How has Top Management ensured that quality objectives are established at
relevant functions and levels within the organization?
0 0%
4.1.3 Objectives
a. How are quality objectives measurable and consistent with the quality policy?
0
Has Management ensured that the planning of the quality management system is
maintained when changes to the quality management system are planned and 0 0%
implemented?
4.1.4 Planning
Has Management ensured that the integrity of the quality management system is
0
carried out to meet the quality objectives?
4.1.5 Communications 0%
Has Management ensured that appropriate communication processes are
established within the organization and the effectiveness of the quality 0 0%
management system is communicated?
Has the organization established processes to ensure that customer and legal
4.1.5.1 Internal and other applicable requirements are communicated at relevant levels within the 0
organization?
Has the organisation established processes to ensure that the results of data
0
analysis (see 6.3) are communicated at relevant levels within the organization?
Has the organization established processes for communicating with external
organizations to ensure requirements are fully understood and risk is managed
(see 5.3) throughout execution of contract and execution of services including
0 0%
activities such as:
Responsibility and a) ensuring that the quality management system is established, implemented and
4.2.2 Authority maintained in accordance with the requirements of this document;
0
Are the Personnel competent based on the appropriate education, training, skills
and experience needed to meet service and service-related product 0 0%
requirements?
Personnel
4.3.2.2 Competence
Personnel
4.3.2.2 Competence
Does it have recorded and maintained evidence of the determination of
0
competence of personnel?, (see 4.5).
a) provide for quality management system training and for job training of the
organization’s personnel and contractors who affect execution of service or 0
provision of service-related product?
Training and c) ensure that the frequency and content of training complies with legal and other
4.3.2.3 Awareness applicable requirements?;
0
d) ensure that its personnel are aware of the relevance and importance of their
0
activities and how they contribute to the achievement of the quality objectives?
e) identify and provide training on legal and other applicable requirements?; and 0
does the organization determine, provide, manage, and maintain the work
environment needed to achieve conformity to applicable service or service- 0 0%
related product requirements? Work environment includes, as applicable:
Work
4.3.3 Environment
Work
4.3.3 Environment b) process equipment (both hardware and software); 0
4.4.1 General
3) allowable exclusions and the basis for claiming those exclusions (See 1.2),
0
and
Does the Procedures required by this document and the quality management
0
system established, documented, implemented and maintained?
Control of
4.4.2 Documents
Have been an obsolete documents removed from all points of issue or use, or
otherwise identified to prevent unintended use if they are retained for any 0
purpose?
Has been a master list or equivalent been established to identify the current
0
revision status of documents?
Determination of
5.1.2 Requirements b) Did it have legal and other applicable requirements?; and 0
Determination of
5.1.2 Requirements
c) Did it have requirements not stated by the customer but considered necessary
by the organization for the execution of service and provision of service-related 0
product?
Review of
5.1.3 Requirements
c)Is the organization has the capability to meet the defined requirements? 0
If contract requirements are changed, did the organization ensured that relevant
documents are amended and that relevant personnel are made aware of the 0
changed requirements?
Does it maintain records of the results of the review, including resulting actions?
0
(see 4.5).
5.2 Planning 0%
Does the organization identify and plan the processes and documents needed
0
for service and service-related product realization?
Risk Assessment
5.3 and Management
c) Does it select, communicate and implement the mitigation or preventive control
0
measures to reduce or avoid exposure to loss?
d)Does it notify the customer of remaining risks that may impact the service? 0
Have been records of risk assessment and actions taken maintained? (see 4.5). 0
Design and
5.4.1 Development b) the activities required for completion, review and verification of each stage? 0
Planning
When design and development are outsourced, does the organization ennsure
that the supplier meets the
0
requirements of 5.4 and provide objective evidence that the supplier has met
these requirements?
Have inputs relating to service been determined and records maintained? (see
4.5). Have these inputs include?
0 0%
Design and
5.4.2 Development 1) Does it have requirements provided from an external source? 0
Inputs
Design and
b) Does it provide information for purchasing of any required service-related
5.4.3 Development 0
product?
