ADDITIONAL WORK DET
Mtr 200
MT 0.27
MT 6.754
Mtr 455
MT 3.2
Mtr 1020
Mtrs 109
Tray work at WT is excluded in our scope matrix
but based on the TSL advise we have erected MT 0.87
some extra tray to compensate the lighting
cable routing.
Tray work at WT is excluded in our scope matrix
but based on the TSL advise we have erected
some extra tray to compensate the lighting
cable routing.
Mtrs 109
MT 0.55
MT 0.737
DDITIONAL WORK DETAILS AT KPO RMHS
605
2,738,212
Annexure-2
212,583
22,574
23,610
590,589
1,009,767
171,185
122,420
279,817
1,594,369
383,756
115,857
76,075
41,009
48,094
100,559
82,634
64,445
4,939,343
Sl No Location Nature of Job
15
Light Fitting with JB & support Dismantling and
Re-erection
16
17
CC-1 & CO-3 Tunnel Light fittings with JB & Support Dismantling
18
Total Cost
REWORK DETAIL OF KPO RMHS
Structural Steel MT
Structural Steel MT
UPS Panel After Installation UPS rating has changed for both Nos
RM-8 & BH by MND.
Structural Steel So,dismalting the same & erect the another one. MT
Structural Steel MT
Supply Cost
Total Value
Qty Unit Rate Material Cost (Supply+Erection)
- 9,910
- 12,387
- 19,820
- 8,258
- 4,955
1,199,245 2,936,781
ADDIT
12 WT-1&2,3&4 (57.468 Mtrs & 68.9 Mtrs) Structural Steel Erection Work
WT-1&2,3&4 (57.468 Mtrs & 68.9 Mtrs)
Total Cost>>>>
ADDITIONAL WORK DETAILS OF KPO RMHS
Varified
Reason for Additional work UOM Qunatity by
MND / TSL
Mtr 120
MT 0.162
MT 4.61
Cable route was converted from duct back to cable Mtr 648
gallery.
Mtr 40
Based on the TSL advise, we have erceted the base frame MT 1.4
of MCC panel at RM-1.
MT 2.176
Cable route was converted from duct back to cable Mtr 1020
gallery.
Mtr 1020
Mtrs 0
Mtrs 0
MT 0.2
MT 0.737
Annexure-2
605
Erection Cost Total Supply Cost
Total Value
Unit Total (Supply+Erec
Total Unit Rate
erection Erection Cost of material material tion)
rate Cost
- - 650 - -
- - 44,500 - -
- - 145 - -
- - 44500 - -
1
RM-5 (8.4 Mtrs Level)
2
3
RM-5 (8.4 Mtrs Level)
4
5
RM-5 (8.4 Mtrs Level)
6
9
10 CO-7,8 & 9 Conveyor
Galleries
11
12
13
MSB Near CO-7,8 & 9
Galleries
14 MSB Near CO-7,8 & 9
Galleries
15
16
17
CC-1 & CO-3 Tunnel
18
19 Primary Coal Crusher
20 Coal Tripper Gallery
21 CJH-9
22 CJH-7
23 CJH-4
24 CJH-5
25 CJH-8
26 RM-10
27 RM-4
28 Cole Blending Bunker
29
Coke Primary Screen House
30 (67.0 Mtrs Level)
31
32 Coke Primary Screen House
33 (58.8 Mtrs Level)
34
35
RM-6 (12 Mtrs Level)
36
37
Blower House
38
39
CO-34 Conveyor Gallery
40
41
42 Coal Blending Bunker
43
Total Cost>>>>
REWO
Total Cost>>>>
REWORK DETAILS OF KPO RMHS
Varified
Qunatity
Reason for Rework UOM by MND /
TSL
Due to Walk Way Cable Tray has Dismelted & Re- Mtrs 90
erected. MT 0.80
Mtrs 60
Due to PJB,CJB & LCS location changed.
MT 0.34
Nos 0.00
Location has changed after Erection.
MT 0.00
After Installation UPS rating has changed for both Nos 1
RM-8 & BH by MND.
So,dismalting the same & erect the another one. MT 0.00
Mtrs 18
Due to Conveyor door.
