Tawke Field (DNO) Atrush Discovery (TAQA)


Ber Behr-1 TD 3993m (Chia Gara).
Discovered 2006 Discovery well: Atrush-1 (2011)
Spud Oct 2011. Susp May 2012. Swara Tika Discovery (HKN)
Reservoirs: Jeribe and Kometan/Dokan/Qamchuqa Reservoirs: Cretaceous,Jurassic,Triassic

q
300m Jurassic oil column but failed to flow Discovery well: Swara Tika-1 (2011)
Resources: 734 mmbbls (2P) Resources: 647 mmbbls (contingent) + 70 mmbbls (prospective)
(heavy oil). Sidetrack to retest Q2 2013 Reservoirs: Jurassic/Triassic (457m gross oil column)
Production Capacity: 100,000 bopd (Plan for 150,000 bopd CPF by 2014) Production: 30,000 bopd EPF by Q1 2013. Estimate 5000 bopd. MARAGHEN
Production: 10,000 bopd EPF completed
Tawke-17 (Deep) drilling ahead @ 4350m. PTD 4800m (Triassic)
Swara Tika-2 TD ~3700m. (Triassic). Spud Nov 2011. Atrush-1 completed workover and connected to EWT
Tawke-20 1st Cretaceous horizontal well spud Dec 2012 - drilling ahead.
Tested 15,000 bopd (35 API) and associated gas Atrush-2 TD 1750m (Butmah)
Mateen-1(2011). Dry hole. East Swara Tika-1 planned spud Apr 2013 BONAB
Spud May 2012. RR Sept 2012. 3 DSTs conducted over BSAM
reservoir (Jurassic) aggregate 42,000 bopd (27 API). Additional
Mangesh-1 spud Sept 2012. Drilling tests in Butmah (1450 bopd) and Adiayah (650 bopd) heavy oil.
SINDI AMEDI Gara-1 spud Nov 4 2012. Drilling. HC shows in Kurra Chine Atrush-3 PTD 1700m. Spud March 26th 2013
Perenco 41.25%
Oryx Petroleum 33.75% Bijeel Field (Kalegran)
KRG 25% Discovery well: Bijeel-1 (2010)
March 2013 KRG exercised their 25% back-in right to PSC
Reservoirs: Jurassic (13 API)
Resources: 2.4 billion barrels (STOIIP)
TAWKE
Peshkabir-1 TD 4092m (Triassic) DNO 55%
Production: 10,000 bopd EPF planned for Q2 2013
YOLACAN Spud Sept 2011. Susp July 2012 Genel Enerji 25% TW20 TW14 Bijeel-1. workover completed Feb 2013. Commence EWT May 2013
LELAC Jurassic Sargelu test oil/water cut (27-29 API) KRG 20 %
)^
=_
=) =)
=) =)TW19 TW11
=^
TW17 C Deralok HPP
Rovi PSC (Chevron) Bijeel-7 spud Dec 2012.
Water in Triassic/ Cretaceous.
=
)
=
)=
)
=
)=
)
TW16=
) =
))
TW18 TW4
_)
=
TW5 TAWKE
TW13TW3
Q
261 MW
Rovi South-1 (2010) TD 4027m.
200sqkm 3D seismic acquisition completed TW10=)
)== TW2 Bakrman-1 spud May 2012. TD 3930m Sept 2012.
KARATCHOK WEST
¾C
Tawke
TW9
Zakho CCGT
MT1 BLOCK I Initial well test flowed oil and undewent EWT
Plan to spud additional commitment well Q3 2013 Kurra Chine tested 2616 bopd + 5.86 mmcfd. Testing ongoing

FISH KHABUR Μ
PS1 5000 BOPD 1000 MW Gulak-1 spud July 2012. TD 3641m.
Minor inflow from Jurassic. Suspended
ULAYYAN
KARATCHOK
Q
37°0'0"N

