Technological flow LIST U.

M SECTORS
Reusable panel formwork for slab and column at 0.00 level m2 1,00
Reinforcement for slab at 0.00 level kg 1,00
RC fir beam and slab at 0.00 level m3 1,00
Reusable panel formwork for columns m2 5,00
Reinforcement for columns kg 5,00
Reinforced concrete for columns m3 5,00
Reusable panel forwork for diaphragms m2 6,00
Reinforcement for diphragms kg 6,00
RC for diaphgrams m3 6,00
Reusable panel formwork for beams m2 6,00
Reinforcement for beams kg 5,00
Reinforced conrtete for beams m3 5,00
Metalic,extensible beams for support of beams and slabs piece 5,00
Metalic, extensible pops for support of beams and slabs piece 5,00
Reusable panel forwork for slabs m2 5,00
Reinforcement for slabs kg 5,00
Reinforced concree for slabs m3 5,00
Reusable panel formwork for stairs m2 5,00
Reinforcement for stairs kg 5,00
Reinforced concrete for stairs m3 5,00
Formwork for last level staircase slab m2 1,00
pouring concrete in last level staircase slab m3 1,00
AAC wall masonry on last level m3 1,00
Vapor barrier m2 1,00
Thermal isolation and equalization layer m2 1,00
Hydro isolation m2 1,00
partition wall m3 1,00
ACC wall mansory m3 1,00
Windows m2 1,00
Doors m2 1,00
Thermal isolation m2 1,00
Quantity/SECTOR TOTAL QUANTITY
144,35 145,35
1317,10 1317,10
28,41 28,41
72,28 361,40
1062,18 5310,90
6,95 34,75
96,63 579,78
752,72 4516,32
6,93 41,58
72,37 434,22
1469,23 7346,15
13,47 67,35
44,00 220,00
88,00 440,00
144,64 6585,50
1317,10 87,95
17,59 49,40
9,88 353,80
70,76 10,30
2,06 16,37
16,37 1,64
1,64 3,15
3,15 168,24
168,24 168,24
168,24 168,24
168,24 78,39
78,39 219,23
219,23 80,64
80,64 45,88
45,88 883,73
883,73