MT 0.15
MT 0.42
Due to mechanical Mono rail. Mtr 80
Mtr 25
Annexure-1
Unit Varified
Total erection Unit rate Total
erection Qunatity by
cost
rate MND / TSL of material material cost
4955.0 9,910 -
42942.9 2,577 0.06 44,500 2,670
12387.4 12,387 -
4955.0 19,820 -
0.0 - 0 44,500 -
412.9 7,432 18 650 11,700
42942.9 6,441 0.15 44,500 6,675
42942.9 17,893 0.42 44,500 18,690
412.9 33,033 80 650 52,000
231.2 5,781 25 145 3,625
1,050,646 869,970
Annexure-1
Total Value
(Supply+Erection)
9,910
5,247
12,387
8,744
19,820
17,489
31,887
212,583
159,437
61,333
50,791
90,893
180,695
56,435
17,489
52,985
17,489
33,165
48,946
24,473
48,946
24,473
48,946
-
-
48,946
48,946
48,946
63,775
48,094
95,662
69,954
63,775
29,731
-
-
4,955
-
19,132
13,116
36,583
85,033
9,406
1,920,616
Sl No Location
1
2 RM-5 (5.2 Mtrs Level)
3
4
5 CJH-8 to CC-19
6
8
Incoming Cable From
9 RM-4 to RM-5
10
11
12 WT-1&2,3&4 (57.468 Mtrs & 68.9 Mtrs)
13
14 CC-2 Conveyor Gallery
15 CC-3 Conveyor Gallery
16 CC-4 Conveyor Gallery
17 CO-31 Conveyor Gallery
Total Cost>>>>
Sl No Location
Sl No Location
1
RM-5 (8.4 Mtrs Level)
2
3
RM-5 (8.4 Mtrs Level)
4
5
RM-5 (8.4 Mtrs Level)
6
11
12
13
MSB Near CO-7,8 & 9 Galleries
MSB Near CO-7,8 & 9 Galleries
14
15
16
17
CC-1 & CO-3 Tunnel
18
19 Primary Coal Crusher
20 Coal Tripper Gallery
21 CJH-9
22 CJH-7
23 CJH-4
24 CJH-5
25 CJH-8
26 RM-10
27 RM-4
28 Cole Blending Bunker
29
Coke Primary Screen House (67.0
Mtrs Level)
30
31
32
Coke Primary Screen House (58.8
Mtrs Level)
33
34
35
RM-6 (12 Mtrs Level)
36
37
Blower House
38
39
CO-34 Conveyor Gallery
40
41
43
Total Cost>>>>
ADDITIONAL WORK DET
Nature of Job
REWO
Nature of Job
Nature of Job
tal Cost>>>>
ADDITIONAL WORK DETAILS OF KPO RMHS
Item Description
Item Description
SEP Panel
Structural Steel
Battery Charger
Structural Steel
Structural Steel
MS Cable Tray
MS Cable Tray
MS Cable Tray
Structural Steel
Earthing Flat
Structural Steel
MS Cable Tray
Earthing Flat
Structural Steel
Light Fittings
Structural Steel
Light Fittings
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
Earth Electrode
MS Cable Tray
Structural Steel
MS Cable Tray
Structural Steel
MS Cable Tray
Structural Steel
MLDB Panel
Structural Steel
UPS Panel
Structural Steel
MS Cable Tray
Structural Steel
Structural Steel
MS Cable Tray
Earthing Flat
DETAILS OF KPO RMHS
605
Erection Cost
Varified
UOM Qunatity by Unit
MND / TSL erection
rate
Mtr 120 412.9
Mtr 50 231.2
MT 0.162 42,942.9
MT 4.61 42,942.9
Mtr 648 412.9
Mtr 40 231.2
MT 1.4 42,942.9
MT 2.176 42,942.9
Mtr 1020 412.9
Mtr 1020 231.2
Mtrs 0 -
MT 0 -
Mtrs 0 -
MT 0.2 42,942.9
MT 0 -
MT 0.15 42,942.9
MT 0.737 42,942.9
Mtr 150
We have carried out tray modification
at some of the locations because at
the time of exceution nither stair case MT 0.70
was erected nor it was indicated at
structural gallery.
Mtrs 135
MT 1.04
Mtrs 90
Due to Walk Way Cable Tray has
Dismelted & Re-erected.
MT 0.80
Mtrs 60
Due to PJB,CJB & LCS location changed.
MT 0.34
Nos 0.00
Location has changed after Erection.
MT 0.00
After Installation UPS rating has Nos 1
changed for both RM-8 & BH by MND.
So,dismalting the same & erect the
another one. MT 0.00
Mtrs 18
Due to Conveyor door.
MT 0.15
MT 0.42
Mtr 25
Annexure-2
Annexure-1
4955.0 9,910 -
12387.4 12,387 -
4955.0 19,820 -
0.0 - -
0.0 - 0 44,500 -
4955.0 4,955 -
0.0 - 0 44,500 -
### 869,970
Annexure-1
Total Value
(Supply+Erection)
Total Value
(Supply+Erection)
9,910
5,247
12,387
8,744
19,820
17,489
31,887
212,583
159,437
61,333
50,791
90,893
180,695
56,435
17,489
52,985
17,489
33,165
48,946
24,473
48,946
24,473
48,946
-
-
48,946
48,946
48,946
63,775
48,094
95,662
69,954
63,775
29,731
-
4,955
19,132
13,116
36,583
85,033
9,406
1,920,616