TEL Linnava-1
4100000

4100000
GHARAB Spud Apr 2012 Susp Dec 2012.
RUMAILAN Tested 6 zones Jurassic/Triassic

37°0'0"N
No commercial flow obtained HAMZAH CENTRAL DOHUK MN1 GA1 Sarta PSC (Chevron)
Murphy 50%
Petroquest 30% _
^ SARSANG
HKN 56.25%
_
^ Sarta Central-A1 (2010) TD 2702m
Tested 1,000 bopd from the Jurassic. 2011 workover + EWT.
KRG 20 % Marathon 18.75%
SUFAYA
KRG 25 % Plan to spud additional commitment well Q3 2013
Dohuk Discovery (DNO) Q BLOCK II
= MUSHORAH Dohuk DF
500MW CDohuk CGT MIANDOAB
Discovery well: Summail-1 (2011) = Q LN1
Reservoirs: Cretaceous (gas), Jurassic (heavy oil) 500 MW
SWARA
EST1
Resources: 102 MMBOE contingent =
) SULEVANI BER BEHR TIKA #
* Harir/Safeen PSCs (Marathon)
SM1 tested 11.6 mmcfd in Cretaceous Petroquest 80% Genel Energy 40% )
= Harir-1 TD 3800m (Triassic)
Gas field development to supply Dohuk power stations
KRG 20 % Q
Gulf Keystone 40%
KRG 20 %
ST1
= ST2
) Spud July 2012. Abandoned Dec 2012. Wet.
BB1 SHEIKH ADI AT2
AT3 Safeen-1 projected spud Q1 2013. PTD 3455m
DOHUK DOHUK
SHEIKH
Gulf Keystone 80%
KRG 20 % = )
Q
)
ATRUSH=
Q _
^ Mirawa-1 projected spud Q1 2013. PTD 3900m
DNO 40%
Genel Energy 40%
Q
C Dohuk
29MW ADI
AT1 ATRUSH
TAQA 39.9%
DINARTA
Hess Middle East 64%
2D Seismic completed
KRG 20 %
SM_E1 Q
SUMMAIL =
)
Q SA2 Shamaran 20.1% Petroceltic 16%
Sheikh Adi Discovery (Gulf Keystone) SM1 Q
=
) SH4 SH5
Marathon 15%
KRG 25 % _
^
BAKRMAN KRG 20 %
Discovery well: Sheikh Adi-2 (2012) SA1 SH10 BM1
NAOUR Reservoirs: Jurassic (15-18 API) KH1
AL QUSH
ExxonMobil 80% AQ È
)
Q
SHAIKAN
)
=
SH1 #
* SHAIKAN
Q
=
)
Gulf Keystone 60% Dinarta / Shakrok PSCs
SA-2 tested aggregate flow rate of 4235 B KRG 20 % #
* SH3
*=
=
)
# SH7
SH8
Q
)
= Q
SH2 MOL (Kalegran) 16% SH6
Texas Keystone 4%
Shakrok-1 planned spud Q3 2013
Dinarta-1 planned spud Q4 2013
=
bopd from 4 Jurassic zones (15-18 API)
AlBQ
È
)
Q=
È
)
B Q
Q)
È
Q)
È
)
Q
È
)=
B
Qush-1
È
) Q
È Bpreparing
Q
È
)
QB
È
)
= BBQ= BB =
È
) to spud June 2013 SM2 CShaikan CCGT KRG 20 %
B
BJ3
Dinarta 2D seismic acquistion recommenced
MAHABAD
B Q)
)
È
Q
È
) Q=
È _
^
= JEBEL
) 1000 MW
AKRE-BIJEEL
MOL (Kalegran) 64%
SIMRIT Q SI1
)
= Gulf Keystone 16%

Shaikan Field (Gulf Keystone) =


)
B _
^ SM3 ROVI #
*
KRG 20 %

Q
=
)
RAFAN Q
JEBEL Chevron 60% BJ6 BJ1
Discovery well: Shaikan-1 (2009) OMV 15%
RS1
=
)
BIJEEL BJ2
Bina Bawi Discovery (OMV)
Reservoirs: Jurassic/Triassic (~17 API) KAND Q
)
= #
* Q Discovery well: Bina Bawi-1
Resources: 2,660 mmbbls recoverable* ))
= ==
Mosul Dam
JABAL
KRG 25%
ROVI
BJ4
#
* BE1 Reservoirs: Mus, Upper Butmah (Jurassic)
=
) BUTMAH )
1052MW
= KAND AIN SIFNI SOUTH
Production Capacity : 40,000 bopd by mid 2013. Constructing 2 EPFs. C Hunt 60% BJ7
_C
^ Resources: 500-1000 mmboe contingent
Completed 5 well appraisal program.
#
Afren 20%
*BT1
KRG 20 % Gopal HPP QGL1 Production: 5000 bopd EWT under construction. Due to commence Apr 2013
Shaikan-7 expected spud Q1 2013 to target Permian prospects. RV2 620 MW CHOMAN BB-3 2 Jurassic tests aggregate flow 4000bopd + 15mmcfd
4050000

