Sl No Location Nature of Job

1 Cable Tray Erection Work

2 RM-5 (5.2 Mtrs Level) Earthing Flat Erection Work

3 Structural Steel Erection Work

4 Structural Steel Erection Work

5 CJH-8 to CC-19 Cable Tray Erection Work

6 Earthing Flat Erection Work

Base Frame erection for Simens supply MCC


7 RM-1 (0.00 Mts Lvl) Panel.(Structural Steel)

8 Structural Steel Erection Work

Incoming Cable From


9 Cable Tray Erection Work
RM-4 to RM-5

10 Earthing Flat Erection Work

11 Cable Tray Erection Work

WT-1&2,3&4 (57.468 Mtrs &


12 Structural Steel Erection Work
68.9 Mtrs)
WT-1&2,3&4 (57.468 Mtrs &
68.9 Mtrs)

13 Earthing Flat Erection Work

14 CC-2 Conveyor Gallery Structural Steel Erection Work

15 CC-3 Conveyor Gallery Structural Steel Erection Work

16 CC-4 Conveyor Gallery Structural Steel Erection Work

17 CO-31 Conveyor Gallery Structural Steel Erection Work

Total Cost
ADDITIONAL WORK DET

Reason for Additional work UOM Quantity

Mtr 200

Additonal Tray was erected at RM-5 as per Mtr 60


direction of TSL concern.

MT 0.27

MT 6.754

Cable route was converted from duct back to Mtr 950


cable gallery.

Mtr 455

Based on the TSL advise, we have erceted the MT 1.4


base frame of MCC panel at RM-1.

MT 3.2

Cable route was converted from duct back to Mtr 1500


cable gallery.

Mtr 1020

Mtrs 109
Tray work at WT is excluded in our scope matrix
but based on the TSL advise we have erected MT 0.87
some extra tray to compensate the lighting
cable routing.
Tray work at WT is excluded in our scope matrix
but based on the TSL advise we have erected
some extra tray to compensate the lighting
cable routing.
Mtrs 109

MT 0.55

Due to unavilability of structural support in the


beginning of the execution, TSL ask L&T to MT 1.15
provide tray support at conveyor gallary to
carried out the tray work which are actally MT 0.945
exculded in our contract.

MT 0.737
DDITIONAL WORK DETAILS AT KPO RMHS
605

Total Erection Cost


Unit MD Total MD
Labour Cost Consumable OH Cost
Cost

0.5 100 60,500 3,025 19,058

0.28 16.8 10,164 508 3,202

52 14.04 8,494 425 2,676

52 351.208 212,481 10,624 66,931

0.5 475 287,375 14,369 90,523

0.28 127.4 77,077 3,854 24,279

52 72.8 44,044 2,202 13,874

52 166.4 100,672 5,034 31,712

0.5 750 453,750 22,688 142,931

0.28 285.6 172,788 8,639 54,428

0.5 54.5 32,973 1,649 10,386

52 45.24 27,370 1,369 8,622


0.28 30.52 18,465 923 5,816

52 28.6 17,303 865 5,450

52 59.8 36,179 1,809 11,396

52 49.14 29,730 1,486 9,365

52 38.324 23,186 1,159 7,304

1,612,550 80,628 507,953


Total Supply Cost
total erection as
per new format unit rate of Unit rate Material Cost
erection

82,583 412.91 650 130,000

13,874 231.23 145 8,700

11,595 42,942.90 44,500 12,015

290,036 42,942.90 44,500 300,553

392,267 412.91 650 617,500

105,210 231.23 145 65,975

60,120 42,942.90 44,500 62,300

137,417 42,942.90 44,500 142,400

619,369 412.91 650 975,000

235,856 231.23 145 147,900

45,007 412.91 650 70,850

37,360 42,942.90 44,500 38,715


25,204 231.23 145 15,805

23,619 42,942.90 44500 24,475

49,384 42,942.90 44500 51,175

40,581 42,942.90 44500 42,053

31,649 42,942.90 44500 32,797

2,738,212
Annexure-2

total supply cost as per Total Value


new format (Supply+Erection)

212,583

22,574

23,610

590,589

1,009,767

171,185

122,420

279,817

1,594,369

383,756

115,857

76,075
41,009

48,094

100,559

82,634

64,445

4,939,343
Sl No Location Nature of Job

1 SEP Panel Dismantling & Re-Installation


RM-5 (8.4 Mtrs Level)
2 Structural Steel Dismantling & Re-erection

3 Battery Charger Dismantling & Re-Installation


RM-5 (8.4 Mtrs Level)
4 Structural Steel Dismantling & Re-erection
Remote control panel Dismantling & Re-
5 Installation
RM-5 (8.4 Mtrs Level)
6 Structural Steel Dismantling & Re-erection

