DAILY ACTIVITY REPORT

SL NO. PACKAGE EQUIPMENT CENTRE

PRIMARY CRUSHER/COAL SHED

TRANSFER HOUSE 1

TRANSFER TOWER 2

CONVEYOR 1A & 1B

1 CHP
CONVEYOR 2A &2B

1 CHP

CONVEYOR 3A &3B

CONVEYOR 4A & 4B

CONVEYOR 5A & 5B
SECONDARY CRUSHER HOUSE

BOILER -I

STRUCTURAL

PRESSURE PART
ROTATING EQUIPMENTS

HOT AIR PATH

COLD AIR PATH


FLUE GAS PATH

FUEL PATH

INSULATION

ESP

BOILER -II

STRUCTURAL
PRESSURE PART

ROTATING EQUIPMENTS
2 BOILER & ESP

HOT AIR DUCTING

COLD AIR DUCTING


FLUE GAS DUCTING

FUEL PATH

INSULATION

ESP
TG TO BOILER INTERCONNECTION

RAW WATER PUMP HOUSE

CLARIFIED WATER PUMP HOUSE

CW AND ACW PUMP HOUSE


UTILITY WATER PUMP HOUSE

COMPRESSOR HOUSE

3 LP PIPING

FIRE FIGHTING SYSTEM

LDO SYSTEM
PIPE RACK

FABRICATION & ERECTION OF PIPING

FANS ,GEAR BOXES,PROPELLER SHAFT &


STRUCTURALS

COOLING DISTRIBUTION PIPE LINES


4 TOWER DRIFT ELIMINATORS & SPLASH GUARDS
COOLING
4 TOWER

DECK RAILING WORK.

STRUCTURAL

TURBINE

TURBOGENERATOR

5 TG BUILDING
CONDENSER
AUXILLARIES

FABRICATION & ERECTION OF PIPING

LUBE OIL SYSTEM

AC DUCTING WORK

STRUCTURAL

ERECTION OF EMBEDED PLATES & OPENING


6 ASH SILO
ASH HANDLING EQUIPMENT

ASH TRANFER PIPE LINE


STRUCTURAL

EQUIPMENT ERECTION

WATER
7 TREATMENT
PLANT
FABRICATION & ERECTION OF PIPING

CHEMICAL HOUSE

WATER RESERVOIR
MANPOWER DETAILS
SL NO CONTRACTOR MANPOWER
GIRI
1 CONSTRUCTIONS 23
(HAZEMAG)
2 THERMAX 118
3 GPR 33
4 APT 20
5 SUVENDU SAHU 0
JOSEPH
6 12
CONSTRUCTIONS

7 ION EXCHANGE 0
CTIVITY REPORT (MECHANICAL- CPP) DATE-07.11.13

No activity

No activity

Erection of all the staircase columns completed & erection of tie


beams is in progress.

No activity
No activity

No activity

Assembly & welding of gallery is in progress. Final welding of TR-5


completed.

Assembly work of Structures & final welding completed.


Civil work in progress.

Final painting work in progress.

No activity
Completed

Completed

Completed
No activity

Completed

No activity

No activity

Fixing of net in pent house for insulation completed. Final painting


work in progress. Erection & welding of monorail support structure &
monorail for ID FAN completed. Erection of monorail support
structure & monorail for PA FAN & SA FAN is completed & welding is
in progress.Structural finishing work to complete.
Welding of supporting structures in progress. Refractory work in
furnace zone is in progress.

Erection of BAC FAN 3 & 4 monorail support structure started.


Erection of BAC FAN 3 & 4 started.

Final welding of man hole in super heater zone stared. Ducting from
PA line to Wind box to complete. Erection of PA FAN to APH
connecting duct completed & final welding is in progress. Erection of
duct connecting APH to ESP completed & welding in progress.

Erection & welding of secondary air duct fitting work is in progress


.Ducting work from SA FAN to APH is in progress.
Welding of ID FAN-4 inlet ducting is in prorgess. Refractory work
inside furnace zone is in progress. Erection of economiser casing
completed & Welding of economiser casing to complete. Ducting
work from ESP to ID FAN is in progress.