4050000
Shaikan-10 1st development well expected spud Q1 2013.
)
=
B
Simrit Discovery (Hunt)
Discovery well: Simrit-1 (2011) #
* SC2
BJ5
#
* HR1
BB-4 spud 17 June 2012. PTD 4800m(Permian). Drilling @4600m.
GUSAIR Reservoir: Cretaceous/Jurassic/Triassic #
* B
BB-5 spud 14 Oct 2012. PTD 3600m (Triassic). Drilling @3241m.
3D seismic acquisition to commence Q2 2013
Resources: 42 MMBOE contingent + 227 MMBOE prospective (June 2011)
Simrit-2 : 3 Kurra Chine tests aggregate flow rate13,584 bopd JS1
(39° API).3 L Jurassic tests aggregate flow rate 5,368 bopd (21 API) . #
*
W/O rig conducting 6 additional tests in Cretaceous/U Jurassic. ML1
#
* #
* ML2 SARTA
Chevron 60%
SCA1
Q
=
)
SARTA Taq Taq Field (TTOPCO)
Simrit-3 spud Sept 2012. Currently at 3500m.
Hydrocarbon shows =
)
B in Cretaceous/Jurassic/Triassic BA
BR4
#
*
BARDA RASH
Afren 60%
OMV 15%
KRG 25%
CENTRAL
HARIR MR1
Marathon 45%
#
* Discovered: 1961
BARDA BR1 Komet 20% Reservoirs: Pilaspi (26 API) , Shiranish/Kometan/U Qamchuqa (46 API)
¾ )
=
B #
* =)
)
RASH = KRG 20 %
Total 35%
KRG 20 % Resources: 647 mmboe (2P)
B Kazak ALAN
) BR3
=
=
)
B 10000 BOPD Bashiqa-1 preparing to spud June 2013
#
*BR5 BETWATA
ExxonMobil 80% HINDREN
Production Capacity: 120,000 bopd. Projected 200,000 bopd by 2014.
Domestic and trucked exports to Turkey.

Iran
KRG 20 %
SASAN BASHIQA
TT-18 reached TD Jan 2013. Testing
ExxonMobil 80% TT-22 (deep) plan spud Q1 2013. PTD 5400m (Triassic).
TALL KRG 20 %
Q
È
)
BENENAN ERBIL
'AFAR Barda Rash Field (Afren) ER1 Q
È ER2Gas Plus
) DNO 40% BS1A
Discovery well: Barda Rash-1 (2009) B AS1
#
* BN1
Erbil 40%
Q
=
)
BASTORA
PIRMAM
ExxonMobil 80% SF1 SK1
Reservoir: Cretaceous and Jurassic (Mus/Adaiyah) B
KRG 20 %
_
^BS2
KRG 20 % #
* #
*
Resources: 190 B mmbbls (2P) + 1243 mmbbls contingent
ATSHAN
MOSEL Kalak
100000 BOPD
SHAKROK
Production: ~2500 bopd (Nov 2012) Hess Middle East 64% Qush Tappa-1 TD ~4800m (2011).
Phase II drilling program 2 + 2 wells commenced ¾ SAFEEN
Petroceltic 16%
KRG 20 %

Iraq
IBRAHIM MALA
OMAR B
MO1 BB5
#
* Marathon 45%
Total 35%
Harir ICE

= Benenan Discovery (DNO)


