Академический Документы
Профессиональный Документы
Культура Документы
Set up Time
Flexibility
Style change
Planning
Coordination of capabilities
Capacity Planning
TNA
Secured
1 2
A time and action plan A time and action plan with defined days,
does not exist. actions and responsibilities exists and is fulfilled.
Secured Score
3 4
A time and action plan with defined days, actions and responsibilities A time and action plan with defined days, actions and esponsibilities exists
exists and is fulfilled. A suitable tracking system is used. The time and and is fulfilled. A suitable tracking system is used. The time and action plan is
action plan is designed for the whole production and thus the individual designed for the whole production and thus the individual production steps
production steps are coordinated. are coordinated. Each style has a seperate time and action plan.