Erection of covering plates of coal bunker is in progress. Erection of


MDC bypass line completed.

Insulation process started.

Final welding of hopper is in progress. Erection of monorail support


columns is completed & final welding is in progress. Erection &
welding of handrailing is in progress.
Fixing of plate on the beam of TG building completed. Erection of
connecting beam to start. Fabrication of walkway support beam for
boiler is in progress.

Erection of 2 nos of pumps completed. Asssembly of fittings to the


outlet header completed. Welding of pipe line from raw water pump
house to chemical house completed .

Assembly of suction & discharge line inside pump house to complete.

Erection of 8 Mtr 1600NB CW line header completed & alignment is in


progress. Fabrication & erection of CW Pump suction line is in
progress.Welding of 1400NB bend is in progress. Erection of ACW
400NB bend is completed. Erection of EOT crane complete final
commisioning is awaited.
No activity as monitoring basin Civil work yet to start.

Commissioning process of instrument air compressor & dryer started.


All the pipe line works from instrument air & conveying air
compressor till boiler completed & final welding & fitting work
completed. Temporary air line connection from pipe rack to TG
building completed.

Painting & rapping coating of MS Pipes is pipes.

Civil foundation work has started.


Fabrication of cable rack support for cooling tower completed.
Erection of cable rack connecting to compressor house to complete.

Erection of 8 Mtr 1600NB CW line header completed & alignment is in


progress. Erection of 1400NB bend Connecting to main header
completed & welding started. Erection of 400NB bend Connecting to
main header is in progress. Fabrication of 1400NB bend for CW Return
line is completed. Fabrication of reducer 1600NB to 1400NB is in
progress.

All materials shifted close to Cooling Tower.

No activity

No activity
Railing work in staircase is in progress .

Dismantleing and shifting of temporary staircase to ground floor.

Alignment of lower casing is in progress.Erection of Inner casing


started.

No activity

No activity
Insulation material received at site and unloading is in progress.

Welding of pipe line connecting from CEP Discharge line to steam jet
air ejector is in progress. Fabrication & assembly of pipe valves
connecting condensate float tank is in progress.

Welding of pipe line is in progress.

No activity

No activity

No activity

No activity

No activity
Rework process of the purlins damaged in cyclone started.

No activity

No activity

No activity

No activity
DATE-07.11.13
PLANNED FOR REMARK
TOMORROW

Hoppers, railings & chutes for feeder breaker


No activity awaited at site. Party has been followed up.

No activity Transfer Chutes awaited at Site

Erection of tie beams to


continue.

Follow up on for Short Post and stringers for


No activity inclined ramp.
No activity Idler frames & Idler not received at site.

No activity Civil foundation work yet to be completed

Trussel fabrication completed & gallery to be


received.party not despatching further materials
despite of repeated reminders. Rigorous followup
Same to continue required as party is not able to provide any
evidence of work in progress.WITHOUT GALLERY
IT IS NOW UNSAFE TO HOLD THE ERECTED
TRUSSELS FOR LONG.

Erection work to start after


transfer house -2 erection
completion.
Civil work to continue. Civil work yet to be completed

All fabrication scraps being cut


for use & house keeping work
to continue. Painting work to
continue.
Same to continue
Same to continue

Same to continue

Same to continue

Same to continue
Same to continue

Same to continue

Same to continue
Erection of connecting beam to
start.

Alignment of pumps to
complete.

Same to Continue.

Alignment of base frame to be taken after


Same to continue erection of suction line to pump.
Same to continue

Same to continue

Civil foundation work started.fabricated tank


Same to continue received at site.
Erection of cable rack support
for cooling tower to start.

Same to continue

Civil work yet to be completed & mobilisation to


be started by Paltech.Paltech to mobilise site by
Same to continue 15/9/13. Civil work not yet completed. Expected
completion by 30/10/13.

Shifting completed same as above

Shifting completed. same as above


West side railing work of cooling tower staircase
to be taken up after completion of deck railing.

No activity

Same to Continue.

No activity

No activity
No activity

Same to continue

Same to continue

No activity

No activity

Erection of liner plates for fly


ash & bed ash silo to start.

No activity

No activity
Same to continue

No activity

No activity

No activity

No activity