DMS656505-PRO-SAGH-RTU-SAT-ADDC-0001-V03
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 1 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
Revision History
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 2 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
Table of Contents
1 Introduction ................................................................................................................................ 4
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 3 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
1 Introduction
The following are the step-by- step procedure involved in testing and commissioning the
RTU signals from the process/SWGR or SCADA terminals to checking the IEC messages
up to the RTU output to the communication interface.
The purpose of this document is to describe the test procedures to be carried out to
provide sufficient evidence of correct configuration, testing and commissioning of the
Remote Terminal Unit for the RMU Substation as part of the DMS contract N-656478.
The tests shall be performed by SIEMENS Personnel and are witnessed by the customer
or his nominated representative. Each test (or sequence of tests) will be signed upon
completion by the SIEMENS Test Engineer and the present witnesses.
The primary intention of this document for testing is to guide the engineer in testing all
areas of the RTU and associated I/O signals.
The RTU SAT will verify the correct IEC address used for the Control Centre
communication using the protocol test kit (FINK) as per the RTU I/O connection diagram.
All test results shall be recorded on the associated test documentation and their attachments as
applicable. A correct test shall be recorded on the record sheets by placing a tick next to the
appropriate data in each row and in each column on each sheet (Column 1 for RTU SAT and
Column 2 for Point to Point test). Once the sheet has all data ticked it shall be signed in the
bottom right corner to show that no more tests are required.
RTU signal list pertaining to the substation under test will be used for recording the results and
will be signed off by SIEMENS, Consultants and ADDC representative.
Generally a set of following documents will be used for reference and conducting the testing and
commissioning of the RTU.
Title
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 5 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
Alarms and Indications will be simulated from the process/SWGR or field SCADA
terminal to verify signal transfer to the Digital Inputs of the RTU via MDF.
Commands from the RTU will drive a command relay to verify the correct command
up to process/SWGR via MDF.
The IEC 101/104 protocol analyzer (FINK) will be used to verify the RTU processing
of the above signals as messages on the communication port.
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 6 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
The list below mentioned the main items to be checked as part of SAT.
Cabinet features Checks Remarks
RTU Make/Type: SELTA O. K.
Door fastening O. K.
Check that the panel is fully secured to the wall O. K
Check that the panel door can be fully opened O. K
Labels O. K.
Cable inlet O. K.
Cable Marking & Identification as per Cable O. K
overview & Cable list
Earthing O. K.
Power supply 24 V DC terminal at MCB Output O. K.
Power supply 230 VAC terminal O. K.
Protection class O. K.
Heater O. K.
O. K.
RTU Sl.no: ___________
Station Address: O. K.
Mac Address: O. K.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 7 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 8 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 9 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
1 CPU 3000-L
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 10 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
The following light signaling is available, in this order, on the CPU3000 L Central Unit:
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
2.7 Normal operation from Local Control panel including Hit & Run function
For testing purpose MDF Terminal will be isolated & Dummy relay (with deactivated switching
contacts) will be used.
Note: The Hit and Run Function applies only for the Load Break switches
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
2.9.1 The following parameter checking is applicable for stations where GPRS Modem
communication is used.
Check the 104 Parameterization page for enabling (the check box is ticked) of the GPRS
‘Standby Connection’.
2.9.2 The following parameter checking is applicable for stations where Ethernet
Switch communication is used.
Check the IEC 104 Ethernet Parameterization page for enabling (the check box is ticked) of the
Ethernet ‘Standby Connection’.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
The below signature confirms, that the tests results were within the specified boundaries and that no relevant errors were
found.
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 15 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
Appendix 1
RTU SAT Analogue Measurements Test Sheets _______ pages
DMS656505-PRO-SAGH-RTU-SAT-ALL-0001-V01 Page 16 of 17
SAT Test Book ADDC
N-656505 RTU of RMU Substation DMS Project
EM DG SWS Contract No.: MBZ- H2 Project
Appendix 2