KRG 20 %
200 MW
C
Mala Omar-1 TD ~5300m (2012) BB4
Discovery well: Hawler -1 (2008)
Reservoir: Bekhme/Najmah (16 API)
Erbil to Dohuk gas pipeline
Due to be completed Q1 2013 (60 mmscfd)
_
^ Khalakan PSC (Gas Plus)
BB2
Resources: 60-70 mmbbls recoverable (P50). BN1 BINA BB1 B
Q) C Khalakan-1 TD 3520m Kurra Chine (2012)
B-3 completed as a deviated multizone producer for #
* BAWI _
^
=
) DD2 HAWLER È BINA Ranya ICE Shewashan-1(DQE-51 1650hp) projected spud Q1 2013
Bekme and Najmah reservoirsB B Oryx 65%
BAWI
200 MW
Bastora Discovery (DNO) KNOC 15% IRBIL QALA DZE
ADAIYAH KRG 20 % Q SR1
)
= Repsol 80%
Discovery well: Bastora-1/1A (2011) = C BINA BAWI KRG 20 %
4000000

4000000
=
)
B
QALIAN
Reservoir: Bekhme (Cretaceous) Erbil
29MW
C
Koya ICE
OMV 36%
Genel Energy 44%
Resources: 100 mmbbls oil recoverable (P50) 18-19 API KRG 20 %
250 MW
Bastora-2 appraisal spud Dec 2012
#
ZG1
*ZG2 C Khurmala
1000 MW
CCGT
SHORISH Kewa Chirmila-1 TD 2,836m Shiranish (2009)
Kewa Chirmila-2 TD Pila Spi (2012)
TAQ TAQ
#
* Shorish-1 TD 2722m L Sarmord (2010) TTOPCO* 80%
Genel Enerji 44%
Qaiyarah and Najmah Fields (Sonangol) =
36°0'0"N

Addax Petroleum 36%


Reservoirs: Jeribe, Euphrates, Hartha (15.5 API) KRG 20 %
Demir Dagh Discovery (Oryx)
Reserves: 424 mmbbls and 200 mmbbls oil recoverable )
= TT15 Taq Taq Bazian-1 TD 4091m (Chia Gara) (2010)
Discovery well: Demir Dagh-1 (1960)

36°0'0"N
Pirdawd DF TT6 TT11
Production: projected 230,000 bopd by 2017. B contingent + 106 mmbblsBprospective
Resources: 122 mmbbls 1312MW =
) 60000 BOPD 500 bopd L Qamchuqa, water in U Qamchuqa
=
QASAB Demir Dagh-2 spud July 2012 C
TT14
=
)=)
)
TAQ
#
*Q)
=
) = TT8 ¾
)
=TAQ
)
È
B Q
=
)= SW1

Μ
Tested 39-42 API 2780 bopd (Adaiyah) and =
)
TT9 B
)
TT10z
#
*
TT4 )
= TT7
2210 bopd (Mus). Testing ongoing KHURMALA =TT13
) =
= = QUSH = TT16
) KH1
)
=
B = Q Miran Field (Genel Energy)
JAWAN È Kurdistan
) KHURMALA DOME
TAPPA
C Discovery well: Miran West-1 (2009)
)
= NOC 100% Dokan HPP

Khurmala Field (Kar Oil and Gas)


= KRG % QT1 KC2
400MW Reservoirs: U Cret (15-18 API), L Cret/Jurassic (wet gas)
= KHALAKAN Resources: 3.75 TCF and 161 mmboe liquids (recoverable)
B
QAIYARAH Reservoirs: Eocene, Shiranish/Kometan =KHURMALA Q Q Gas Plus Khalakan* 80%
KRG 20 %
Production: M-1 EWT commenced Dec 2012. Projected
NAJMAH
and Qamchuqa (34 API) 3-5,000 bopd for domestic market.
DOME
Production Capacity: 150,000 bopd + 100 mmcfd.
=
C Miran-3 TD 3528m. (Butmah) (2012)
Mosul
)
=
B Under going W/O of 19 wells. = Taq Taq HPP
270 MW KEWA CHIRMILA BLOCK V U Cretaceous tested max rate 1950 bopd (15 API).
750 MW = Genel Enerji 44% U Jurassic reservoir tested up to 22 mmscfd wet gas.
C Addax Petroleum 36%
Miran-4 TD 4850m (Jurassic) (2012)
)
=
B =Qayarah = KRG 20 % PIRAMAGRUN
Oill shows in U Cretaceous. Currently testing
Repsol 80%
¾ 16000 BOPD =
B
== Dibis ICE
KRG 20 % Miran-5 TD 1905m (U Cretaceous) (2012)
Tested 1350 bopd (16-18 API) from horizontal section.
640 MW CHEMCHEMAL Miran-6 projected spud Q1 2013
Kurdistan oil pipeline
= =
)
ISMAIL = == C Pearl Petroleum* 100%
Crescent Petroleum 40%
Miran-Deep projected spud Q3 2013
= = Dana Gas 40%
B
TaqTaq -> Khurmala (150,000 bopd) . Completed. Operational early 2013
Q
È
)
Khurmala -> Fish Khabur (1,000,000 bopd) - completion by end 2013. = MOL (Kalegran) 10%
KC1z
BZ2 #
* BZ1
= OMV 10%
Q
3950000