Outputs
c) Does it provide controls for the execution of the service, including allowable
0
variations in the service execution parameters?
Have the verification of the design of the service been performed in accordance
with planned arrangements, (see 5.4.1) to ensure that the design and 0 0%
development outputs have met the design and development input requirements?
Design and
5.4.4 Development
Verification
Have the records of the results of the verification been maintained?(see 4.5). 0
Have a final design and development review and approval been conducted and
documented?
0 0%
Design and
Development Did an Individual(s) other than the person or persons who developed the design
5.4.5 Final Review and reviewed and approved the final design and development outputs? 0
Approval
Have the records of the results of the verification been maintained?(see 4.5). 0
Control of Design
5.4.6 and Development Have changes in the approved design bene reviewed and verified by the 0
management of change process?(see 5.11).
Changes
General Does the procedure include incident and disruption prevention and mitigation
5.5.1 measures?
0
Has the contingency plan been based on assessed risks (see 5.3) and does it
0
include, at a minimum?:
5.6 Purchasing 0 0%
Does the organization maintain a documented procedure to ensure that
purchased or outsourced services and service-related products conform to 0 0%
specified requirements?
b) Does it address the evaluation and selection of suppliers based on their ability
to supply services and service-related product in accordance with the 0
organization‘s requirements?
c) Does it address the type and extent of control applied to the supplier and
service and/or service-related product based on the criticality of the service and 0
service-related product?
d) Does it address the criteria, scope, frequency and methods used when
0
performing an assessment on a supplier?
Purchasing
5.6.1 Control
For critical services or service-related product, the criteria for the initial evaluation
Purchasing
5.6.1 Control and selection of suppliers by the organization does it include the following prior to 0
initiation of the purchase agreement?:
2) Does it include the verification that the supplier’s quality management system
conforms to the quality system requirements specified for suppliers by the 0
organization?
For re-evaluation of suppliers and the initial evaluation of suppliers for non-critical
services or service-related product by the organization, does one or more of the 0
following apply?:
ii) Did it have a verification that the supplier’s quality management system
conforms to the quality system requirements specified for suppliers by the 0
organization?
iii) Did it have an assessment of the supplier upon delivery of the product or
0
service?
Have been records of the results of assessments and any necessary actions
arising from the evaluation maintained? (see 4.5). Where supplier assessment
0
results in the need for actions, evidence of effective implementation of such
actions has it been maintained in accordance with 6.4.2.?
Have the purchasing information provided to the supplier been documented and
describe the services or service-related product to be purchased, including where 0 0%
appropriate?:
a) Does it have the requirements for acceptance criteria of service and service-
0
related product?
Purchasing
5.6.2 Information
b) Does it have the requirements for approval of supplier's procedures, processes
0
and equipment?
Purchasing
5.6.2 Information
c) Does it have an applicable version of specifications, drawings, process
0
requirements, inspection instructions, and other relevant technical data?
Verification of
Purchased
5.6.3 Services and Does the organization maintain records of verification activities? (see 4.5). 0
Service-related
Product
Does the organization ensure and provide evidence that outsourced services and
0
service-related products conform to specified requirements?
5.7.1.1 General
b) Does it maintain defined contract requirements? (see 5.1); 0
5.7.1.1 General
Have been controls for execution of the service documented in routings, travelers,
checklists, process sheets, or other types of documents and do they include
requirements for verifying conformity to quality plans, procedures, and applicable
0 0%
standards/codes?
5.7.1.2 Documentation
Have the control documents include or reference instructions, workmanship, and
acceptance criteria for processes, tests, inspections, and customer’s inspection 0
hold or witness points?
Have the service quality plan been updated when any of the plan content
0
changes?
Have a service quality plans and any revisions to them been documented and
approved by the organization?
0 0%
When required by contract, have the the service quality plan and any revisions
0
been communicated to the customer?
