PRESUPUESTO

Costo Directo 275297.40


Gastos Generales (12%) 33035.69
Utilidades (10%) 27529.74 SUMA(Uti+ GG)
SUBTOTAL 335862.83
IGV(18%) 60455.31
PRESUPUESTO TOTAL 396318.14

LISTADO DE INSUMOS

Mano de Obra 51396.96


Materiales 103147.50
Equipos 120752.94
TOTAL 275297.40

FORMULA POLINOMICA
K = a Mr + b Pr + c Mr + d GGUr
Mo Po Mo GGUo

a= 0.153

b= 0.307

c= 0.360

d= 0.180

SUMA = 1.000

K = 0.147 Mr + 0.152 Pr + 0.520 Mr + 0.180 GGUr


Mo Po Mo GGUo
60565.43
CRONOGRAMA DE EJECUCION

-
MES 1 MES 2
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
Item Descripcion de la partida Und. Metrado Rendimiento # Cuadrillas D (días)

01.00 OBRAS PROVISIONALES 14.00 Instalacion


01.01 CARTEL DE OBRA 2.40 x 4.80 m und 1.00 1.00 1.00 1.00
01.02 CAMPAMENTO Y OFICINAS PROVISIONALES m2 40.00 8.00 1.00 5.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00 1.00 1.00

02.00 TRABAJOS PRELIMINARES 4.00


02.01 TRANSPORTE DE MATERIALES A OBRA glb 1.00 239.00 1.00 1.00
02.02 TRAZO NIVEL Y REPLANTEO km 1.00 1.00 1.00 1.00
02.03 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION km 1.00 0.50 1.00 2.00

03.00 EXPLANACIONES 10.00


03.01 CORTE EN TIERRA SUELTA CON TRACTOR m3 952.56 700.00 1.00 3.00
03.01 CORTE DE ROCAA SUELTA m3 1300.80 700.00 1.00 4.00
03.02 TRANSPORTE DE MATERIAL GRANULARES MAYORES A 1000M m3k 562.50 525.24 1.00 2.00
03.03 TRANSPORTE DE MATERIAL GRANULARES MENORES A 1000M m3k 337.50 836.16 1.00 1.00
03.04 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3 344.75 70.00 1.00 5.00
03.05 ELIMINACION DE MATERIAL m3 6041.82 1000.00 1.00 7.00

04.00 OBRAS DE ARTE Y DRENAJE 19.00


04.01 CONFORMACION DE CUNETAS MANUAL m 1000.00 53.33 1.00 19.00

05.00 SEÑALIZACION 1.00


05.01 SEÑALES INFORMATIVAS 0.60X2.40M und 3.00 5.00 1.00 1.00
05.02 SEÑALES PREVENTIVAS 0.60X0.60m CON POSTE und 3.00 7.00 1.00 1.00

06.00 MITIGACION DE IMPACTO AMBIENTAL 2.00


06.01 COSTO POR IMPACTO AMBIENTAL glb 1.00 0.50 1.00 2.00

07.00 FLETE TERRESTRE 1.00


07.01 FLETE TERRESTRE glb 1.00 1.00 1.00 1.00
CRONOGRAMA DE EJECUCION VALORIZADO (S/.)

-
MES 1 MES 2
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
Item Descripcion de la partida D (días)

01.00 OBRAS PROVISIONALES 14.00 Instalacion


01.01 CARTEL DE OBRA 2.40 x 4.80 m 1.00 596.9
01.02 CAMPAMENTO Y OFICINAS PROVISIONALES 5.00 6287.2
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00 4363.19

02.00 TRABAJOS PRELIMINARES 4.00


02.01 TRANSPORTE DE MATERIALES A OBRA 1.00 5.11
02.02 TRAZO NIVEL Y REPLANTEO 1.00 717.91
02.03 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION 2.00 789.58

03.00 EXPLANACIONES 10.00


03.01 CORTE EN TIERRA SUELTA CON TRACTOR 3.00 2857.68
03.01 CORTE DE ROCA SUELTA 4.00 18094.13
03.02 TRANSPORTE DE MATERIAL GRANULARES MAYORES A 1000M 2.00 1310.63
03.03 TRANSPORTE DE MATERIAL GRANULARES MENORES A 1000M 1.00 496.13
03.04 RELLENO CON MATERIAL DE PRESTAMO MANUAL 5.00 478.7 23457.29
03.05 ELIMINACION DE MATERIAL 7.00 21931.81

