HDO DOC. NO. A4-2100866-106-BEP-Vol I-004
UNIT SIZING CALCULATIONS
PARADIP REFINERY PROJECT CRS UNIT
FOR
INDIAN OIL CORPORATION LIMITED
CONSULTANT: -
FOSTER WHEELER (INDIA)
SUBMITTED
BY
DORR-OLIVER HOUSE,
CHAKALA, ANDHERI (EAST), MUMBAI 400099
INDIA
TEL. NO. :-022 28359400
FAX NO. :- 022 28365659
EL : Epoxy Lined
TD : Total Depth
SWD : Side Water Depth
FB : Free Board
MOC : Material of Construction
HRT : Hydraulic Retention Time
DVD : Dead Volume Depth .
OWS : Oily Water Sewer .
CRWS : Contaminated Rain Water Sewer .
OIL COALESCER
pH = 7.5 9.5
Operating pH range = 0 12
= 137.5 / 11
= 12.5 m2 (3)
Minimum diameter calculated D = 12.5 x 4/
= 3989 mm
= 12.571 m2 (5)
= 12.571 m2 x 0.4 m
= 5.028 m3 (6)
CARTRIDGE FILTER
= 1100 / 2
= 137.5
138 Nos.
= 183.33 m3/hr
___________
15 m/h
= 12.22 m2 (4)
= 183.33 x 10/60
= 30.56 m3 (5)
= 30.56 m3
_______
2.5 m
= 12.222 m2 (8)
INDIAN OIL CORPORATION LIMITED 8 UNIT SIZING CALCULATIONS FOR TANKS
PARADIP REFINERY PROJECT CRS UNIT DOC NO PDRP0456-8110-CA-106-0002 REV O1
[Type text]
= 3.945 mm
= 12.56 m2 (11)
= 183.33 / 12.56
= 130.56 / 12.56
= 2.433 m (13)
= (11) x 0.1
= 12.56 x 0.1
= 1.256 m3 (16)
Backwash velocity = 12 m / hr
= 40.4 m3 (26)
= 177.27 m3
_______
27.3
= 6.493 m3 (12)
= 12.03 m3 (14)
= 12.03 m3 .. (15)
= 12.03
_______
1.0
= 12.03 m2 .. (19)
__________________________
1000
= 23242.59 x 5.14
_______________
1000
= 119.54
_______
INDIAN OIL CORPORATION LIMITED 13 UNIT SIZING CALCULATIONS FOR TANKS
PARADIP REFINERY PROJECT CRS UNIT DOC NO PDRP0456-8110-CA-106-0002 REV O1
[Type text]
23.85
= 5.012 m3 (26)
= 553.4
_______
46
= 12.03 m3 (27)
Silica load on Anion Bed
As CaCO3 = 0.6 mg/l (28)
= 23242.59 m3 x 0.69 m3
_______________
1000
= 14.02
_______
1.89
= 7.415 m3
= 5.012 + 7.415
= 12.427 m3 (32)
= 12.427 m3 .. (33)
= 553.4 m3/hr
______
60 m3/hr/m2
= 9.223 m2 (35)
= 12.42
_______
1.0
= 12.42 m2 .. (36)
= 12.427 m2 (37)
_______
2.5 m
= 3.977 m
= 12.515 m2 (39)
= 0.961 m (40)
Anion Bed
INDIAN OIL CORPORATION LIMITED 16 UNIT SIZING CALCULATIONS FOR TANKS
PARADIP REFINERY PROJECT CRS UNIT DOC NO PDRP0456-8110-CA-106-0002 REV O1
[Type text]
= 0.993 M (41)
= 1.954 + 1.954
= 3.908 m
= 177.27 kg
______ x 100
988.825
= 17.927%
= 811.555 (47)
= 119.54 kg
= 12.826%
= 812.49 kg (50)
From (47) & (50)
= 0.935 / 1.37
CRS Regeneration
= 12.515 m2 (1)
In Mixed Bed, regeneration is carried out simultaneously by acid from bottom (counter current) and
Alkali from top (co flow). With this, compaction of Bed is maintained without any requirement of down
flow and up flow arrangement of water for bed compaction.
= 721.77 kg (2)
= 745.65 kg (3)
Step 1
= 9 x 12.515
= 112.635 m3/hr (6)
= 5
INDIAN OIL CORPORATION LIMITED 20 UNIT SIZING CALCULATIONS FOR TANKS
PARADIP REFINERY PROJECT CRS UNIT DOC NO PDRP0456-8110-CA-106-0002 REV O1
[Type text]
= 112.635 x 0.08333
= 9.39 m3 (8)
Step 2: Backwash
Basis of flow rate and water generated is as Step 1 , but duration of back wash is twice of that of Middle
Collector Flush, i.e. 10 min
Source: MB water
Flow Counter current
&
Alkali Pre-injection
Source: MB water
Flow Cocurrent
5
___ x X m3/hr
6
= 2 min
= 2/60
= 0.0333 hr (11)
Z1 = 5
__ x X x 0.0333 (12)
6
5
___ x Y m3/hr (13)
6
Source: MB water
Flow Counter current
&
Alkali injection
Source: MB water
Flow Cocurrent
= 15 min (17)
INDIAN OIL CORPORATION LIMITED 22 UNIT SIZING CALCULATIONS FOR TANKS
PARADIP REFINERY PROJECT CRS UNIT DOC NO PDRP0456-8110-CA-106-0002 REV O1
[Type text]
= 18.044 x 60/15
= 18.64125 x 60/15
= 5
__ x 72.176
6
From (12)
= 2.0 m3 (21)
= 5
__ x 74.565
6
From (14)
INDIAN OIL CORPORATION LIMITED 23 UNIT SIZING CALCULATIONS FOR TANKS
PARADIP REFINERY PROJECT CRS UNIT DOC NO PDRP0456-8110-CA-106-0002 REV O1
[Type text]
= 2.07 m3 (23)
Step 5: Acid Rinse
Source: MB water
Flow Counter current
&
Alkali Rinse
Source: MB water
Flow Cocurrent
= 60.14667 m3/hr
= 62.1375 m3/hr
= 48.12
_____
60.14667
= 48 min (26)
= 48.12
_____
62.1375
Basis of air mixing = 2 Nm3/hr per unit C/S area of mixed bed
= 2 Nm3/hr/m2
= 2 x 12.515
= 25.03 Nm3/min
= 25.03 x 60 Nm3/hr
= 1501.8 Nm3/hr (29)
Step 9: Filling
Source: Feed
Flow Coflow
Step 10: