Sr. item Page Description Responsible department Meeting 27 Dec.

2017
2 FIRING LINE CONFIGURATION (WS0-3)
2.1 WS0
20 h 9 3 high back chairs to be provided for NDT department ‫اﻹدارﯾﺔ‬ Waiting for Admin. to provide
Welding store not properly equipped for maintaining and controlling the
environment. Example: air dryer was not installed and due to this many of the Regular Sandwich panels will provided, date is required by admin.
29 f 11 welding wire for repairs got very rusty. ‫اﻹدارﯾﺔ‬ Dep.
Now air drier have been installed closed to the end of the first campaign. Heat Waiting for Saipem to confirm
insulation to be installed in the welding store.
SWSe workshop for the welding technicians and for the maintenance of the
welding equipment very tiny (approx. 2 square meters).
1. Regular Sandwich panels will provided, date is required by admin,
1. Not properly insulated from the outside precipitations (water flow inside
‫اﻹدارﯾﺔ‬ Waiting for Saipem to confirm
30 g 11 trough the walls).
‫ﺗﻜﻨﻮﻟﻮﺟﯿﺎ اﻟﻤﻌﻠﻮﻣﺎت‬
2. Computer and designated line missing for Weld tech to be used for
2. Ongoing with purchasing, ETA : 1st of Feb. 2018
communication, reports, orders, etc.
SWSe system for test bench not present in the workshop.
47 a 15 Industrial laundry/drier machine shall be purchased (not domestic) ‫اﻹدارﯾﺔ‬ Waiting for admin. dep. to advise by date of supply and install
1. All items onboard PMS12 that are not needed for the project shall be offloaded
1. ongoing and barge will be ready before sailing to project location
before the start.
‫ﻛﻞ اﻷﻗﺴﺎم‬ 2. enlarging is not applicable, new office craven contain two offices
52 f 15 2. SAIPEM and CLIENT offices shall be enlarged.
‫اﻹدارﯾﺔ‬ will be provided, date of supply and install is required by admin. dep.
Once useless items are removed from office floor, space can be recovered for
and to be installed by 10 days prior leaving dry dock
another office-container (Client Fig.20)
Actions to be taken in order to avoid flies in the kitchen. Light doors with
53 g 16 ‫اﻹدارﯾﺔ‬ Admin. dep. to advise by actions
mosquito net or other solution to be adopted. Not hygienic
1. Kitchen air ducts are oily inside. Deep overhaul to be performed. Oil Filters to
1. Maint. dep. to advise
be installed, extraction of exhaust gas to be improved. ‫اﻟﺼﯿﺎﻧﺔ‬
54 h 16
‫اﻹدارﯾﺔ‬
2. Admin. dep. will install new door within 15/1/2018
2. Bakery shall be isolated from crane pedestal suitable hygienic doors
69 k 17 Lower kitchen shall be equipped with fire proof door. ‫اﻹدارﯾﺔ‬ Admin dep. to advise by supplying date
Fresh food: fruits, vegetables, eggs, yogurts, shall be provided regularly:
86 d 17 ‫اﻹدارﯾﺔ‬ OK
minimum weekly.
87 e 18 Light drinks to be available for all crew ‫اﻹدارﯾﺔ‬ OK
1. Gym equipment are available at Maadia store
‫اﻹدارﯾﺔ‬ 2. A dedicated area under the Masjid identified.
88 f 18 Dedicated area for gym with few equipment shall be provided
‫اﻟﺒﺤﺮﯾﺔ‬ 3. Material for build the area still required (PE to advise)
4. Admin to install a sound proof sandwich panel for the gym area.
Professional company to be hired with trained personnel for room/office cleaning
89 g 18 ‫اﻹدارﯾﺔ‬ OK
and cooking.
Subcontractor agreed to provide new food container, admin dep. to
90 h 18 New food container to be provided for food transfer. ‫اﻹدارﯾﺔ‬
follow up
91 i 18 Water container to be fit for purpose (with door). ‫اﻹدارﯾﺔ‬ Admin dep. to advise by supply date
‫اﻹدارﯾﺔ‬ 1. Area identified
Increase number of European toilets to be available on deck and in offices /
92 j 18 ‫ﺗﻨﻔﯿﺬ اﻟﻤﺸﺮوﻋﺎت‬ 2. Material for build the area still required (PE to advise)
common areas
‫اﻟﺼﯿﺎﻧﺔ‬ 3. Maint. dep. to construct the swage system