3950000
= BAZIAN
=
AVANAH M4 PENJWIN

)
=
=DOME
=
)
=
#
* ^ _ MIRAN
)
=
= ¾^
_Q
Bazian
M5 MR7
M2
Genel Energy 75%
KRG 25% Sangaw North-1 TD 4190m Kurra Chine (2011)
= =
KIRKUK Tasluja ICE
BAI
== CHEMCHEMAL
34000 BOPD
QM1
È
)
Q
=
)
M3 51MW Jurassic/Triassic tested uncommercial rates of gas
=
HASSAN = MIRAN
C + water. (high H2S)
)=
= = =
=
) Kirkuk
Chemchemal DF WEST #
* MR6
1000MW BAZIAN
Bai Hassan Field (North Oil Co) )
=150000 BOPD
C KNOC Bazian* 80%
Discovered: 1953
QARA
=
) =¾
) = QARA HANJEER
KRG 20%
Reservoirs: Oligocene, Shiranish/Kometan and Qamchuqa = SULAYMANIYAH Sangaw South-1 TD 3820m Sarki fm (2011)
CHAUQ == ExxonMobil 80%
Q
È
Q
È C
=)=
B
Resources: 1700 mmbbls + 8.9 TCF recoverable remaining B KRG 20 %
Production: 198,000 bopd, projected 240,000 bopd by 2014 =)=
=
Rizgari
))
== =
)=
) 29MW ARBAT EAST

=
) =)=
)
= == =
) ExxonMobil 80%

=)
KHABBAZ KRG 20 %
) =)
È
) = ==
) ARBAT
= )
) =)
)= = =
B
=
Kirkuk Field - Baba and Avanah domes (North Oil Co)
Discovered: 1927
= ==
B) Qara Dagh-1 TD 3908m Kometan (2011)
KIRKUK Tests in Shiranish and Tanjero produced oil
Reservoirs: Oligocene,Jaddala, Shiranish/Kometan and Qamchuqa Q
=
) (43-46 API) at non-commercial rates.
Resources: 10,800 mmbbls + 2.7 TCF recoverable remaining Mullah Abdullah CGT
402MW
==
)=
BABA Chevron awarded block by KRG Jan 2013
Production: 180,000 bopd. BP in talks over service contract DOME
to enhance production to 600,000 bopd by 2017 CKirkuk
27000 BOPD =
= ¾ C Saidsadq ICE Halabja PSC
)
= Khabbaz Field (North Oil Co) Chemchemal Field 200 MW Gazprom Neft awarded
Discovered: 1976 Discovered: 1930 block by KRG Feb 2013
Reservoirs: Jeribe, Oligocene, Kometan and Qamchuqa Reservoir: Pila Spi (43 API) Condensate SANGAW
KHANUQAH Resources: 2000 mmbbls + 3 TCF recoverable remaining Resources: 2.07 TCF recoverable NORTH

Production: 29,000 bopd


CTaza=CGT BARANAN
330MW

= == =
3900000

3900000
KOR MOR
Pearl Petroleum* 100% B
SN1
Crescent Petroleum 40%
==
= =
) Dana Gas 40%
MOL (Kalegran) 10% QARA
È
= =
OMV 10% TOPKHANA SS1 Q
=
)
DAGH HALABJA
Jambur Field (North Oil Co)
JAMBUR
Talisman 60% Q QARA DAGH
Gazprom Neft 80%
B Discovered: 1929 UNASSIGNED 20%
SANGAW SOUTH Chevron 80%
KRG 20 %
=
) Reservoirs: Jeribe, Euphrates, Eocene, Shiranish and Qamchuqa
KRG 20 %
KNOC 30% KRG 20 %
Resources: 3000 mmbbls + 9.0 TCF recoverable remaining = È UNASSIGNED 50%
North Salah ad Din (Sonoro Energy) È
= KOR MOR
ÈÈ KRG 20 %
Resources: 140 mmbbls recoverable MAKHUL Production: 50,000 bopd + 120 mmcfd, projected 80,000 bopd by 2014 =
) ÈÈ
B
Target: Jeribe asphalt
= =
)=)=
B= BÈÈ TOPKHANA Darbandikhan HPP
=
) = KM9 249MW
C
Drilling program to commence Q1 2013 == Q TP1
È
B Kor Mor Field (Dana/Crescent)
KURDAMIR

