1. METHODOLOGY
352557 The supervisor should also carry out a visual assessment of the joint. Hot 2. Cinta Indonesia ???
Pilih Barcode 899
bolting should not be carried out on joints which show significant signs of kalau belanja ya !!!
corrosion or necking, or which have worn or cracked threads on the 3. Daftar Orang
Terkaya Dunia 2011
fasteners 4. Daftar Orang
with Google Friend Connect Terkaya Indonesia
Hot bolting should only be attempted under operating conditions when the
Members (162) More 2011
history of the flange assembly is known, i.e. records exist for the bolt load
5. Gaji2 para atlit
The consequences of joint leakage during hot bolting should be considered
(for example, toxicity, flammability and temperature of escaping fluids) and
all necessary precautions taken. Contingency plans should also be put in
place for an escape or emergency, e.g. means of communications and
provision of standby equipment
The
Pipework within the vicinity of the joint to be hot bolted should also be
reviewed. Pipe supports for the local section should be checked to
Already a member? Sign in ascertain whether they are taking the load on the pipe, along with their connection
overall condition. If the pipework displays any significant signs of vibration has
STATISTIK ONE
around the specific flange, then hot bolting should not be considered as an timed
option
out
The site supervisor shall check that all the necessary personnel, materials
and equipment are at the worksite
The server
Each bolt shall be checked for tightness, with any abnormal conditions,
such as loose bolts, reported to the supervisor
Carry out hot bolting on one bolt at a time in accordance with the operator's L IH AT
correct sequence P RO F I L
Remove, examine, clean and lubricate each bolt, complete with nuts, for
reuse. Any damaged bolts or nuts shall be disposed of and replaced with L E NG K A P K U
new items to the correct piping specification. If there is any doubt, the Diberdayakan oleh Blogger.
materials shall be replaced. All exposed flange surfaces must be cleaned
and the area under the nuts lubricated
Note: Bolt cutting by any hot methods, including burning and grinding, is not
usually permitted during hot bolting operations. Any cold bolt cutting,
including hydraulic nut splitting, is usually only permitted by specific
approval of the relevant authority
Ensure that the bolt has been correctly tightened before moving onto the
1 of 15 12/12/2013 11:04 AM
Hot Bolting Procedure ~ oNe-way http://myone1way.blogspot.com/2011/04/hot-bolting-procedure.html
next bolt in the sequence. Initial retightening of refitted bolts shall not
introduce additional local compression of the gasket
After all the bolts have been replaced, a final tightness check shall be
carried out again.
This work will be executed on flanges of live facilities, therefore in order to avoid
potential risk of gas leakage rising through the flanges connection, the bolts
shall be released and reinstated one by one. Sequence of bolts tightening
arranged as such way to minimize the risk as defined in work steps hereafter.
Due to short length of existing bolt, torque wrench or hammer wrench will be
used for bolting / unbolting. Prior to unbolting a complete check of all new bolts
nuts (number + diameter + length + material) must be performed. Thread of
existing bolts shall be cleaned up first from any dirt, paint or corrosion by means
of paints removal and to be brushed by hand wire brush.
After one bolt has been released, then the all threads of bolt and nut shall be
properly greased prior to reinstatement.
2 of 15 12/12/2013 11:04 AM