7 RM-5 (5.2 Mtrs Level) Cable Tray Dismantling & Re-erection

RM-5 (14.6 Mtrs)False


8 Cable Tray Dismantling & Re-erection
Floor

9 Cable Tray Dismantling & Re-erection

10 CO-7,8 & 9 Conveyor Structural Steel Dismantling & Re-erection


Galleries
11 Earthing Flat Dismantling & Re-erection

12 Structural Steel Dismantling & Re-erection

13 Cable Tray Dismantling & Re-erection


MSB Near CO-7,8 & 9
14 Galleries Earthing Flat Dismantling & Re-erection

15
Light Fitting with JB & support Dismantling and
Re-erection
16
17
CC-1 & CO-3 Tunnel Light fittings with JB & Support Dismantling
18

19 Primary Coal Crusher Earth Electrode Re-erection

20 Coal Tripper Gallery Earth Electrode Re-erection

21 CJH-9 Earth Electrode Re-erection

22 CJH-7 Earth Electrode Re-erection

23 CJH-4 Earth Electrode Re-erection

24 CJH-5 Earth Electrode Re-erection

25 CJH-8 Earth Electrode Re-erection

26 RM-10 Earth Electrode Re-erection

27 RM-4 Earth Electrode Re-erection

28 Cole Blending Bunker Earth Electrode Re-erection

29 Cable Tray Dismantling & Re-erection


Coke Primary Screen
House (67.0 Mtrs Level)
30 Structural Steel Dismantling & Re-erection

31 Cable Tray Dismantling & Re-erection

32 Structural Steel Dismantling & Re-erection


Coke Primary Screen
House (58.8 Mtrs Level)
33 Cable Tray Dismantling & Re-erection

34 Structural Steel Dismantling & Re-erection

35 MLDB Panel Dismantling & Re-Installation


RM-6 (12 Mtrs Level)
36 Structural Steel Dismantling & Re-erection

37 UPS Panel Dismantling & Re-Installation


Blower House
38 Structural Steel Dismantling & Re-erection

39 Cable Tray Dismantling & Re-erection


CO-34 Conveyor Gallery
CO-34 Conveyor Gallery
40 Structural Steel Dismantling & Re-erection

41 Structural Steel Dismantling & Re-erection

42 Coal Blending Bunker Cable Tray Dismantling & Re-erection

43 Earthing Flat Dismantling & Re-erection

Total Cost
REWORK DETAIL OF KPO RMHS

Item Description Reason for Rework UOM

SEP Panel Nos


Based on the TSL advise, SEP panel location has
been changed 3 times at RM-5.
Structural Steel MT

Battery Charger Nos


As per TSL Direction,Battery Charger location has
been changed 2 times at RM-5.
Structural Steel MT

Remote Control Panel Nos


Based on the TSL advise, 2 Nos RCP panel location
has been changed 3 times at RM-5.
Structural Steel MT

HT cable tray work has been modified as per TSL


MS Cable Tray Mtr
advise.

Due to modification in the false flooring and


MS Cable Tray according to TSL asvise, we converted all tray from Mtr
600 to 300.

MS Cable Tray Mtr


We have carried out tray modification at some of
Structural Steel the locations because at the time of exceution MT
nither stair case was erected nor it was indicated
at structural gallery.
Earthing Flat Mtrs

Structural Steel MT

MS Cable Tray Mtrs


We have modified entire tray work at MCB area
Earthing Flat near JH-2 Due to modification of structural work. Mtrs

Structural Steel MT

Light Fittings Nos


Structural Steel MT
Due to AC Duct.
Light Fittings Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

Earth Electrode Damaged by other agency. Nos

MS Cable Tray Mtrs


Due to mechanical Mono rail.
Structural Steel MT

MS Cable Tray Mtrs


Due to Walk Way Cable Tray has Dismelted & Re-
erected.
Structural Steel MT

MS Cable Tray Mtrs


Due to PJB,CJB & LCS location changed.
Structural Steel MT

MLDB Panel Nos


Location has changed after Erection.
Structural Steel MT

UPS Panel After Installation UPS rating has changed for both Nos
RM-8 & BH by MND.
Structural Steel So,dismalting the same & erect the another one. MT

