BULACAN
Introduction
In our daily lives we have our needs and wants. And one of the basic needs is food for
people to survive. Money is important to buy goods and foods. Money should be spent
wisely, thus, everyone chooses to buy goods in public markets than in supermarkets. One of
the basic services the local government should provide to its constituents is a public
market. In the municipality of San Rafael there is no public market. Some of the people
opted to buy needs and foods in other nearby public markets, however during Saturdays
and Tuesdays, there is a "tiangge" in barangay Poblacion.
CHAPTER I
THE PROBLEM AND ITS BACKGROUND
For the Local government of San Rafael. To be able to generate income and increase the revenue of the
municipality. To enhance the economic competitiveness of San Rafael to its nearby towns. To provide a
public market to the community that will ensure a safe and clean maintenance and operations.
The Public Market has a total floor area of 540
sq. m includes the wet section, dry section, grain
section, food stand and general merchandise
section. It has a total of 45 stalls with different
sizes per square meter for each section. The
estimated duration of the project is 3 months
exactly 91 days to finish the project.
Return of Investment
Investment : Php. 2,310,386.52
Income : Php. 1, 764, 000.00
Expenses : Php. 670, 000.00
Total Profit : Income-Expenses)
=Php. 1,094,000.00
Payback Period :
Net investment / Net Cash Inflow
Php. 2,310,386.52 / Php. 1,094,000.00
=2.11 years
Rate of Return :
(Net Income/ Initial Investment) x 100
(Php. 1,094,000.00/Php.2,310,386.52) x 100
=47.35%
Most of the consumers we interview go to market every two per week. A total of 70% or 28 respondents
say that they go to market twice a week followed by 15% or 6 respondents answer once a week then, 5%
or 2 from the respondents answer three times a week. Lastly, 10 % or 4 respondents answer every day
they go to the market place.
Chapter IV
PUBLIC MARKET
Convenience for the consumers and the stall holders
Popularity of the town that will attract investors.
Additional tax and revenue collection.
Additional employment for the management, operation and maintenance project giving priority to local
residents.
Increase in market production due to additional market outlets.
Healthy competition will be included
Relief of congestion in the marketplace.
Improvement of sanitary conditions.
Mitigation Measure
Proper site selection
Scheduled use of mechanical equipment
Regular transport and disposal of wastes
Proper storage of materials
Regular sprinkling of water on the dusty place
Proper orientation of workers on hygiene
Proper installation of temporary facilities
Potential Impact
Soil Erosion
Noise pollution
Trimming wastes
Air pollution
Wastes from workers
In our proposed San Rafael Public Market, several environmental impacts will be considered. The notes
show the potential impacts on the different phases of construction of the Public Market.
Dry Section
Groceries
RTW/Fabric
Shoe Section
School Supplies and Gift Shops
Glassware and Handicrafts
II.STRUCTURAL
Structural Steel
Material Property 7850 kg/cu.m.
Yield strength 276 Mpa
III. WELDING
Welding Electrodes E70xx
Theoretical Framework
the transportation terminal which is 1470 sq. m. will be distanced a few meters away from the market.
the estimated cost of the project is 25 million pesos.
they will reimbursed after two years.
Related Studies
Financial markets
Prediction markets
Mechanisms of markets
Commodity market
Free market
Financial market
Types of Market
Related Literature
This chapter presents the related literature and studies which guided the researchers in the conduit of the
study. The conceptual framework and definition of variables used in the study
4. How long it will take to complete the construction of the new public market using the PERT/CPM?
3. How much is the cost of the new public market in terms of materials, labor and overhead?
2. How may the plans and designs of the San Rafael new public market be described in terms of:
2.1 architectural
2.2 structural
2.3 mechanical
2.4 electrical
2.5 sanitary and
2.6 site development
The general problem of this study is "How may the New Public Market in San Rafael, Bulacan be
planned, designed and constructed?".
