13.8 99.99 98.4 98.57 99.99


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________

Loop 5A L87-PS301 13.8 99.95 98.45 98.32 99.96


(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 8


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

AMJ
AMJ AMJ

LOOP LF_MAX LF_MIN END A LF_MIN END B LF_NOR


Bus ID Nominal kV
No.
AMJ
TAA
ENGG CERT

Voltage Voltage Voltage Voltage


AYS

SAG
SAG

Loop 5A L87-PS310 13.8 99.89 98.24 98.38 99.89

Loop 5A L87-PS311 13.8 99.89 98.23 98.39 99.9

Loop 5A Lift Station 13.8 99.96 98.15 98.59 99.97


ISSUED FOR CONSTRUCTION

Loop 5B L87-PS323 13.8 100.02 98.6 98.22 100.03

Loop 5B L87-PS329 13.8 99.99 98.45 98.26 99.99


DESCRIPTION

AS-BUILT

AS-BUILT

Loop B L87-PS330 13.8 99.79 98.45 98.26 99.79

Loop 5B L87-PS340 13.8 99.87 98.37 98.44 99.88

7.4 Short Circuit Study


Two studies were conducted to evaluate the maximum fault level at each equipment
of the power distribution loop as follows:
JO/EWO

10-01382
10-01382

09/21/17 10-01382

7.4.1 Short Circuit Study #1-Electrical System Configuration


o The utility is set at Ultimate short circuit configuration
07/24/17
06/28/15
DATE

o One incomer/transformer in all substations are out of service, and operating


with bus-tie in close position
NO.
REV

00

01
02

DISCIPLINE
ENGINEER
o All power distribution loops are being fed from one end that is connected to bus
SAG
09/21/17 A of the main 13.8 kV switchgear at substation no. 46.
DATE:
PROJECT
ENGINEER
JZM Table 6: ETAP Model Setting-SC Ultimate (End A)
09/21/17
DATE: Configuration
CERTIFIED Revision Study case Output report
AMJ status
09/21/17
DATE: Base SC_ULT_END A SC.Ult SC_ULT_ENDA
CONSTRUCTION
AGENCY
AMJ Results
09/21/17
DATE:
OPERATIONS The study revealed that the system is healthy and confirming to SAES-P-100
AFS requirements.
09/21/17
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 9


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

Table 7: Short Circuit Results for Main Buses - Study #1


AMJ
AMJ AMJ

Device
AMJ
TAA
ENGG CERT

Nom. Momentary Duty (kA)


Case Identification Capability (kA)
Voltage Remarks
AYS

SAG
SAG

No. No. Symm Asymm Symm Symm Asymm


(kV)
(rms) (rms) (105%) (rms) (rms)
208-046-SG-
1 13.8 30 48 31.5 40 64 Acceptable
301A
ISSUED FOR CONSTRUCTION

208-046-SG-
2 13.8 30 48 31.5 40 64 Acceptable
301B
DESCRIPTION

AS-BUILT

AS-BUILT

For one line diagram and result summary refer to Attachment 11 and 12 respectively.

7.4.2 Short Circuit Study #2-Electrical System Configuration


o The utility is set at Ultimate short circuit configuration.
o Substation no. 46 in abnormal operation, one incomer/transformer is out of ser-
vice, and operating with bus-tie in close position.
o All power distribution loops are being fed from one end that is connected to bus
JO/EWO

10-01382
10-01382

09/21/17 10-01382

B of the main 13.8kV switchgear at substation no. 46.


07/24/17
06/28/15
DATE

Table 8: ETAP Model Setting-SC Ultimate (End B)


Configuration
NO.
REV

00

01
02

Revision Study case Output report


DISCIPLINE
status
ENGINEER
SAG Base SC_ULT_END B SC.Ult SC_ULT_ENDB
09/21/17
DATE:
PROJECT Results
ENGINEER
JZM The study revealed that the system is healthy and confirming to SAES-P-100
09/21/17
DATE:
CERTIFIED requirements.
AMJ
09/21/17
Table 9: Short Circuit Results for Main Buses - Study #2
DATE:
CONSTRUCTION Device
AGENCY Momentary Duty (kA)
AMJ Nom. Capability (kA)
09/21/17 Case Identification
DATE: Voltage Asymm Symm Remarks
OPERATIONS No. No. Symm Symm Asymm
(kV) (rms) (1 & 4)
AFS (rms) (rms) (rms)
09/21/17
(105%)
DATE:
208-046-SG-
CONTROL NUMBER

1 13.8 30 48 31.5 40 64 Acceptable


VERIFICATION

301A
EDSD

208-046-SG-
2 13.8 30 48 31.5 40 64 Acceptable
301B
DATE:
BY:

For one line diagram and result summary refer to Attachment 13 and 14 respectively.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 10


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc
PMT OPRNS
ASZ SAUDI ARABIAN OIL COMPANY
AFS

AFS
AYS

8.0 CONCLUSION AND RESULTS SUMMARY


AMJ
AMJ AMJ
AMJ
TAA
ENGG CERT

8.1 Load Flow:


Load flow studies results show that the proposed electrical system is in compliance
AYS

SAG
SAG

with SAES-P-100 requirements.

8.2 Short Circuit:


The results of ultimate short circuit study show that the selected rating of the
ISSUED FOR CONSTRUCTION

equipment is in compliance to SAES-P-100, requirements.


DESCRIPTION

AS-BUILT

AS-BUILT

9.0 ATTACHMENTS

Attachment 1 SEC Letter for Grid Fault Currents

Attachment 2 Load Flow Studies Summary

Attachment 3 ETAP One Line Diagram For LF_NORMAL


JO/EWO

10-01382

Attachment 4 Critical Alerts Report For LF_NORMAL


10-01382

09/21/17 10-01382

Attachment 5 ETAP One Line Diagram for LF-MIN_END A


07/24/17
06/28/15
DATE

Attachment 6 Critical Alerts Report for LF-MIN_END A


NO.
REV

00

01
02

DISCIPLINE Attachment 7 ETAP One Line Diagram for LF-MIN_END B


ENGINEER
SAG
09/21/17 Attachment 8 Critical Alerts Report for LF-MIN_END B
DATE:
PROJECT
ENGINEER
Attachment 9 ETAP One Line Diagram for LF-MAX
JZM
09/21/17
DATE:
CERTIFIED
Attachment 10 Critical Alerts Report for LF-MAX
AMJ

DATE:
09/21/17 Attachment 11 ETAP One Line Diagram for SC_ULT_END A
CONSTRUCTION
AGENCY
AMJ
Attachment 12 Short Circuit Summary Report for SC_ULT_END A
09/21/17
DATE:
OPERATIONS
Attachment 13 ETAP One Line Diagram for SC_ULT_END B
AFS
09/21/17
Attachment 14 Short Circuit Summary Report for SC_ULT_END B
DATE:
CONTROL NUMBER

Attachment 15 Reference Drawings


VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


02

_____________________
(DCC) NO. 10-01382-0004

o ETAP STUDY REPORT DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

EXPAND DHAHRAN RESIDENTIAL COMMUNITY DOC 11


UTILITIES INFRASTRUCTURES AND NETWORKS PACKAGE 2~7
S60 P HE P61024
Of 02
DHAHRAN SAUDI ARABIA JO / EWO: 10-01382-0001 195
EDSD/2616-0399.doc