MS Cable Tray Mtrs


Due to Conveyor door.
Due to Conveyor door.
Structural Steel MT

Structural Steel MT

MS Cable Tray Due to mechanical Mono rail. Mtr

Earthing Flat Mtr


OF KPO RMHS
Total Erection Cost
Quantity Total Consumable
Unit MD Labour Cost OH Cost
MD Cost

2 6 12 7,260 363 2,287

0.8 52 41.6 25,168 1,258 7,928

1 15 15 9,075 454 2,859

0.42 52 21.84 13,213 661 4,162

4 6 24 14,520 726 4,574

0.6 52 31.2 18,876 944 5,946

30 0.5 15 9,075 454 2,859

215 0.5 107.5 65,038 3,252 20,487

175 0.5 87.5 52,938 2,647 16,675

0.82 52 42.64 25,797 1,290 8,126

175 0.28 49 29,645 1,482 9,338

1.1 52 57.2 34,606 1,730 10,901

180 0.5 90 54,450 2,723 17,152

180 0.28 50.4 30,492 1,525 9,605

0.2 52 10.4 6,292 315 1,982

12 3.5 42 25,410 1,271 8,004


0.2 52 10.4 6,292 315 1,982

12 1.5 18 10,890 545 3,430

2 28 56 33,880 1,694 10,672

3 28 84 50,820 2,541 16,008

4 28 112 67,760 3,388 21,344

1 28 28 16,940 847 5,336

4 28 112 67,760 3,388 21,344

4 28 112 67,760 3,388 21,344

4 28 112 67,760 3,388 21,344

6 28 168 101,640 5,082 32,017

2 28 56 33,880 1,694 10,672

2 28 56 33,880 1,694 10,672

60 0.5 30 18,150 908 5,717

0.55 52 28.6 17,303 865 5,450

90 0.5 45 27,225 1,361 8,576

0.8 52 41.6 25,168 1,258 7,928

60 0.5 30 18,150 908 5,717

0.34 52 17.68 10,696 535 3,369

1 10 10 6,050 303 1,906

0.45 52 23.4 14,157 708 4,459

1 6 6 3,630 182 1,143

0.4 52 20.8 12,584 629 3,964

18 0.5 9 5,445 272 1,715


0.15 52 7.8 4,719 236 1,486

1.25 52 65 39,325 1,966 12,387

240 0.5 120 72,600 3,630 22,869

98 0.28 27.44 16,601 830 5,229

1,272,920 63,646 400,970


Annexure-1

Supply Cost
Total Value
Qty Unit Rate Material Cost (Supply+Erection)