Discovery well: Kor Mor-1 (1928) #


* TP2 È K2
)
Q
35°0'0"N

K3
Baiji North Reservoirs: Jeribe, Euphrates, Oligocene (Gas); Shiranish (Oil) TAZA
S.E KOR
_
^ Q
)
È KURDAMIR
170000 BOPD = Resources: 1.8 TCF recoverable Oilsearch 60%
MOR K1 Talisman 40%

35°0'0"N
¾ = Production: 340 mmcfd + 15,000 bpd condensate
Total 20%
KRG 20 %
WesternZagros 40%
KRG 20 %
TZ1

= _
^ #
* B1
K-2 (Siniyah) =
)
È = Kurdamir Field (Talisman)
Baiji Salahedden

¾
20000 BOPD
¾ 140000 BOPD Q
=
)
JUDAIDA Discovery well: Kurdamir-1 (2010)
= CKalar CCGT Reservoirs: Oligocene and Eocene
B Resources: 643 mmbbls contingent + 1465 mmbbls prospective
=
== = == Taza-1 (Romfor 101)
= 1000 MW
Kurdamir-2 TD 4000m (Shiranish)
Q
) Spud July 2012. PTD 3250m (Jaddala)
= = )
AJEEL
==
È )
= Tested 200-250 bpd oil/water in Jeribe/Dhiban. PULKHANA
Spud Oct 2011. RR Jan 2013
= HAMRIN
Sidetrack 2 - fishing operations prior to drilling Euphrates.
GARMIAN
WesternZagros 40% Oligocene test 3450 bopd. Completed as an Oligocene producer
= Q=
È
) Gazprom Neft 40% Kurdamir-3 (KCA T-80 2000hp) spud 22 Feb 2013. Drilling @ 1977m.
= == KRG 20 %
= )
=
BB PU9
3D Seismic to commence recording Q2 2013
Ajeel Field (North Oil Co) Q
= PU8
)
3850000

3850000
Discovered :1961
Q
=
)
Reservoirs: Jeribe and Euphrates
= BBB
Resources: 500 mmbbls + 496 BCF recoverable remaining PULKHANA
SARQALA
Production: 23,500 bopd, projected 35,000 bopd by 2014 Topkhana-1 TD 3140m Jaddala (2011) =
)
Tested gas/condensate (61-62 API) from Oligocene MIL S1 #
* H1
SHAKAL Baram-1 projected spud July 2013. Target: Oligocene
Topkhana-2 projected spud Q3 2013. Target: Oligocene QASIM Q
=
)
Q SK1
)
= MQ1 3D Seismic acquisition planned Q3 2013
Hamrin Field (North Oil Co)
Discovered :1961 CHIA
Reservoirs: Jeribe, Euphrates/Serikagni and Oilgocene SURKH
SHAKAL
B
Q
ÈB CS11
CS10
Resources: 1,800 mmbbls + 750 BCF recoverable remaining
Production: Projected 60,000 bopd and 60 mmcfd by 2014 Pulkhana Field
Gazprom Neft 80%
KRG 20 %
B
=
)
B
B
=
)_
^
)
=# *
CHIA SURKH Chia Surkh Field (Genel Energy)
Discovery well: Pulkhana-5 (1956) = Genel Energy 60%
Petoil 20%
Discovered 1903
Iraq Drilling Co began reopening 72 existing wells and drilling Reservoirs: Euphrates, Jaddala, Shiranish and Balambo KRG 20 % Reservoirs: Fars, Jeribe, Jaddala and Shiranish
30 new wells in 2011/12 Resources: 38-328 mmbbls, P50 113 mmbbls recoverable Resources: 73.5 mmbbls oil/condensate + 283 bcf gas (EUR)
= Pulkana-9 (2011) flowed limited quantities of 30-33 API oil from Shiranish/Balambo Chia Surkh-10 spud October 2012 (PTD 2500m).
TIKRIT
Pulkana-8 (2010) tested 2,650 bopd (31.6 API) Shiranish. = Chia Surkh-11 projected spud Q3 2013. PTD 3000m
=
È
)
=
GILABAT
)
B
Shakal Discovery (GasProm Neft)
Discovery well: Shakal-1 (2009)
Reservoir: Jaddala, Aaliji )
È
B
Resources: 45 mmbbls BBB
INJANA
3 Test Aggregate max of 2,450 bopd (35 API) B

