Вы находитесь на странице: 1из 1

JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/016
TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. / Date 01 / 01-09-2008
TG & BOP MAINTENACE DEPARTMENT Rev No. / Date 00 / 01-09-2008
UNIT : EQUIPMENT : GAS DRYER
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value
Work to be done/carried out when the equipment is isolated
Take proper PTW and ensure all mechanical, electrical and C&I isolations have been
1 done. Quarterly

2 Carry out external cleaning of equipment. Quarterly

3 Clean the suction filter. Quarterly

4 Check the tightness of foundation bolts if loose then tightened the same. Quarterly

5 House keeping / Clean the surrounding area. Quarterly


Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
6 Quarterly
cleanedthe
Return andPTW
disposed.
and trial run of the equipment. If any leakage persists same is to be
7 Quarterly
rectified.

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By :

Вам также может понравиться