Specifically the study sought answers to the following questions:
1. What is the profile of San Rafael, Bulacan in terms of;
1.1 population
1.2 existing physical facilities and structure in the locality; and
1.3 budget
Proper handling and management of the project must be put into consideration.
Recommendation
Conclusion
For San Rafaeleños. The result of this study is for them to have easier and convenient market ambiance.
To provide the townspeople with an employment opportunity. To provide and satisfy the demand and
needs of the local market goers.
What are the benefits that can be derived from this project?
The estimated cost of the project is almost 2.31 million pesos and the estimated duration of the project is
3 months. A parking lot was also design for the site development of the public market to lessen the
possible traffic that could be made
How much is the cost of the new public market & how long it will take to complete the construction?
Summary
SUMMARY, CONCLUSION AND RECOMENDATION
CHAPTER V
The result of the survey and interview that the researchers conduct from the sellers on the existing”
tiangge” in Poblacion every Tuesday and Saturday. The interview and survey has a total of 30
respondents from sellers.
Socio-Political Analysis
The municipality of San Rafael has 34 barangays each headed by a duty elected barangay captain and the
Sangguniang Barangay. The Chief Executive of the Municipality is the elected municipal mayor. The
Sangguniang Bayan represents the legislative body, all of whom are duly elected by the people of the
municipality. Several positions in the municipality are then appointed by the incumbent mayor. The
municipal treasurer handles all financial matters concerning the locality.
Economic Analysis
Economic improvement plays a vital part in project feasibility side by side with the financial desirability.
Its impact will be greatly affecting the welfare of the whole community and of the upliftment of the
economic growth of the municipality.
Operational Analysis
Construction of the San Rafael Public Market will be awarded through bidding by qualified contractors.
Committees shall be assigned for the monitoring of project implementation.
Market Analysis
The market analysis generally answer the questions, “Is there an ample demand for the product or project
pursued?” and “What are the risks and what is the rate on return of investment?” However, since the
proposal is a government project, socio-economic desirability is given priority and profitability only
comes secondary.
Technical Analysis
BUILDING SPECIFICATIONS
Public Market
Each section is further subdivided as follows:
Wet Section
Fruit and Vegetable Section
Meat Section
Poultry Section
Fish Section
Design Parameters
Live Load 80 KN
Dead Load 60 KN
I.CONCRETE
Unit weight of concrete 24 kn/cu.m.
Flexural Strength Fc’ 28 Mpa
Utilities .24 Kpa
Concrete Topping .20 Kpa
CONSTRUCTION ASPECT
SCOPE OF WORK
EARTHWORK
Concrete
Structural Steel Works
Masonry, Mortar
Wood
Portland Cement Plaster
Tiles
Painting
PHYSICAL PROFILE
GEOGRAPHY
LAND RESOURCES
ECONOMIC PROFILE
MUNICIPAL GOVERNMENT
DEMOGRAPHIC PROFILE
SOCIAL SERVICES
Chapter III
The proposed market is a two-storey concrete framed structure with steel roof framing.
the total floor area of the market is 3215 square meters.
Proposed Reconstruction of Malolos City Public Market and commercial center (March 2003)
single storey public markets has a total lot area of 1470 sq. meters.
the slaughterhouse will have a total floor area of 432 sq. m. including the holding pen.
San Rafael Public Market with Slaughterhouse and Transport Terminal (March 2004).
two storey public markets has a total lot area of 9782 sq. meters and floor area of 4000 sq. meters.
the total estimated cost of the Proposed Marilao Public Market is 33, 860, 275.19 millions.
THEORETICAL FRAMEWORK
Chapter II
Due to the increasing population of San Rafael, Bulacan, the demand for a formal market structure was
dealt with. The main concern of this study was the construction of public market. To accomplish this, the
evaluation and investigation of existing market“tiangge” markets in Poblacion, San Rafael, Bulacan were
taken to consideration.
