CORROSION SERVICES
L.L.C
OMAN
PAINTING & BLASTING
Tel: +968 9661 4825, Fax: 24497047, Way No: 6826, Villa No: 1729, P.O Box: 206, PC: 103
Azaiba North, Muscat, Sultanate of Oman
CONTENTS
Part 1. Introduction
Part 4. ISO
Part 5. JSRS
Part 6. Experience
Part 7. Current Projects
2
PART 1. INTRODUCTION
BUISNESS PROFILE
3
PART 2. HISTORICAL INFORMATION
• International Corrosion Services
L.L.C was incorporated in Oman
in June 2015, under the rules
and regulations of the Ministry
of Commerce and Industry and
was issued license No. 1220245
5
PART 4. INTERNATIONAL ORGANISATION FOR
STANDARDIZATION (ISO)
6
PART 5. JOINT SUPPLIER REGISTRATION SYSTEM
7
PART 6. EXPERIENCE
Dismantling/Erection, mechanical
Sohar Power repair, internal and external blasting OCT Mar
Sohar Power Sohar 129,870
Company and painting/coating of seawater 2010 2011
Company
pipings for 4 desalination units
Sohar Bulk Jetty SAIPEM- Abrasive blasting and coatings of JAN JUL
Sohar 129,870
Port Project AFCONS JV diameter 56” Jetty Piles 2010 2011
WINTECO/ WINTECO/ Internal and external painting works for DEC NOV
Sohar 254,545
DAEWOO DAEWOO 2 spherical tanks and 1 cone roof 2010 2011
Arabian OCT
OCCIDENTAL Internal and External painting works for JUN
Industrial Sohar 2011 190,844
MUKHIAZNAH 2 spherical tanks and 1 cone roof 2011
Services
9
PART 6. EXPERIENCE
• Fireproofing
DURATION PERIOD: 2004 - 2006
• Painting
JOB VALUE: USD 3,500,000 • Insulation
10
PART 6. EXPERIENCE
• Painting
DURATION PERIOD: 2005 - 2007
• Abrasive Blasting
JOB VALUE: USD 1,875,000
11
PART 6. EXPERIENCE
SOHAR POWER COMPANY
12
PART 7. CURRENT PROJECTS
PROJECT OVERVIEW: CPF KHAZZAN
Auto Blasting and Painting of 110,000 M2 of pipe at the Central Processing Facility (CPF) on
Block 61 at Khazzan, Sultanate of Oman. Blast cleaning and coating of 5 storage tanks.
The CPF will include two process trains, each having a capacity of 525 million standard
cubic feet of gas per day. The project also includes an associated condensate processing
system, power generation plant, water treatment system and all associated utilities and
infrastructure. The project is expected to be completed in 2017.
MAIN CONTRACTOR: The CPF is being developed by B.P. Exploration (Epsilon) Ltd.,
E.P.C CONTRACTOR: Petrofac is the Engineering, Procurement and Construction (EPC) Company, for the Central
Processing Facility (CPF) at the Khazzan Field.
MECHANICAL & CIVIL SUBCONTRACTOR: C.C.C. (Consolidated Contractors Company) is the Mechanical and
Civil Subcontractor for the development of the central processing facility (CPF) at the Khazzan field.
BLASTING AND PAINTING SUBCONTRACTOR: ICS (International Corrosion Services) is the blasting and painting
subcontractor.
13
PART 7. CURRENT PROJECTS
PROJECT OVERVIEW: CPF KHAZZAN
14
PART 7. CURRENT PROJECTS
PROJECT OVERVIEW: CPF KHAZZAN
• ICS also operates a 72 inch rotating automatic blast
cleaning turntable machine, to blast clean small spools, pipe
saddles and E&I fixtures and fittings.
15
PART 7. CURRENT PROJECTS
PROJECT OVERVIEW: CPF KHAZZAN
ICS is also responsible for blast cleaning and coating of 5 storage tanks
16
INTERNATIONAL CORROSION SERVICES
PAINTING AND BLASTING
Tel: +968 9661 4825, GSM: +968 95443447