Bar bending schedule (or schedule of bars) is a list of reinforcement bars, vis-à-vis, a given RCC work item, and is
presented in a tabular form for easy visual reference. This table summarizes all the needed particulars of bars –
diameter, shape of bending, length of each bent and straight portions, angles of bending, total length of each bar, and
number of each type of bar. This information is a great help in preparing an estimate of quantities.
Figure 1 depicts the shape and proportions of hooks and bends in the reinforcement bars – these are standard
proportions that are adhered to:
(a) Length of one hook = (4d ) + [(4d+ d )] – where, (4d+ d ) refers to the curved portion = 9d.
(b) The additional length (la) that is introduced in the simple, straight end-to-end length of a reinforcement bar due to
being bent up at ø⁰ say 30o to 60o, but it is generally 45o) = l1 – l2= la
Where,
Giving different values to Ø (=30⁰, 45⁰ and 60⁰ respectively), we get different values of la, as tabulated below:
http://arunksaini.blogspot.in/search/label/BBS 1/2
12/26/2017 Civil Engineering eBooks: BBS
Figure 2 presents the procedure to arrive at the length of hooks and the total length of a given steel reinforcement.