Identification and Does the procedure include requirements for maintenance or replacement of
5.7.3 Traceability identification and traceability marks, and records? (see 4.5).
0
Customer
5.7.5 Property
Customer Does control of customer property include reporting to the customer any loss,
5.7.5 Property damage or unsuitable use of customer-supplied property?
0
Does the organization identify, verify, protect and safeguard customer property
0
provided for use in the service and/or with the service-related product?
Have been records for the control and disposition of customer supplied property
0
maintained? (see 4.5).
Preservation of
5.7.6 Service-related As applicable, Does the preservation include identification and traceability, 0
transportation, handling, packaging, storage and protection.
Product
Was the validation of service-related product have been completed prior to the
0
execution of the service?
Validation of
5.7.7 Service-related
Product
Were the records of the result of validation, when performed, have been
0
maintained?(see 4.5).
c) Does it include list of critical spare parts requirements by the customer and/or
technical requirements including those recommended by the original equipment 0
manufacturer?
Did the original performance requirements that cannot be met, undergo the MOC
0
process (see 5.11) for continued use?
Does the organization take an appropriate action on the equipment and any
0
service affected?
Has this been undertaken prior to initial use and reconfirmed as necessary? 0
When the equipment is externally provided, had the organization verified that the
equipment is suitable to provide evidence of conformity of service or service- 0
related product to specified requirements?
Does the organization maintain a registry of the required testing, measurement,
monitoring, and detection equipment that includes an unambiguous form of 0
identification, specific to each piece of equipment?
Have been the records of the results of calibration and verification maintained?
0
(see 4.5).
Was this carried out at appropriate stages during the execution of the service in
accordance with design requirements (see 5.4) and the service quality plan? (see 0
5.7.2).
Service
5.9 Performance
Validation
Was an evidence of conformity with established acceptance criteria, including
0
KPIs and critical success factors, maintained?
Nonconforming
Service Execution
5.10.2 and Service-
related Product
a)Did it address by taking action to correct the nonconformity?; or 0
Nonconforming
Service Execution b) when 5.10.2.a) is not possible or appropriate, by taking action to preclude the
5.10.2 and Service- use of service-related product from its intended use or application; or 0
related Product
Did the organization notified customers in the event that the service execution
does not conform to service design requirements or when nonconforming service- 0 0%
related product has been delivered or used in the execution of the service?
Customer
5.10.4 Notification
5.11.1 General
For the management of change, did the organization identify the potential risks
(see 5.3) associated with the change and any required approvals prior to the 0
introduction of such changes?
Does the organization use the MOC process for any of the following that may
impact the execution of a service?:
0 0%
f) changes in approved design (see 5.4) including those that were originally
agreed upon by the customer and those required by changes in legal and other 0
applicable requirements.
Does the organization conduct a risk assessment (see 5.3) when evaluating a
potential change?
0 0%
Does the organization notify relevant personnel, including the customer, of the
change and residual or new risk due to changes that have either been initiated by 0
the organization or requested by the customer?
MOC Evaluation,
5.11.3 Notification and
Controls
Does the organization ensure that relevant documents are amended? 0
MOC Evaluation,
5.11.3 Notification and
Controls
Customer Does the procedure address customer feedback, key performance indicators
6.2.1 Satisfaction (KPIs), and other information that the organization monitors to determine whether 0
the organization has met customer requirements?
Do the planning of internal audits taken into consideration the results of previous
0
audits and criticality of the process?
6.2.2.1 General
6.2.2.1 General
Does the organization define the audit criteria, scope, frequency and methods to
ensure that all elements of the management system claiming conformity to the 0
requirements of this document are audited at least annually?
Have been an outsourced suppliers that impact the quality of services or service-
related product, located at the organization’s facility, be enincluded as part of the 0
internal audit of the organization?
Does the organization conduct internal audits to determine whether the quality
management system conforms to the requirements of this document and is 0 0%
effectively implemented and maintained?
Performance of Have audits been performed by competent (see 4.3.2.2) personnel independent
6.2.2.2 Internal Audit of those who performed or directly supervised the activity being audited? 0
Have an audit of all elements of the management system been conducted prior to
0
claiming conformance to the requirements of this document?
