Вы находитесь на странице: 1из 9

Checklist Arsenal V3.1.

3 Test
Date: 9/20/2017
Test Engineer: Daniel S.
NS: AR3.1.3-02
Use: üfor PASS test or û for FAIL test
Test Description 1st Insp 2nd Insp
1 Visual Inspection
1.1 Verify all the connector are Ok PASS
1.2 Verify all the IC's be well oriented PASS
1.3 Verify PCB free of scrach and mechanical damage PASS
1.4 Verify PCB, not solder bridges PASS
1.5 Verify all the Test Poits are correctly assy PASS
2 Continuity
2.1 Verify pin1 of J1 is not grounded PASS
2.2 Verify pin 1 of J3 is not grounded PASS
2.3 Verify pin 1 of X2 connector is not grounded PASS
2.4 Verify pin 1 of J4 is not grounded PASS
3 Voltage
Voltage Value (V)
3.1 JP2 3.3 PASS
3.2 J1 5.1 PASS
3.3 J3 4.95 PASS
4 Current
Voltage Value (A)
4.1 J1 2.4 PASS
4.2 J3 2.1 PASS

Checklist Arsenal V3.1.3-02 1 of 9


Only for Failure test
Ref Comments / Repaired by: Date

Functional Test Result PASS

Test Engineer sign:

Checklist Arsenal V3.1.3-02 2 of 9


Checklist Arsenal V3.1.3-02 3 of 9
Checklist Arsenal V3.1.3 Test
Date: 9/19/2017
Test Engineer: Daniel S.
NS: AR3.1.3-03
Use: üfor PASS test or û for FAIL test
Test Description 1st Insp 2nd Insp
1 Visual Inspection
1.1 Verify all the connector are Ok PASS
1.2 Verify all the IC's be well oriented PASS
1.3 Verify PCB free of scrach and mechanical damage PASS
1.4 Verify PCB, not solder bridges PASS
1.5 Verify all the Test Poits are correctly assy PASS
2 Continuity
2.1 Verify pin1 of J1 is not grounded PASS
2.2 Verify pin 1 of J3 is not grounded PASS
2.3 Verify pin 1 of X2 connector is not grounded PASS
2.4 Verify pin 1 of J4 is not grounded PASS
3 Voltage
Voltage Value (V)
3.1 JP2 3.29 PASS
3.2 J1 5.03 PASS
3.3 J3 5.19 PASS
4 Current
Voltage Value (A)
4.1 J1 2.43 PASS
4.2 J3 2.51 PASS

Checklist Arsenal V3.1.3-03 4 of 9


Only for Failure test
Ref Comments / Repaired by: Date

Functional Test Result PASS

Test Engineer sign:

Checklist Arsenal V3.1.3-03 5 of 9


Checklist Arsenal V3.1.3-03 6 of 9
Checklist Arsenal V3.1.3 Test
Date: 9/19/2017
Test Engineer: Daniel S.
NS: AR3.1.3-04
Use: üfor PASS test or û for FAIL test
Test Description 1st Insp 2nd Insp
1 Visual Inspection
1.1 Verify all the connector are Ok PASS
1.2 Verify all the IC's be well oriented PASS
1.3 Verify PCB free of scrach and mechanical damage PASS
1.4 Verify PCB, not solder bridges PASS
1.5 Verify all the Test Poits are correctly assy PASS
2 Continuity
2.1 Verify pin1 of J1 is not grounded PASS
2.2 Verify pin 1 of J3 is not grounded PASS
2.3 Verify pin 1 of X2 connector is not grounded PASS
2.4 Verify pin 1 of J4 is not grounded PASS
3 Voltage
Voltage Value (V)
3.1 JP2 3.3 PASS
3.2 J1 4.95 PASS
3.3 J3 5.19 PASS
4 Current
Voltage Value (A)
4.1 J1 2.49 PASS
4.2 J3 2.51 PASS

Checklist Arsenal V3.1.3-04 7 of 9


Only for Failure test
Ref Comments / Repaired by: Date

Functional Test Result PASS

Test Engineer sign:

Checklist Arsenal V3.1.3-04 8 of 9


Checklist Arsenal V3.1.3-04 9 of 9

Вам также может понравиться