This Civil Engineering research, “The Proposed New Public Market in Poblacion San Rafael”, was
primarily concerned in providing San Rafael with an intermediate level of trade particularly a market
place that will enhance the community’s growth and development and that will meet the needs of the
local townspeople
Significance of the Study
5. What are the benefits that can be derived from this project?
This research is intended to determine the feasibility of constructing a public market in Poblacion, San
Rafael, Bulacan and to analyze aspects such as social, economical, political, administrative, financial and
environmental concerns that may be affected in the construction of this structure.
San Rafael is a first class municipality in the province of Bulacan, Philippines. San Rafael is politically
subdivided into the following 34 barangays 5 of them are in urban areas and 29 are rural. According to the
latest census, it has a population of 85,284 inhabitants in 14,639 households
In our daily lives we have our needs and wants. And one of the basic needs is food for people to survive.
Money is important to buy goods and foods. Money should be spent wisely, thus, everyone chooses to
buy goods in public markets than in supermarkets. One of the basic services the local government should
provide to its constituents is a public market. In the municipality of San Rafael there is no public market.
Some of the people opted to buy needs and foods in other nearby public markets, however during
Saturdays and Tuesdays, there is a "tiangge" in barangay Poblacion.
Introduction
CHAPTER I
Most of the sellers we interview in “tiangge” are come from Brgy. Caingin, San Rafael that also have the
greatest population in the municipality.
The graph represent that out of 30 respondents, 9 sellers didn’t agree to pay for new rent cost on the other
hand 21 sellers says they are agree to pay for rent.
The graph show that 92 percent or exactly 37 of the respondents agree in constructing of New Public
Market. However, 8 percent or exactly 3 of the respondents dis-agree.
FOR CONSUMERS:
PROCESS
OUTPUT
INPUT
-structural;
-mechanical;
-electrical;
-sanitary;
-site development?
Estimating of materials cost, labor cost, overhead cost and the duration.
PROCESS
OUTPUT
INPUT
DESIGN PROPOSAL
DESIGN SOLUTION
INTERPRETATION
ANALYSIS
DESIGN
SURVEY
INTERVIEW
INTERVIEW
PROBLEM
IDENTIFICATION
DATA
DATA PRESENTATION
SITE
For the Local government of San Rafael. To be able to generate income and increase the revenue of the
municipality. To enhance the economic competitiveness of San Rafael to its nearby towns. To provide a
public market to the community that will ensure a safe and clean maintenance and operations.
Return of Investment
Investment : Php. 2,310,386.52
Income : Php. 1, 764, 000.00
Expenses : Php. 670, 000.00
Total Profit : Income-Expenses)
=Php. 1,094,000.00
Payback Period :
Net investment / Net Cash Inflow
Php. 2,310,386.52 / Php. 1,094,000.00
=2.11 years
Rate of Return :
(Net Income/ Initial Investment) x 100
(Php. 1,094,000.00/Php.2,310,386.52) x 100
=47.35%
Most of the consumers we interview go to market every two per week. A total of 70% or 28 respondents
say that they go to market twice a week followed by 15% or 6 respondents answer once a week then, 5%
or 2 from the respondents answer three times a week. Lastly, 10 % or 4 respondents answer every day
they go to the market place.
Chapter IV
PUBLIC MARKET
Convenience for the consumers and the stall holders
Popularity of the town that will attract investors.
Additional tax and revenue collection.
Additional employment for the management, operation and maintenance project giving priority to local
residents.
Increase in market production due to additional market outlets.
Healthy competition will be included
Relief of congestion in the marketplace.
Improvement of sanitary conditions.
Mitigation Measure
Proper site selection
Scheduled use of mechanical equipment
Regular transport and disposal of wastes
Proper storage of materials
Regular sprinkling of water on the dusty place
Proper orientation of workers on hygiene
Proper installation of temporary facilities
Potential Impact
Soil Erosion
Noise pollution
Trimming wastes
Air pollution
Wastes from workers
In our proposed San Rafael Public Market, several environmental impacts will be considered. The notes
show the potential impacts on the different phases of construction of the Public Market.
