Вы находитесь на странице: 1из 2

TELANAGANA STATE ELECTRICITY REGULATORY COMMISSION

5th Floor, Singareni Bhavan, Red Hills, Hyderabad-500 004

Dated: 31 - 08 - 2017

Present
Sri Ismail Ali Khan, Chairman
Sri H.Srinivasulu, Member

O.P. No. 22 of 2016


Southern Power Distribution Company of Telangana Limited (TSSPDCL)

O.P.No.23 of 2016
Northern Power Distribution Company of Telangana Limited (TSNPDCL)

In the matter of determination of retail supply tariff under Section 62 of the


Electricity Act, 2003 for FY 2017-18.

Amendment Order.

The Commission has determined the retail supply tariff for the year 2017-18 by
order dated 26.08.2017 in the above said O. Ps. While determining the retail supply
tariff, the order reflected certain errors both typographical and phrases, which need to
be corrected.

2. In respect of LT – V Agricultural, the following is added to the order.

Paras 6.3.6 and 8.25


 Category is applicable only for those consumers who undertake
agricultural activity including floriculture.
 The agricultural activities undertaken in green houses / poly-houses
shall also be included in this category.
Paras 6.4.9, 6.9.9, 8.37 and 8.111
In respect of applicability of tariff, construction activities for structures of height
less than 10 meters will fall under LT – II and HT – II, as are relevant.

3. Certain words and phrases occurring in various parts of the order need
corrections and they are shown below.
Paragraph / Line For the words and phrases Read the words and
occurring in the order phrases thereof
Para 6.5.6 at page 81 and Captive power consumers Captive power plants
para 6.6.5 at page 82
Para 8.11, 8.13, 8.15 and INR / KWH INR / KWH or INR /
8.18 KVAH
Para 8.74 (b) Para 74 (a) Para 8.73 (b)
Para 8.154 (a) Para 151 (a) Para 8.153 (b)
Para 8.43 (ii) at page 114 LT – V (C) LT – V (B)
Para 8.113 at page 132 The tariff for HT Rural Electric The tariff for HT Rural
Co-operative Societies Electric Co-operative
(RESCO) - Energy Charges Societies (RESCO) -
(INR / KVAH) Energy Charge (INR /
KWH)
Para 8.128 at page 134 The captive power plants
and para 8.141 at page availing power for start-
136 up power shall pay
demand charges at the
rate of 50% of the rate
approved for this
category

4. The following words and phrases are occurring in the order at wrong places or
erroneously added are omitted completely.
a) “Floriculture in green house” in Tables 32, 35, 37 and Annexure I (Pg. 144 &
145).
b) “HT – VI: Townships and Residential Colonies” at page 126.
c) “bus stands and attached offices, railway stations” in para 8.98 (d) at page
127.
5. The paragraphs 9.14, 9.15 and 9.16, which were part of the order but did not
find place inadvertently are now shown.

6. The complete text of the order after incorporating the above errors and
omissions is placed on the website of the Commission.

7. Except to the above amendment / changes, the rest of the order dated
26.08.2017 remains unaltered. The DISCOMs of Telangana area are directed
to give effect to the above order along with this amendment / changes.

This order is corrected and signed on this 31st day of August, 2017.

Sd/- Sd/-
(H SRINIVASULU) (ISMAIL ALI KHAN)
MEMBER CHAIRMAN