- 9,910

0.8 44,500 35,600 69,954

- 12,387

0.42 44,500 18,690 36,726

- 19,820

0.6 44,500 26,700 52,466

30 650 19,500 31,887

215 650 139,750 228,526

175 650 113,750 186,010

0.82 44,500 36,490 71,703

175 145 25,375 65,840

1.1 44,500 48,950 96,187

180 650 117,000 191,324

180 145 26,100 67,722

0.2 44,500 8,900 17,489

12 1,525 18,300 52,985


0.2 44,500 8,900 17,489

12 1,525 18,300 33,165

2 1,350 2,700 48,946

3 1,350 4,050 73,419

4 1,350 5,400 97,892

1 1,350 1,350 24,473

4 1,350 5,400 97,892

4 1,350 5,400 97,892

4 1,350 5,400 97,892

6 1,350 8,100 146,839

2 1,350 2,700 48,946

2 1,350 2,700 48,946

60 650 39,000 63,775

0.55 44,500 24,475 48,094

90 650 58,500 95,662

0.8 44,500 35,600 69,954

60 650 39,000 63,775

0.34 44,500 15,130 29,731

- 8,258

0.45 44,500 20,025 39,349

- 4,955

0.4 44,500 17,800 34,977

18 650 11,700 19,132


0.15 44,500 6,675 13,116

1.25 44,500 55,625 109,304

240 650 156,000 255,099

98 145 14,210 36,871

1,199,245 2,936,781
ADDIT

Sl No Location Nature of Job

1 Cable Tray Erection Work

2 RM-5 (5.2 Mtrs Level) Earthing Flat Erection Work

3 Structural Steel Erection Work

4 Structural Steel Erection Work

5 CJH-8 to CC-19 Cable Tray Erection Work

6 Earthing Flat Erection Work

Base Frame erection for Simens


7 RM-1 (0.00 Mts Lvl) supply MCC Panel.(Structural
Steel)

8 Structural Steel Erection Work

Incoming Cable From


9 Cable Tray Erection Work
RM-4 to RM-5

10 Earthing Flat Erection Work

11 Cable Tray Erection Work

12 WT-1&2,3&4 (57.468 Mtrs & 68.9 Mtrs) Structural Steel Erection Work
WT-1&2,3&4 (57.468 Mtrs & 68.9 Mtrs)

13 Earthing Flat Erection Work

14 CC-2 Conveyor Gallery Structural Steel Erection Work

15 CC-3 Conveyor Gallery Structural Steel Erection Work

16 CC-4 Conveyor Gallery Structural Steel Erection Work

17 CO-31 Conveyor Gallery Structural Steel Erection Work

Total Cost>>>>
ADDITIONAL WORK DETAILS OF KPO RMHS

Varified
Reason for Additional work UOM Qunatity by
MND / TSL

Mtr 120

Additonal Tray was erected at RM-5 as per direction of Mtr 50


TSL concern.

MT 0.162

MT 4.61

Cable route was converted from duct back to cable Mtr 648
gallery.

Mtr 40

Based on the TSL advise, we have erceted the base frame MT 1.4
of MCC panel at RM-1.

MT 2.176

Cable route was converted from duct back to cable Mtr 1020
gallery.

Mtr 1020

Mtrs 0

Tray work at WT is excluded in our scope matrix but


based on the TSL advise we have erected some extra tray MT 0
to compensate the lighting cable routing.
Tray work at WT is excluded in our scope matrix but
based on the TSL advise we have erected some extra tray
to compensate the lighting cable routing.

Mtrs 0

MT 0.2

Due to unavilability of structural support in the beginning MT 0


of the execution, TSL ask L&T to provide tray support at
conveyor gallary to carried out the tray work which are
actally exculded in our contract. MT 0.15

MT 0.737
Annexure-2

605
Erection Cost Total Supply Cost
Total Value
Unit Total (Supply+Erec
Total Unit Rate
erection Erection Cost of material material tion)
rate Cost

412.9 49,550 650 78,000 127,550

231.2 11,562 145 7,250 18,812

42,942.9 6,957 44,500 7,209 14,166

42,942.9 197,835 44,500 205,009 402,844

412.9 267,567 650 421,200 688,767

231.2 9,249 145 5,800 15,049

42,942.9 60,120 44,500 62,300 122,420

42,942.9 93,444 44,500 96,832 190,276

412.9 421,171 650 663,000 1,084,171

231.2 235,856 145 147,900 383,756

- - 650 - -

- - 44,500 - -
- - 145 - -

42,942.9 8,589 44500 8,900 17,489

- - 44500 - -

42,942.9 6,441 44500 6,675 13,116

42,942.9 31,649 44500 32,797 64,445

1,399,989 1,742,871 3,142,860


Sl No Location

1
RM-5 (8.4 Mtrs Level)
2

3
RM-5 (8.4 Mtrs Level)
4

5
RM-5 (8.4 Mtrs Level)
6

7 RM-5 (5.2 Mtrs Level)

8 RM-5 (14.6 Mtrs)False Floor

9
10 CO-7,8 & 9 Conveyor
Galleries
11
12
13
MSB Near CO-7,8 & 9
Galleries
14 MSB Near CO-7,8 & 9
Galleries
15
16
17
CC-1 & CO-3 Tunnel
18
19 Primary Coal Crusher
20 Coal Tripper Gallery
21 CJH-9
22 CJH-7
23 CJH-4
24 CJH-5
25 CJH-8
26 RM-10
27 RM-4
28 Cole Blending Bunker
29
Coke Primary Screen House
30 (67.0 Mtrs Level)

31
32 Coke Primary Screen House
33 (58.8 Mtrs Level)
34
35
RM-6 (12 Mtrs Level)
36
37
Blower House
38
39
CO-34 Conveyor Gallery
40
41
42 Coal Blending Bunker
43