Utility Section
Cooperative Office
Comfort Room
Food Section
Eateries
Frozen Food
Grain Section
Dry Section
Groceries
RTW/Fabric
Shoe Section
School Supplies and Gift Shops
Glassware and Handicrafts
II.STRUCTURAL
Structural Steel
Material Property 7850 kg/cu.m.
Yield strength 276 Mpa
III. WELDING
Welding Electrodes E70xx
Theoretical Framework
the transportation terminal which is 1470 sq. m. will be distanced a few meters away from the market.
the estimated cost of the project is 25 million pesos.
they will reimbursed after two years.
Related Studies
Financial markets
Prediction markets
Mechanisms of markets
Commodity market
Free market
Financial market
Types of Market
Maxwell Street Market
Great Market Hall
Wiltshire Farmers’ Markets Association
Floating Markets
Related Literature
This chapter presents the related literature and studies which guided the researchers in the conduit of the
study. The conceptual framework and definition of variables used in the study
4. How long it will take to complete the construction of the new public market using the PERT/CPM?
3. How much is the cost of the new public market in terms of materials, labor and overhead?
2. How may the plans and designs of the San Rafael new public market be described in terms of:
2.1 architectural
2.2 structural
2.3 mechanical
2.4 electrical
2.5 sanitary and
2.6 site development
The general problem of this study is "How may the New Public Market in San Rafael, Bulacan be
planned, designed and constructed?".
Specifically the study sought answers to the following questions:
1. What is the profile of San Rafael, Bulacan in terms of;
1.1 population
1.2 existing physical facilities and structure in the locality; and
1.3 budget
Proper handling and management of the project must be put into consideration.
Conclusion
For San Rafaeleños. The result of this study is for them to have easier and convenient market ambiance.
To provide the townspeople with an employment opportunity. To provide and satisfy the demand and
needs of the local market goers.
What are the benefits that can be derived from this project?
The estimated cost of the project is almost 2.31 million pesos and the estimated duration of the project is
3 months. A parking lot was also design for the site development of the public market to lessen the
possible traffic that could be made
How much is the cost of the new public market & how long it will take to complete the construction?
Summary
CHAPTER V
Total Php. 120,000.00
Total Expenses per Annum Php. 670, 000.00
The result of the survey and interview that the researchers conduct from the sellers on the existing”
tiangge” in Poblacion every Tuesday and Saturday. The interview and survey has a total of 30
respondents from sellers.
Socio-Political Analysis
The municipality of San Rafael has 34 barangays each headed by a duty elected barangay captain and the
Sangguniang Barangay. The Chief Executive of the Municipality is the elected municipal mayor. The
Sangguniang Bayan represents the legislative body, all of whom are duly elected by the people of the
municipality. Several positions in the municipality are then appointed by the incumbent mayor. The
municipal treasurer handles all financial matters concerning the locality.
Economic Analysis
Economic improvement plays a vital part in project feasibility side by side with the financial desirability.
Its impact will be greatly affecting the welfare of the whole community and of the upliftment of the
economic growth of the municipality.
Market Personnel
Market Master
Market Inspector
Revenue Collector
Utility Worker
Security Guard
Operational Analysis
Construction of the San Rafael Public Market will be awarded through bidding by qualified contractors.
Committees shall be assigned for the monitoring of project implementation.
Market Analysis
The market analysis generally answer the questions, “Is there an ample demand for the product or project
pursued?” and “What are the risks and what is the rate on return of investment?” However, since the
proposal is a government project, socio-economic desirability is given priority and profitability only
comes secondary.
Technical Analysis
BUILDING SPECIFICATIONS
Public Market
Each section is further subdivided as follows:
Wet Section
Fruit and Vegetable Section
Meat Section
Poultry Section
Fish Section
Design Parameters
Live Load 80 KN
Dead Load 60 KN
I.CONCRETE
Unit weight of concrete 24 kn/cu.m.