04.00 OBRAS DE ARTE Y DRENAJE 19.00


04.01 CONFORMACION DE CUNETAS MANUAL 19.00 208.9 731.32 731.32 2298.46

05.00 SEÑALIZACION 1.00


05.01 SEÑALES INFORMATIVAS 0.60X2.40M 1.00 2076.27
05.02 SEÑALES PREVENTIVAS 0.60X0.60m CON POSTE 1.00 828.48

06.00 MITIGACION DE IMPACTO AMBIENTAL 2.00


06.01 COSTO POR IMPACTO AMBIENTAL 2.00 6000

07.00 FLETE TERRESTRE 1.00


07.01 FLETE TERRESTRE 1.00 301.58

VALORIZACION POR SEMANA 11247.29 6655.74 63692.13 731.32 731.32 11504.79 0.00 94562.59

VALORIZACION POR MES 81595.16 12967.43 94562.59


GASTOS GENERALES (12%) 9791.4192 1556.0916 11347.5108
UTILIDADES (10%) 8159.516 1296.743 9456.259
SUBTOTAL 99546.0952 15820.2646 115366.36
IGV (18%) 17918.297136 2847.647628 20765.9448
TOTAL 117464.392336 18667.91223 136132.30
CRONOGRAMA DE UTILIZACION DE EQUIPOS

-
MES 1 MES 2
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
Item Descripcion de la partida D (días)

01.00 OBRAS PROVISIONALES 14.00 Instalacion


01.01 CARTEL DE OBRA 2.40 x 4.80 m 1.00
01.02 CAMPAMENTO Y OFICINAS PROVISIONALES 5.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00

02.00 TRABAJOS PRELIMINARES 4.00


02.01 TRANSPORTE DE MATERIALES A OBRA 1.00
02.02 TRAZO NIVEL Y REPLANTEO 1.00
02.03 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION 2.00

03.00 EXPLANACIONES 10.00


03.01 CORTE EN TIERRA SUELTA CON TRACTOR 7.00
03.02 TRANSPORTE DE MATERIAL GRANULARES MAYORES A 1000M 2.00
03.03 TRANSPORTE DE MATERIAL GRANULARES MENORES A 1000M 1.00
03.04 RELLENO CON MATERIAL DE PRESTAMO MANUAL 5.00
03.05 ELIMINACION DE MATERIAL 7.00

04.00 OBRAS DE ARTE Y DRENAJE 19.00


04.01 CONFORMACION DE CUNETAS MANUAL 19.00

05.00 SEÑALIZACION 1.00


05.01 SEÑALES INFORMATIVAS 0.60X2.40M 1.00
05.02 SEÑALES PREVENTIVAS 0.60X0.60m CON POSTE 1.00

06.00 MITIGACION DE IMPACTO AMBIENTAL 2.00


06.01 COSTO POR IMPACTO AMBIENTAL 2.00

07.00 FLETE TERRESTRE 1.00


07.01 FLETE TERRESTRE 1.00

EQUIPOS Cant. TOTAL


Jalones he 16.00 16.00
Mira Topografica he 8.00 8.00
Nivel Topografico he 12.00 12.00
Teodolito he 16.00 16.00
Miras y Jalones he 0.80 0.80
Rodillo Liso Vibratorio he 7.46 31.95 39.41
Cargador Frontal he 48.33 48.33
Volquete 15 m3 he 145.00 145.00
Tractor de Orugas hm 3.80 15.89 19.69
Tractor de Orugas de 190HP hm 22.99 30.00 52.98
Motoniveladora 125 HP hm 7.60 31.80 39.41
Camion Plataforma 4x2 122HP 8 TON hm 16.00 16.00
Camion Semitryiler 6x4 330HP 35 TON hm 8.00 8.00
Camion Volquete 4x2 140 - 210 HP 6 M3 hm 8.00 8.00
Camion Volquete 6x4 330 HP 10 M3 hm 11.82 11.82
1 9
4
CRONOGRAMA DE UTILIZACION DE MANO DE OBRA

-
MES 1 MES 2
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
Item Descripcion de la partida D (días)

01.00 OBRAS PROVISIONALES 14.00 Instalacion


01.01 CARTEL DE OBRA 2.40 x 4.80 m 1.00
01.02 CAMPAMENTO Y OFICINAS PROVISIONALES 5.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00

02.00 TRABAJOS PRELIMINARES 4.00


02.01 TRANSPORTE DE MATERIALES A OBRA 1.00
02.02 TRAZO NIVEL Y REPLANTEO 1.00
02.03 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION 2.00

03.00 EXPLANACIONES 10.00


03.01 CORTE EN TIERRA SUELTA CON TRACTOR 7.00
03.02 TRANSPORTE DE MATERIAL GRANULARES MAYORES A 1000M 2.00
03.03 TRANSPORTE DE MATERIAL GRANULARES MENORES A 1000M 1.00
03.04 RELLENO CON MATERIAL DE PRESTAMO MANUAL 5.00
03.05 ELIMINACION DE MATERIAL 7.00

