Академический Документы
Профессиональный Документы
Культура Документы
4 DOHC >
Valve stem oil seal Installation of the valve stem oil seal
installer
(09222-2B100)
Crankshaft rear oil seal Installation of the crankshaft rear oil seal
installer
A : (09231-H1100)
B : (09231-2B200)
Components
Removal
Tightening torque
Hose clamp bolt:
2.9 ~ 4.9N.m (0.3 ~ 0.5kgf.m, 2.2 ~ 3.6lb-ft)
Air cleaner assembly bolts:
7.8 ~ 11.8N.m (0.8 ~ 1.0kgf.m, 5.8 ~ 7.2lb-ft)
3. Disconnect the battery positive terminal (A) and the ECM connectors (B).
Tightening torque :
9.8 ~ 11.8N.m (1.0 ~ 1.2kgf.m, 7.2 ~ 8.7lb-ft)
5. Remove the battery tray (A).
Tightening torque :
9.8 ~ 11.8N.m (1.0 ~ 1.2kgf.m, 7.2 ~ 8.7lb-ft)
Tightening torque:
6.9 ~ 10.8N.m (0.7 ~ 1.1kgf.m, 5.1 ~ 8.0lb-ft)
7. Loosen the drain plug and drain the coolant. Open the radiator cap to make rapid draining.
Never remove the radiator cap when the engine is hot. Serious scalding could be caused by hot fluid
under high pressure escaping from the radiator.
8. Remove the radiator upper hose (A) and lower hose (B).
Install the radiator hoses as shown illustrations.
9. Recover the refrigerant and then remove the high pressure pipe and low pressure pipe. (Refer to Air
conditioning system in HA Group.)
10. Remove the front bumper after disconnecting the wiring connectors. (Refer to Bumper in BD group)
11. Remove the rail (A) and remove the front end module (FEM) (B) with the cooling module assembly after
disconnecting the wiring connectors.
12. Disconnect the engine wiring harness connectors and remove the wiring harness protectors.
(1) Injector connectors (A)
(2) OCV connector (B)
(3) Alternator connector (C)
13. Disconnect the (+) cable (A) from the fuse box.
14. Disconnect the brake booster vacuum hose (A), the PCV hose (B) and the fuel hose (C).
15. Disconnect the PCSV hose (A) and the heater hoses (B).
Tightening torque:
39.2 ~ 58.8 N.m (4.0 ~ 6.0 kgf.m, 28.9 ~ 43.4 lb-ft)