Total Cost>>>>
REWO

Nature of Job Item Description

SEP Panel Dismantling & Re-Installation SEP Panel


Structural Steel Dismantling & Re-erection Structural Steel

Battery Charger Dismantling & Re-Installation Battery Charger

Structural Steel Dismantling & Re-erection Structural Steel


Remote control panel Dismantling & Re-
Installation Remote Control Panel

Structural Steel Dismantling & Re-erection Structural Steel

Cable Tray Dismantling & Re-erection MS Cable Tray

Cable Tray Dismantling & Re-erection MS Cable Tray

Cable Tray Dismantling & Re-erection MS Cable Tray


Structural Steel Dismantling & Re-erection Structural Steel
Earthing Flat Dismantling & Re-erection Earthing Flat
Structural Steel Dismantling & Re-erection Structural Steel
Cable Tray Dismantling & Re-erection MS Cable Tray
Earthing Flat Dismantling & Re-erection Earthing Flat

Light Fitting with JB & support Dismantling and Structural Steel


Re-erection Light Fittings
Structural Steel
Light fittings with JB & Support Dismantling
Light Fittings
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Earth Electrode Re-erection Earth Electrode
Cable Tray Dismantling & Re-erection MS Cable Tray

Structural Steel Dismantling & Re-erection Structural Steel

Cable Tray Dismantling & Re-erection MS Cable Tray


Structural Steel Dismantling & Re-erection Structural Steel
Cable Tray Dismantling & Re-erection MS Cable Tray
Structural Steel Dismantling & Re-erection Structural Steel
MLDB Panel Dismantling & Re-Installation MLDB Panel
Structural Steel Dismantling & Re-erection Structural Steel
UPS Panel Dismantling & Re-Installation UPS Panel

Structural Steel Dismantling & Re-erection Structural Steel


Cable Tray Dismantling & Re-erection MS Cable Tray
Structural Steel Dismantling & Re-erection Structural Steel
Structural Steel Dismantling & Re-erection Structural Steel
Cable Tray Dismantling & Re-erection MS Cable Tray
Earthing Flat Dismantling & Re-erection Earthing Flat

Total Cost>>>>
REWORK DETAILS OF KPO RMHS

Varified
Qunatity
Reason for Rework UOM by MND /
TSL

Based on the TSL advise, SEP panel location has Nos 2


been changed 3 times at RM-5. MT 0.06

As per TSL Direction,Battery Charger location has Nos 1


been changed 2 times at RM-5.
MT 0.10

Based on the TSL advise, 2 Nos RCP panel location Nos 4


has been changed 3 times at RM-5.
MT 0.20
HT cable tray work has been modified as per TSL Mtr 30
advise.
Due to modification in the false flooring and
according to TSL asvise, we converted all tray from Mtr 200
600 to 300.

We have carried out tray modification at some of Mtr 150


the locations because at the time of exceution MT 0.70
nither stair case was erected nor it was indicated
at structural gallery. Mtrs 135
MT 1.04
Mtrs 170
We have modified entire tray work at MCB area
near JH-2 Due to modification of structural work.
We have modified entire tray work at MCB area Mtrs 150
near JH-2 Due to modification of structural work.
MT 0.20
Nos 12
MT 0.20
Due to AC Duct.
Nos 12
Damaged by other agency. Nos 2
Damaged by other agency. Nos 1
Damaged by other agency. Nos 2
Damaged by other agency. Nos 1
Damaged by other agency. Nos 2
Damaged by other agency. Nos 0
Damaged by other agency. Nos 0
Damaged by other agency. Nos 2
Damaged by other agency. Nos 2
Damaged by other agency. Nos 2
Mtrs 60
Due to mechanical Mono rail.
MT 0.55

Due to Walk Way Cable Tray has Dismelted & Re- Mtrs 90
erected. MT 0.80
Mtrs 60
Due to PJB,CJB & LCS location changed.
MT 0.34
Nos 0.00
Location has changed after Erection.
MT 0.00
After Installation UPS rating has changed for both Nos 1
RM-8 & BH by MND.
So,dismalting the same & erect the another one. MT 0.00
Mtrs 18
Due to Conveyor door.
MT 0.15
MT 0.42
Due to mechanical Mono rail. Mtr 80
Mtr 25
Annexure-1

Erection Cost Supply Cost

Unit Varified
Total erection Unit rate Total
erection Qunatity by
cost
rate MND / TSL of material material cost

