1. Procured Parts, sub-contract, services (From SHEET 2) BOP Scrap Value = Sub Total (1) = 0
2. Raw Material e.g. standard sheet stock, tube, bar, plate, foil, strip, plastics, composites - per unit length, area, mass, or quantity etc.
Reclaim
Ex. Gross Net UOM Price / Scrap Mat. O/H
Desc./Type/Size/Grade/Supplier value / Unit Cost
Rate Usage Usage (eg. kg) UOM (%) (%)
UOM
£0.000
3. Process Costs
parts for Op.
Total Labour
(minutes) to
Machine or
(Rate/Hr.)
(Rate/Hr.)
Direct Lab.
Quantity of
Equipment
Equipment
Setup time
Social O/H
Heads (for
make One
Direct Lab
Other O/H
Operation
(Rate/Hr.)
(Rate/Hr.)
(minutes)
Unit Cost
Op. Description (basic for Op. &
Setup
Scrap
Cost
Cost
part.
time
Equipment type)
Op)
(%)
Process Cost - Con't. Sheet = Yes/No Yes Sub Total (3) = 0.00
General Overheads
Other Costs (Pl. specify)
August 2007 Economics - Material & Labour, Other Costs (Pl. specify)
delivered ex-works
Profit How calculated? (e.g. R.O.S. or R.O.C.)
Sub Total (4) = 0.00
0 Model/Type: 0
3. Process Costs
(%)
of parts for Op.
Setup Quantity
Total Labour
Op.
(minutes) to
Machine or
Direct Lab.
Equipment
Equipment
Social O/H
Setup time
Direct Lab
Other O/H
(Rate/Hr.)
(Rate/Hr.)
(Rate/Hr.)
(Rate/Hr.)
Unit Cost
(minutes)
Description (basic for Op. & Equipment
Scrap
type)
Cost
Cost
Process Costs Scrap Value = 0.000 Sub-total Process Costs (2) = 0.000
QUOTATION ANALYSIS FOR
Tooling costs
Supplier: 0
Ref. 0 Date: 3/26/2007 Part No.: 0 Desc: Disk
Sheet 4 of 4 sheets in total Volumes: 0 0 0 Issue No:
0 Model/Type: 0