Slab Deflections
Spreadsheet includes construction load effects
Fig. 1: Schematic load history for a slab in a multi-story building where Δw(tj) is an increment of load applied at time tj and
constructed using one level of shoring and two levels of reshoring Ec is a function of fc′, which is also a function of time.10
The modulus of elasticity at time ti is obtained from
actual deflections?
EXCELLENCE
I
T
Y C O R P O R AT I O N
® Environmentally Safe VpCI ®/MCI ® Technologies
will underestimate the actual dead load deflection Cracked Beam Testing of Surface Treatments. Details: www.CortecMCI.com
because it fails to account for cracking due to construction
Total Corrosion, Coulombs
surface, both to be measured when the forms and Cortec’s Migrating Corrosion Inhibitors (MCI®) offer superior corro-
shores are still in place. An elevation that is 3/4 in. sion protection for new and existing structures. Proven to penetrate
(19 mm) lower than the design elevation might simply to embedded reinforcement, MCI® can reduce corrosion rates as
much as 80%. This offers an economical solution to more expensive
be the result of an initially low (yet within tolerance)
cathodic protection systems used for concrete. For more informa-
slab elevation. It’s also important to note that if the tion, including testing and case histories, please visit our newly up-
slab surface elevations were not taken when the forms dated website:
and shores were in place, the datum for slab deflections w w w. C o r t e c M C I . c o m
should be the elevation of the slab surface at the 1-800-4-CORTEC