Mil Qasim Discovery (WesternZagros)


Discovery well: Mil Qasim-1 (2011)
Reservior: Upper Fars
MQ1 tested an aggregate of ~850 bopd (43-44 API)
È
B
KHASHM =
= Shallow well project to commence Q2 2013 AL AHMAR Sarqala Field (WesternZagros)
3800000

3800000
targeting the Upper Bakhtiari formation Discovery well: Sarqala-1RE (June 2011)
KHANAQIN
Khanaqin/Alwand
Reservoir: Jeribe
Qamar Field (North Oil Co) ¾ 20000 BOPD Resources: 24 mmbbls (contingent), 198 mmbbls (prospective)
Production Capacity: 5-6000 bopd
Discovery well: Qamar 1 (1979)
S-1RE initial Flow test: 9444 bopd (40 API)
)
È
B Reservoir: Jeribe
=
) Hasira-1 projected spud June 2013. Target: Oligocene
Resources: 200 mmbbls 250 BCF recoverable =
È
Haditha HPP Tested: 2200 bopd (42 API); GOR 4000 3D Seismic acquisition completion mid Apr 2013
660MW JARIA
Not Producing PIKA
C Samarra HPP
NAU
=
DOMAN
)
=
B 75MW MANSURIYAH
Q
=
)
C
Samarra =
250000 300000 350000 400000 450000 500000 550000 600000
42°0'0"E 43°0'0"E 44°0'0"E 45°0'0"E 46°0'0"E

==
È

Abbreviations
mmbbls Million barrels (oil)
Well Status Fields Facility - Active Kurdistan Blocks TCF Trillion cubic feet (gas)

Μ
BCF Billion cubic feet (gas)
#
*
_
^
Planned

Drilling/Testing
Oil Field/Discovery

Gas/Condensate Field/Discovery
C
Metering Station

Power Station
Awarded

Open
bopd
mmcfd
EWT
EPF
Barrels of oil per day
Million cubic feet gas per day
Extended well test
Early production facility (temporary)
0 5 10 20 30
Kilometers
40 50 Kurdistan & Northern Iraq
Q
B
Suspended

Plugged and Abandoned


Pipelines
Gas, Active
¾ Refinery

Facility - Constructing
Study

Kurdamir PSC
CPF
OIP
PSC
MW
Central production facility (permenant)
Oil in place
Production Sharing Contract
Mega watts
No Copying or Distribution without
Operator Activity Map
= Location

Hydrocarbons
Gas, Construction

Gas, Proposed
C
¾
Power Station

Refinery
Garmian PSC

Mountain Front
HPP
ICE
CGT
CCGT
Hydro Power Plant
Internal Combustion (Heavy Fuel Oil)
Single Cycle Gas Turbine
Combined Cycle Gas Turbine
permission of WesternZagros April 2013
DF Dual fuel (Gas + Fuel Oil) Data shown is to the best knowledge of WesternZagros at time of printing, however we cannot be Projection: WGS 84 UTM38N
=
) Oil Oil, Active Facility - Proposed
Country Boundaries held responsible for outdated or incorrect information. To inform us of any discrepancies, please contact:
È
) Oil and Gas Oil, Proposed ¾ Refinery
Urban Areas
Text box information investorrelations@westernzagros.com
Date printed: 04 April, 2013
Red text indicates recently updated information Date last saved: 04 April, 2013
È Gas/Condensate Product, Active C Power Station
File location: I:\AppData\ArcGIS\Maps\Activity Maps\130401_operator_activity_EXTERNAL.mxd

Вам также может понравиться