4955.0 9,910 -
42942.9 2,577 0.06 44,500 2,670

12387.4 12,387 -

42942.9 4,294 0.1 44,500 4,450

4955.0 19,820 -

42942.9 8,589 0.2 44,500 8,900

412.9 12,387 30 650 19,500

412.9 82,583 200 650 130,000

412.9 61,937 150 650 97,500


42942.9 30,183 0.70 44,500 31,150
231.2 31,216 135 145 19,575
42942.9 44,613 1.04 44,500 46,280
412.9 70,195 170 650 110,500
231.2 34,685 150 145 21,750
42942.9 8,589 0.2 44,500 8,900
2890.4 34,685 12 1,525 18,300
42942.9 8,589 0.2 44,500 8,900
1238.7 14,865 12 1,525 18,300
23123.1 46,246 2.00 1,350 2,700
23123.1 23,123 1.00 1,350 1,350
23123.1 46,246 2.00 1,350 2,700
23123.1 23,123 1.00 1,350 1,350
23123.1 46,246 2.00 1,350 2,700
23123.0 - 0.00 1,350 -
23123.0 - 0.00 1,350 -
23123.1 46,246 2.00 1,350 2,700
23123.1 46,246 2.00 1,350 2,700
23123.1 46,246 2.00 1,350 2,700
412.9 24,775 60 650 39,000

42942.9 23,619 0.55 44,500 24,475

412.9 37,162 90 650 58,500


42942.9 34,354 0.8 44,500 35,600
412.9 24,775 60 650 39,000
42942.9 14,601 0.34 44,500 15,130
0.0 - -
0.0 - 0 44,500 -
4955.0 4,955 -

0.0 - 0 44,500 -
412.9 7,432 18 650 11,700
42942.9 6,441 0.15 44,500 6,675
42942.9 17,893 0.42 44,500 18,690
412.9 33,033 80 650 52,000
231.2 5,781 25 145 3,625

1,050,646 869,970
Annexure-1

Total Value
(Supply+Erection)

9,910
5,247

12,387

8,744

19,820

17,489

31,887

212,583

159,437
61,333
50,791
90,893
180,695
56,435
17,489
52,985
17,489
33,165
48,946
24,473
48,946
24,473
48,946
-
-
48,946
48,946
48,946
63,775

48,094

95,662
69,954
63,775
29,731
-
-
4,955

-
19,132
13,116
36,583
85,033
9,406

1,920,616
Sl No Location

1
2 RM-5 (5.2 Mtrs Level)
3
4
5 CJH-8 to CC-19
6

7 RM-1 (0.00 Mts Lvl)

8
Incoming Cable From
9 RM-4 to RM-5
10
11
12 WT-1&2,3&4 (57.468 Mtrs & 68.9 Mtrs)
13
14 CC-2 Conveyor Gallery
15 CC-3 Conveyor Gallery
16 CC-4 Conveyor Gallery
17 CO-31 Conveyor Gallery
Total Cost>>>>

Sl No Location
Sl No Location

1
RM-5 (8.4 Mtrs Level)
2

3
RM-5 (8.4 Mtrs Level)
4

5
RM-5 (8.4 Mtrs Level)
6

7 RM-5 (5.2 Mtrs Level)

8 RM-5 (14.6 Mtrs)False Floor

10 CO-7,8 & 9 Conveyor Galleries

11

12

13
MSB Near CO-7,8 & 9 Galleries
MSB Near CO-7,8 & 9 Galleries
14
15
16
17
CC-1 & CO-3 Tunnel
18
19 Primary Coal Crusher
20 Coal Tripper Gallery
21 CJH-9
22 CJH-7
23 CJH-4
24 CJH-5
25 CJH-8
26 RM-10
27 RM-4
28 Cole Blending Bunker
29
Coke Primary Screen House (67.0
Mtrs Level)
30

31

32
Coke Primary Screen House (58.8
Mtrs Level)
33

34

35
RM-6 (12 Mtrs Level)
36
37
Blower House
38

39
CO-34 Conveyor Gallery
40

41

42 Coal Blending Bunker

43

Total Cost>>>>
ADDITIONAL WORK DET

Nature of Job

Cable Tray Erection Work


Earthing Flat Erection Work
Structural Steel Erection Work
Structural Steel Erection Work
Cable Tray Erection Work
Earthing Flat Erection Work
Base Frame erection for Simens supply MCC
Panel.(Structural Steel)
Structural Steel Erection Work
Cable Tray Erection Work
Earthing Flat Erection Work
Cable Tray Erection Work
Structural Steel Erection Work
Earthing Flat Erection Work
Structural Steel Erection Work
Structural Steel Erection Work
Structural Steel Erection Work
Structural Steel Erection Work
tal Cost>>>>

REWO

Nature of Job
Nature of Job

SEP Panel Dismantling & Re-Installation

Structural Steel Dismantling & Re-


erection
Battery Charger Dismantling & Re-
Installation
Structural Steel Dismantling & Re-
erection
Remote control panel Dismantling & Re-
Installation
Structural Steel Dismantling & Re-
erection

