NOTES: 1) DATUM ELEVATION = 100’—0” ASSUMED. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF ALL INTERIOR NONLOAD—BEARING WALLS NOT LOCATED ON STRUCTURAL DRAWINGS COORDINATE BREAK SEAT ELEVATIONS & LOCATION OF STEPS WITH SITE PLAN & ARCHITECTURAL CONTROL JOINTS. CONTROL JOINTS IN THE CONCRETE SLAB IMMEDIATELY AFTER SET UP. REFER TO INGS, BUT MAXIMUM SPACING SHALL BE 16’—0" IN EITHER DIRECTION (TYPICAL UNLESS NOTED OTHERWISE). TOP OF ALL EXTERIOR FOOTINGS SHALL BE 2’-6” BELOW FINISHED FLOOR (TYP. U.N.O.) TOP OF ALL INTERIOR FOOTINGS SHALL BE 8” BELOW FINISHED FLOOR (TYP. U.N.O.) PROVIDE THICKENED SLAB UNDER ALL WALLS WITHOUT FOOTINGS SHOWN CONTRACTOR SHALL COORDINATE FLOOR DRAINS, AND DEPTHS WITH MECHANICAL. REFER TO ARCH. FOR REQ'’D FLOOR SLOPE. CONTRACTOR SHALL COORDINATE BRICK SEAT ELEVATIONS WITH SITE GRADING PLAN REFER TO ARCH