Flexural Strength Fc’ 28 Mpa
Utilities .24 Kpa
Concrete Topping .20 Kpa
CONSTRUCTION ASPECT
SCOPE OF WORK
EARTHWORK
Concrete
Structural Steel Works
Masonry, Mortar
Wood
Portland Cement Plaster
Tiles
Painting
PHYSICAL PROFILE
GEOGRAPHY
LAND RESOURCES
ECONOMIC PROFILE
MUNICIPAL GOVERNMENT
DEMOGRAPHIC PROFILE
SOCIAL SERVICES
Chapter III
The proposed market is a two-storey concrete framed structure with steel roof framing.
the total floor area of the market is 3215 square meters.
Proposed Reconstruction of Malolos City Public Market and commercial center (March 2003)
single storey public markets has a total lot area of 1470 sq. meters.
the slaughterhouse will have a total floor area of 432 sq. m. including the holding pen.
San Rafael Public Market with Slaughterhouse and Transport Terminal (March 2004).
two storey public markets has a total lot area of 9782 sq. meters and floor area of 4000 sq. meters.
the total estimated cost of the Proposed Marilao Public Market is 33, 860, 275.19 millions.
THEORETICAL FRAMEWORK
Chapter II
Due to the increasing population of San Rafael, Bulacan, the demand for a formal market structure was
dealt with. The main concern of this study was the construction of public market. To accomplish this, the
evaluation and investigation of existing market“tiangge” markets in Poblacion, San Rafael, Bulacan were
taken to consideration.
This Civil Engineering research, “The Proposed New Public Market in Poblacion San Rafael”, was
primarily concerned in providing San Rafael with an intermediate level of trade particularly a market
place that will enhance the community’s growth and development and that will meet the needs of the
local townspeople
5. What are the benefits that can be derived from this project?
`
This research is intended to determine the feasibility of constructing a public market in Poblacion, San
Rafael, Bulacan and to analyze aspects such as social, economical, political, administrative, financial and
environmental concerns that may be affected in the construction of this structure.
San Rafael is a first class municipality in the province of Bulacan, Philippines. San Rafael is politically
subdivided into the following 34 barangays 5 of them are in urban areas and 29 are rural. According to the
latest census, it has a population of 85,284 inhabitants in 14,639 households
In our daily lives we have our needs and wants. And one of the basic needs is food for people to survive.
Money is important to buy goods and foods. Money should be spent wisely, thus, everyone chooses to
buy goods in public markets than in supermarkets. One of the basic services the local government should
provide to its constituents is a public market. In the municipality of San Rafael there is no public market.
Some of the people opted to buy needs and foods in other nearby public markets, however during
Saturdays and Tuesdays, there is a "tiangge" in barangay Poblacion.
Introduction
CHAPTER I
Most of the sellers we interview in “tiangge” are come from Brgy. Caingin, San Rafael that also have the
greatest population in the municipality.
Where they come from?
The graph represent that out of 30 respondents, 9 sellers didn’t agree to pay for new rent cost on the other
hand 21 sellers says they are agree to pay for rent.
The graph show that 92 percent or exactly 37 of the respondents agree in constructing of New Public
Market. However, 8 percent or exactly 3 of the respondents dis-agree.
FOR CONSUMERS:
PROCESS
OUTPUT
INPUT
-structural;
-mechanical;
-electrical;
-sanitary;
-site development?
Estimating of materials cost, labor cost, overhead cost and the duration.
PROCESS
OUTPUT
INPUT
DESIGN PROPOSAL
DESIGN SOLUTION
INTERPRETATION
ANALYSIS
DESIGN
SURVEY
INTERVIEW
INTERVIEW
PROBLEM
IDENTIFICATION
DATA
DATA PRESENTATION
SITE