Cable Tray Dismantling & Re-erection

Cable Tray Dismantling & Re-erection

Cable Tray Dismantling & Re-erection

Structural Steel Dismantling & Re-


erection

Earthing Flat Dismantling & Re-erection

Structural Steel Dismantling & Re-


erection

Cable Tray Dismantling & Re-erection


Earthing Flat Dismantling & Re-erection

Light Fitting with JB & support


Dismantling and Re-erection
Light fittings with JB & Support
Dismantling
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Earth Electrode Re-erection
Cable Tray Dismantling & Re-erection

Structural Steel Dismantling & Re-


erection

Cable Tray Dismantling & Re-erection

Structural Steel Dismantling & Re-


erection

Cable Tray Dismantling & Re-erection

Structural Steel Dismantling & Re-


erection
MLDB Panel Dismantling & Re-
Installation
Structural Steel Dismantling & Re-
erection
UPS Panel Dismantling & Re-Installation

Structural Steel Dismantling & Re-


erection

Cable Tray Dismantling & Re-erection

Structural Steel Dismantling & Re-


erection
Structural Steel Dismantling & Re-
erection

Cable Tray Dismantling & Re-erection

Earthing Flat Dismantling & Re-erection

tal Cost>>>>
ADDITIONAL WORK DETAILS OF KPO RMHS

Reason for Additional work

Additonal Tray was erected at RM-5 as per direction of


TSL concern.

Cable route was converted from duct back to cable


gallery.

Based on the TSL advise, we have erceted the base frame


of MCC panel at RM-1.

Cable route was converted from duct back to cable


gallery.

Tray work at WT is excluded in our scope matrix but


based on the TSL advise we have erected some extra tray
to compensate the lighting cable routing.

Due to unavilability of structural support in the beginning


of the execution, TSL ask L&T to provide tray support at
conveyor gallary to carried out the tray work which are
actally exculded in our contract.

REWORK DETAILS OF KPO RMHS

Item Description
Item Description

SEP Panel

Structural Steel

Battery Charger

Structural Steel

Remote Control Panel

Structural Steel

MS Cable Tray

MS Cable Tray

MS Cable Tray

Structural Steel

Earthing Flat

Structural Steel

MS Cable Tray
Earthing Flat
Structural Steel
Light Fittings
Structural Steel
Light Fittings
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
MS Cable Tray

Structural Steel

MS Cable Tray

Structural Steel

MS Cable Tray

Structural Steel

MLDB Panel

Structural Steel
UPS Panel

Structural Steel

MS Cable Tray

Structural Steel

Structural Steel

MS Cable Tray

Earthing Flat
DETAILS OF KPO RMHS
605
Erection Cost
Varified
UOM Qunatity by Unit
MND / TSL erection
rate
Mtr 120 412.9
Mtr 50 231.2
MT 0.162 42,942.9
MT 4.61 42,942.9
Mtr 648 412.9
Mtr 40 231.2

MT 1.4 42,942.9

MT 2.176 42,942.9
Mtr 1020 412.9
Mtr 1020 231.2
Mtrs 0 -
MT 0 -
Mtrs 0 -
MT 0.2 42,942.9
MT 0 -
MT 0.15 42,942.9
MT 0.737 42,942.9

WORK DETAILS OF KPO RMHS


Varified
Qunatity
Reason for Rework UOM by MND /
TSL
Varified
Qunatity
Reason for Rework UOM by MND /
TSL

Based on the TSL advise, SEP panel Nos 2


location has been changed 3 times at
RM-5. MT 0.06

As per TSL Direction,Battery Charger Nos 1


location has been changed 2 times at
RM-5. MT 0.10

Based on the TSL advise, 2 Nos RCP Nos 4


panel location has been changed 3
times at RM-5. MT 0.20

HT cable tray work has been modified Mtr 30


as per TSL advise.

Due to modification in the false


flooring and according to TSL asvise, Mtr 200
we converted all tray from 600 to 300.

