After performing the experiment we learned how to measure and
interpretation of current and voltage relationship of transmission line in matched-load operation. We also learned about the three phase transmission lines by connecting three phase transmission lines with length 150 to 300 kilometers and to study the behavior of three phase transmission lines during matching. We also gather reactive power, active power, current line1 (start), and current line1 (load) As we see in our date the transmission line leght 150 is freater than 300 kilometer in all aspects.