04.00 OBRAS DE ARTE Y DRENAJE 19.00


04.01 CONFORMACION DE CUNETAS MANUAL 19.00

05.00 SEÑALIZACION 1.00


05.01 SEÑALES INFORMATIVAS 0.60X2.40M 1.00
05.02 SEÑALES PREVENTIVAS 0.60X0.60m CON POSTE 1.00

06.00 MITIGACION DE IMPACTO AMBIENTAL 2.00


06.01 COSTO POR IMPACTO AMBIENTAL 2.00

07.00 FLETE TERRESTRE 1.00


07.01 FLETE TERRESTRE 1.00

MANO DE OBRA Cant. TOTAL


Capataz hh 29.84 49.19 11.05 11.05 4.74 105.87
Operario hh 25.60 23.64 94.57 16.46 160.27
Oficial hh 88.00 88.00
Peon hh 256.00 81.75 97.29 110.53 110.53 83.70 739.80
Operador de Equipo Pesado hh 32.00 32.00
Carpintero Metalico hh 8.00 8.00
Topografo hh 24.00 24.00
Controlador Oficial hh 48.57 60.82 109.39
CRONOGRAMA DE UTILIZACION DE MATERIALES

-
MES 1 MES 2
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
Item Descripcion de la partida D (días)

01.00 OBRAS PROVISIONALES 14.00 Instalacion


01.01 CARTEL DE OBRA 2.40 x 4.80 m 1.00
01.02 CAMPAMENTO Y OFICINAS PROVISIONALES 5.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00

02.00 TRABAJOS PRELIMINARES 4.00


02.01 TRANSPORTE DE MATERIALES A OBRA 1.00
02.02 TRAZO NIVEL Y REPLANTEO 1.00
02.03 TRAZO, REPLANTEO Y NIVELACION DURANTE LA EJECUCION 2.00

03.00 EXPLANACIONES 10.00


03.01 CORTE EN TIERRA SUELTA CON TRACTOR 7.00
03.02 TRANSPORTE DE MATERIAL GRANULARES MAYORES A 1000M 2.00
03.03 TRANSPORTE DE MATERIAL GRANULARES MENORES A 1000M 1.00
03.04 RELLENO CON MATERIAL DE PRESTAMO MANUAL 5.00
03.05 ELIMINACION DE MATERIAL 7.00

04.00 OBRAS DE ARTE Y DRENAJE 19.00


04.01 CONFORMACION DE CUNETAS MANUAL 19.00

05.00 SEÑALIZACION 1.00


05.01 SEÑALES INFORMATIVAS 0.60X2.40M 1.00
05.02 SEÑALES PREVENTIVAS 0.60X0.60m CON POSTE 1.00

06.00 MITIGACION DE IMPACTO AMBIENTAL 2.00


06.01 COSTO POR IMPACTO AMBIENTAL 2.00

07.00 FLETE TERRESTRE 1.00


07.01 FLETE TERRESTRE 1.00

MATERIALES Cant. TOTAL


Clavos para Madera con cabeza de 2" Kg 42.00 42.00
Clavos para Madera con cabeza de 3" Kg 1.00 1.00
Clavos para Calamina Kg 2.00 2.00
Piedra Mediana m3 0.20 0.20
Hormigon puesto en Obra glb 3.92 3.92
Material de Relleno m3 68.95 275.80 344.75
Cemento Portland TIPO I (42.5Kg) bol 3.36 3.36
Yeso bolsa 18kg bol 0.08 0.08
Calamina #31 de 1.83m X 0.83m X 2.7mm pza 48.00 48.00
Madera Tornillo p2 125.10 125.10
Estacas de Madera pza 46.00 46.00
Triplay LUPUNA 4x8x4 mm pln 23.00 23.00
Plancha Galbanizada de 1/16" m2 4.62 4.62
Pintura Esmalte gal 0.10 0.10
Pintura Esmalte Sintetico gal 0.25 0.25
Pintura Fosforescente gal 4.47 4.47
Pintura Anticorrosiva gal 4.47 4.47
Thinner gal 4.47 4.47
1/2 Baño Blanco jgo 0.80 0.80
Arandela Galbanizada de 1/2" pza 18.00 18.00
TUBO Fo GALV. De 2" m 26.40 26.40
Perno de F°G° 1/2" X 3" und 18.00 18.00
Wincha de 5 m und 0.05 0.05
Wincha de 50 m und 0.07 0.07
Agua para Riego m3 6.21 24.82 31.03
Cordel m 50.00 50.00