Mtr 150
We have carried out tray modification
at some of the locations because at
the time of exceution nither stair case MT 0.70
was erected nor it was indicated at
structural gallery.
Mtrs 135

MT 1.04

We have modified entire tray work at Mtrs 170


MCB area near JH-2 Due to
modification of structural work.
We have modified entire tray work at
MCB area near JH-2 Due to
modification of structural work. Mtrs 150
MT 0.20
Nos 12
MT 0.20
Due to AC Duct.
Nos 12
Damaged by other agency. Nos 2
Damaged by other agency. Nos 1
Damaged by other agency. Nos 2
Damaged by other agency. Nos 1
Damaged by other agency. Nos 2
Damaged by other agency. Nos 0
Damaged by other agency. Nos 0
Damaged by other agency. Nos 2
Damaged by other agency. Nos 2
Damaged by other agency. Nos 2
Mtrs 60
Due to mechanical Mono rail.
MT 0.55

Mtrs 90
Due to Walk Way Cable Tray has
Dismelted & Re-erected.
MT 0.80

Mtrs 60
Due to PJB,CJB & LCS location changed.
MT 0.34

Nos 0.00
Location has changed after Erection.
MT 0.00
After Installation UPS rating has Nos 1
changed for both RM-8 & BH by MND.
So,dismalting the same & erect the
another one. MT 0.00

Mtrs 18
Due to Conveyor door.
MT 0.15

MT 0.42

Due to mechanical Mono rail. Mtr 80

Mtr 25
Annexure-2

Erection Cost Total Supply Cost


Total Value
Total (Supply+Erec
Total Unit Rate
Erection Cost of material material tion)
Cost
49,550 650 78,000 127,550
11,562 145 7,250 18,812
6,957 44,500 7,209 14,166
197,835 44,500 205,009 402,844
267,567 650 421,200 688,767
9,249 145 5,800 15,049

60,120 44,500 62,300 122,420

93,444 44,500 96,832 190,276


421,171 650 663,000 1,084,171
235,856 145 147,900 383,756
- 650 - -
- 44,500 - -
- 145 - -
8,589 44500 8,900 17,489
- 44500 - -
6,441 44500 6,675 13,116
31,649 44500 32,797 64,445
1,399,989 1,742,871 3,142,860

Annexure-1

Erection Cost Supply Cost


Varified
Unit Total Qunatity Unit rate of Total
erection erection by MND / material material
rate cost TSL cost

4955.0 9,910 -

42942.9 2,577 0.06 44,500 2,670

12387.4 12,387 -

42942.9 4,294 0.1 44,500 4,450

4955.0 19,820 -

42942.9 8,589 0.2 44,500 8,900

412.9 12,387 30 650 19,500

412.9 82,583 200 650 130,000

412.9 61,937 150 650 97,500

42942.9 30,183 0.70 44,500 31,150

231.2 31,216 135 145 19,575

42942.9 44,613 1.04 44,500 46,280

412.9 70,195 170 650 110,500


231.2 34,685 150 145 21,750
42942.9 8,589 0.2 44,500 8,900
2890.4 34,685 12 1,525 18,300
42942.9 8,589 0.2 44,500 8,900
1238.7 14,865 12 1,525 18,300
23123.1 46,246 2.00 1,350 2,700
23123.1 23,123 1.00 1,350 1,350
23123.1 46,246 2.00 1,350 2,700
23123.1 23,123 1.00 1,350 1,350
23123.1 46,246 2.00 1,350 2,700
23123.0 - 0.00 1,350 -
23123.0 - 0.00 1,350 -
23123.1 46,246 2.00 1,350 2,700
23123.1 46,246 2.00 1,350 2,700
23123.1 46,246 2.00 1,350 2,700
412.9 24,775 60 650 39,000

42942.9 23,619 0.55 44,500 24,475

412.9 37,162 90 650 58,500

42942.9 34,354 0.8 44,500 35,600

412.9 24,775 60 650 39,000

42942.9 14,601 0.34 44,500 15,130

0.0 - -

0.0 - 0 44,500 -
4955.0 4,955 -

0.0 - 0 44,500 -

412.9 7,432 18 650 11,700

42942.9 6,441 0.15 44,500 6,675

42942.9 17,893 0.42 44,500 18,690

412.9 33,033 80 650 52,000

231.2 5,781 25 145 3,625

### 869,970
Annexure-1

Total Value
(Supply+Erection)
Total Value
(Supply+Erection)

9,910

5,247

12,387

8,744

19,820

17,489

31,887

212,583

159,437

61,333

50,791

90,893

180,695
56,435
17,489
52,985
17,489
33,165
48,946
24,473
48,946
24,473
48,946
-
-
48,946
48,946
48,946
63,775

48,094

95,662

69,954

63,775

29,731

-
4,955

19,132

13,116

36,583

85,033

9,406

1,920,616