This document contains information about a civil engineering module taught at Arusha Technical College. It lists the module name as Engineering Statistics, code as CIU 08105, and instructor as Shomari Hhomo. It then lists 4 students enrolled in the module along with their admission numbers. The document goes on to discuss site instructions, confirming that they are orders given by the engineer to the contractor regarding work execution, material purchasing, testing, and design issues. It notes that site instructions must be in written form and describes how variation orders relate to site instructions and how delays in instructions or orders can result in claims from the contractor.
This document contains information about a civil engineering module taught at Arusha Technical College. It lists the module name as Engineering Statistics, code as CIU 08105, and instructor as Shomari Hhomo. It then lists 4 students enrolled in the module along with their admission numbers. The document goes on to discuss site instructions, confirming that they are orders given by the engineer to the contractor regarding work execution, material purchasing, testing, and design issues. It notes that site instructions must be in written form and describes how variation orders relate to site instructions and how delays in instructions or orders can result in claims from the contractor.
This document contains information about a civil engineering module taught at Arusha Technical College. It lists the module name as Engineering Statistics, code as CIU 08105, and instructor as Shomari Hhomo. It then lists 4 students enrolled in the module along with their admission numbers. The document goes on to discuss site instructions, confirming that they are orders given by the engineer to the contractor regarding work execution, material purchasing, testing, and design issues. It notes that site instructions must be in written form and describes how variation orders relate to site instructions and how delays in instructions or orders can result in claims from the contractor.
PROGRAMME: BACHELOR OF CIVIL AND IRRIGATION ENGINEERING
MODULE NAME: ENGINEERING STATISTICS
MODULE CODE: CIU 08105
INSTRUCTOR’S NAME: SHOMARI, HHO
PARTICIPANTS:
NO. NAMES ADMISSION NUMBER
1 GIFT NGOMUO 140204130
2 SIFA NGABILE 14020413028
4 CHING’TONY D. MBUMA 14020413007
5 KULWA JOSEPH 140204130
1. Site instruction A site instruction is an order given by engineer (consultant) or his representatives delegated to the contractor for the execution of works , purchase of goods, testing material , design issues , etc. 2. Yes An instruction is related to site works as per the paragraph two “the engineer may issue to the contractor (at any time) instructions and additional or modified drawings which may be necessary for the execution of the works and the remedying of any defects, all in accordance with the contract” 3. A) Site instruction includes the following i. Information on execution of the work ii. Information on purchasing of goods iii. Information on material testing and iv. Designing issues B) The instruction is in documented form since it is the one which is operative but when issuing the oral instruction it will not be operative unless confirmed in writing by the contractor within the time specified. 4. A) A variation order is the instruction that may be initiated by the engineer at any time prior to issuing the taking over certificate for the works either by an instruction or by the request for the contractor to submit a proposal. B) Yes it is related to site instruction since it can be issued by 5. Yes, if there is a delay on the site instruction or the variation order the contractor may claim for an extension of time, cost and reasonable profit. 6. Engineer can avoid the claim by asking additional documents from the contractor