0 5 10 15 20 25 30 35 40
15,00
10,00
5,00
D P [Pi - Pwf]
TEMA
DESARROLLADO POR
5,00
FIDEL V. CHUCHUCA AGUILAR
10,00
DIRIGIDO POR
SOLUCION
Pasamos el tiempo a horas
550
Pwf [psi] h
500
m = -108,5047
450
400
350
300
0,1 1 10
t [hrs]
Gráfico 2.1
Fidel Vladimir Chuchuca Aguilar
PRUEBAS DE POZOS (FICT – 01966)
Hallamos la permeabilidad (k)
K = 162.6*(q**)/(m*h) = 162.6*(90*1.091*2.44)/(108.5047*5)
K = 71.8057 md
S = 12.418
SOLUCIÓN
K = 162.6*(q**)/(m*h) = 162.6*(17*1.046*13.7)/(33.1687*37)
K = 32.2769 md
S = 1.151*{[(788.5–291)/33.1687] –log[32.2769/(0.165*13.7*6.7x10-6*0.242)]
+ 3.23}
S = 12.271
m = - 33,1687
260
250
240
230
220
210
200
0,1 1 10 100
t [hrs]
Gráfico 4.1
Fidel Vladimir Chuchuca Aguilar
PRUEBAS DE POZOS (FICT – 01966)
6. ESTIMATE FORMATION PERMEABILITY AND SKIN FACTOR FROM THE
DRAW-DOWN TEST DATA GIVEN THE FOLLOWING FORMATION AND
FLUIDS PROPERTIES: q = 1200 STB/D; pi = 4474.4 psia; h = 26 ft;
= 21.6%; rw = 0.22 ft; = 1.52 RB/STB; ct = 16.6 x 10-6 psi-1; and = 0.29
cp. WHERE DO YOU DRAW THE STRAIGHT LINE
SOLUCIÓN
K = 162.6*(q**)/(m*h) = 162.6*(1200*1.52*0.29)/(225*26)
K = 14.7024 md
S = 1.151*{[(4474.4–2550)/225] –log[14.7024/(0.216*0.29*16.6x10-6*0.222)]
+ 3.23}
S = 3.8182
K = 162.6*(q**)/(m*h) = 162.6*(1200*1.52*0.29)/(1575*26)
K = 2.1003 md
S = 1.151*{[(4474.4–3075)/1575] –log[2.1003/(0.216*0.29*16.6x10-6*0.222)]
+ 3.23}
S = - 4.0308
4500
4300
4100
3900
3700
m = - 1575
Pwf [psi]
3500
3300
3100
2900 m = - 225
2700
2500
2300
2100
SOLUCIÓN
K = 162.6*(*)/(m*h) = 162.6*(1.166*2.999)/(6.8267*19)
S = - 2.8019
23
22
21
20
19 m = 6,8267
18
17
16
15
14
13
12
11
10
9
1 10 t [hrs] 100 1000
Gráfico 8.1
Fidel Vladimir Chuchuca Aguilar
PRUEBAS DE POZOS (FICT – 01966)
10. A WELL IS PRODUCED AT 50 STB/D FOR 72 hrs. THE RATE IS THEN
DECREASED TO 25 STB/D FOR 24 hrs. ESTIMATE FORMATION
PERMEABILITY, SKIN FACTOR AND INITIAL PRESSURE FROM THE
TWO-RATE TEST DATA GIVEN THE FOLLOWING FORMATION AND
FLUIDS PROPERTIES: q1 = 50 STB/D; tp1 = 72 hrs; q2 = 25 STB/D;
pwf1 =1142.24 psi; h = 43 ft; = 8.2%; rw = 0.45 ft; = 1.143 RB/STB;
ct = 10.5 x 10-6 psi-1; and = 2.44 cp.
SOLUCIÓN
K = 162.6*(q1**)/(m*h) = 162.6*(50*1.143*1.278)/(31.6667*43)
Fidel Vladimir Chuchuca Aguilar
PRUEBAS DE POZOS (FICT – 01966)
K = 8.7216 md
1425
1415
1405
1395
BHP
1385
1375
1365
1355
1345
1 1,2 1,4 1,6 1,8 2 2,2 2,4 2,6
Time Plotting Function
Gráfico 10.1
Fidel Vladimir Chuchuca Aguilar
PRUEBAS DE POZOS (FICT – 01966)
12. A DRAWDOWN TEST IS RUN ON AN OIL WELL AT A SERIES OF
THREE DIFFERENT RATES, WITH EACH FLOW PERIOD LASTING 4
HOURS. GIVEN THE FOLLOWING FORMATION AND FLUIDS
PROPERTIES, ESTIMATE FORMATION PERMEABILITY AND SKIN
FACTOR FROM THE TEST DATA USING THE MULTIRATE ANAYSIS
METHOD: q1 = 250 STB/D; q2 = 225 STB/D; q3 = 200 STB/D; pi = 2003.80
psi; h = 33 ft; = 29.5%; rw = 0.2 ft; = 1.181 RB/STB; ct = 12.0 x 10-6 psi-1;
AND = 1.661 cp
SOLUCIÓN
q – q
n
K = 162.6*(*)/(m*h) = 162.6*(1.181*3.371)/(0.2106*33)
K = 93.1444 md
S = 1.151*{[0.83756]/0.2106 – log[93.1444/(0.295*1.661*12.0x10-6*0.22)] +
3.23}
S = - 1.6007
1,1
1
m = 0,2106
0,9
0,8
0,7
0,6
-0,4 -0,2 0 0,2 0,4 0,6 0,8 1 1,2 1,4
Gráfico 12.1