Have the management responsible for the area being audited were ensured that
any necessary corrections and corrective actions are taken to eliminate detected 0
nonconformities and their causes?
Audit Review and
6.2.2.3 Closure
Did follow-up activities include the verification of the actions taken (see 6.4.2)? 0
Were the records of the audits and their results been maintained (see 4.5)? 0
Does this include data generated as a result of monitoring and measurement and
0
from other relevant sources?
6.4 Improvement 0 0%
Does the organization maintain a documented procedure that identifies the
methods used to monitor, evaluate and improve the effectiveness and
implementation of the quality management system processes for the execution of
0 0%
the service and use of the service-related product?
6.4.1 General
Does the procedure identify how the organization uses the quality policy, quality
objectives, customer feedback, audit results, analysis of data, corrective and
0
preventive actions, and management review for the continual improvement of the
effectiveness of the quality management system?
6.4.2 Corrective Action c) evaluating the need for corrective action to reduce the likelihood that 0
nonconformities recur,
d) identifying the timeframe and responsible person(s) for making corrections and
0
taking corrective action,
f) maintaining records of the corrections and corrective action taken (see 4.5). 0
When the corrective action identifies the need for new or changed controls, does
the procedure reflect the requirement that the MOC process (see 5.11) be 0
applied to the proposed action?
b) evaluating the need for preventive action, including any immediate or short
0
term action required, to prevent occurrence of nonconformities;
When the preventive action identifies the need for new or changed controls, does
the procedure reflect the requirement that the MOC process (see 5.11) be applied 0
to the proposed action?
Does the input to management review include, but not be limited to?: 0 0%
c) changes, including legal and other applicable requirements, that could affect
0
the quality management system;
Input
6.5.2 Requirements
f) status of corrective and preventive actions (see 6.4.2 and 6.4.3); and 0
Does the output from the management review include a summary assessment of
the status of the quality management system?
0 0%
Does the assessment include any required changes to the processes and any
decisions and actions, required resources, and improvement of service and 0
service-related products in meeting customer requirements?
Output
6.5.3 Requirements
Does the top management review and approve the output of management
0
reviews?
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0
PI Q2 Supplier Score
API Q2 Supplier Score
4.3.2.1 General 0% 6
4.3.2.2 Personnel Competence 0% 6.3
4.3.2.3 Training and Awareness 0% 6.4
4.3.3 Work Environment 0% 6.5
4.4 Document Requirements 0%
4.4.1 General 0%
4.4.2 Control of Documents 0%
4.5 Control of Records 0%
5.1 Contract Review 0%
5.1.1 General 0%
5.1.2 Determination of Requirements 0%
5.1.3 Review of Requirements 0%
5.2 Planning 0%
5.3 Risk Assessment and Management 0%
5.4 Design and Development 0%
5.4.1 Design and Development Planning 0%
5.4.2 Design and Development Inputs 0%
5.4.3 Design and Development Outputs 0%
5.4.4 Design and Development Verification 0%
Design and Development Final Review and
5.4.5 Approval 0%
Control of Design and Development
5.4.6 Changes 0%
5.5 Contingency planning 0%
5.5.1 General 0%
5.5.2 Planning Output 0%
5.6 Purchasing 0%
5.6.1 Purchasing Control 0%
5.6.2 Purchasing Information 0%
Verification of Purchased Services and
5.6.3 Service-related Product 0%
5.7 Execution of Service 0%
5.7.1 Control of Service Provision 0%
5.7.1.1 General 0%
5.7.1.2 Documentation 0%
5.7.2 Service Quality Plan 0%
5.7.2.1 General 0%
5.7.2.2 Plan Content 0%
5.7.2.3 Plan Approval 0%
5.7.3 Identification and Traceability 0%
5.7.4 Service-related Product Status 0%
5.7.5 Customer Property 0%
5.7.6 Preservation of Service-related Product 0%
5.7.7 Validation of Service-related Product 0%
Preventative Maintenance, Inspection and
5.7.8 Test Program 0%