DATE No. of bags No. of CHB per bag No.

of Workers
June 12-16 40 3854 96.35 3
June 17-23 60 5729 95.48 3
June 24-30 36.5 3491 95.64 2
July 1-7 68.5 6647 97.04 3
July 8-14 62 6522 105.19 3
July 15-21 64 6540 102.19 2
July 22-28 76 7551 99.36 4
July 29-Aug 4 40 5200 130.00 4
Aug 5-11 65 10047 154.57
Aug 14-18 58 5880 101.38 4
Aug-19 7 720 102.86 5
Aug 21-25 78 8428 108.05 5
Aug 28-31 48.5 4950 102.06 6
Sept 1-8 83 8422 101.47 4
Sept 14-15 15 2156 143.73 3
Sept 16-22 73 9026 123.64 5
RECEIVING REPORT
Date No. ACTIVITY Amount
June 6 2017 9906 palanas 7500
9907 palanas 7500
June 8 2017 9909 palanas 7500

June 13 2017 57476 palanas 7500

June 14 2017 57473 adaptor 4090


p.e. 2850
g.i. tee 125

June 16 2017 57474 thhn #10 4090


wheel barrow 3000
shovel 2080
fuse box 750

June 27 2017 57478 fuse box 8191.8


fuse 420
e.tape 100
hinges 715
toilet bowl 1000
led bulb 2100
locaset 1750

June 30 2017 57480 sub base 25500

July 4 2017 57479 thhn #12 & #14 8191.8

July 10 2017 57482 cement 124800

July 20 2017 57488 for chb making 45000

July 21 2017 57489 for chb making 22500

Aug 11 2017 57495 cement 184800

Aug 14 2017 57496 Submeter 3900


Fusebox 1500
Aug 24 2017 57497 Block 1400

Aug 29 2017 57498 Block 440


Pulley 2000

Sept 18 2017 57499 fan belt 960


TOTAL 482253.6
DATE CONTRACTOR ACTIVITY AMOUNT
June 18-24 Danilo Alegre addtl works @ barracks of CHB Fabrication 7500
Aug 6-12 Danilo Alegre INSTALLATION OF TOLDA 2250
Aug 26-25 Danilo Alegre CHB fabrication flooring 5760

Aug 26-Sept Danilo Alegre repositioning of mixer (2mason/6days) 5400


making ramps (1labor/6 days) 2100

SEPT 3-9 JONATHAN BACAL pump house (welding of fence, trusses & roof inst.) 8000
pump house flooring 1562.5
CHB FABRICATION 500
SEPT 10-16 JONATHAN BACAL CHB FABRICATION (ADD'L 2 SETS) 1000

TOTAL 34072.5