Вы находитесь на странице: 1из 3

REQUEST FOR INSPECTION

Project : _______________________________________________________________________

Structure Type/Location : ________________________________________________________

Drawing Reference : _____________________________________________________________


_______________________________________________________________________________

1st Inspection 2nd Inspection 3rd Inspection


Date : Date : Date :
Time : Time : Time :
ü X ü X ü X

FORMWORK
1 Dimensions

2 Level & Plumb

3 Tightness of Joints

4 Rigidity

5 Cleanliness

6 Stop/Drop Formwork

REINFORCEMENT
1 Diameter

2 Spacing

3 Type HT/MS

4 Cleanliness

5 Cover

6 Hooks & Laps

7 Tying Wire

8 Rigidity

9 Starter Bars

10 Bonding Bars

11 Construction Joint

M & E / SANITARY & PLUMBING


1 Boxouts
2 Pipe Sleeves
3 Trimmer Bars

REMARKS
1

Part 2
_______________________ ____________________ __________________
Name/Signature (Site Supervisor) Name/Signature (M & E RTO) Name/Signature (RE/RTO)

1a) Request Submitted by Contractor: TYCOON CONSTRUCTION PTE LTD

______________________________________________ ___________ __________


Name & Signature (Contractor's Representative) Date Time

1b) Request for Inspection: __________________________________________________


________________________________________________________________________
________________________________________________________________________

2)* All the Necessary M&E Block-outs and Holes are Allowed For and In Order:
All Sanitary and Plumbing Block-Outs and Pipe Sleeves are provided and In Order:

______________________________________________ ___________ __________


Name & Signature (Contractor's M&E Co-Ordinator/Rep.) Date Time

3)* All the Necessary M&E Block-outs and Holes are Allowed For and In Order:
All Sanitary and Plumbing Block-Outs and Pipe Sleeves are provided and In Order:

______________________________________________ ___________ __________


Name & Signature (Contractor's M&E RTO) Date Time

4) The RC Work has been Checked and Found to be In Order:

______________________________________________ ___________ __________


Name & Signature (Contractor's Representative) Date Time

5) Drawing Reference Nos:

6) Receipt by: ____________________________________________________________


Name & Signature (RTO) Date Time

Part 2
* Delete section where not applicable

Part 2

Вам также может понравиться