Вы находитесь на странице: 1из 3

DOC. REF.

:
PROJECT TITLE

OPERATION
REQUEST FOR INSPECTION (RFI)
Subcontractor : Date :

Location : Time :

Reference Reference
Drawing Documents

Work Item

Activity

Originator Acknowledged by
Participant Main Contractor Main Contractor Consultant's Engineer *Owner's Rep / Engineer
(Operation) (QA/QC) Representative *(if
applicable)
Signature

Name
Date
To be attended by

Inspection Results :

Inspection passed. The Contractor is allowed to proceed with the works

Remedial works listed below to be completed and inspection is required after remedial works

Remedial works listed below to be completed but no further inspection required

Rejected

Remarks/Comments :

Inspected by
Main Contractor Main Contractor Consultant's Engineer *Owner's Rep / Engineer
Participant
(Operation) (QA/QC) Representative *(if
applicable)
Signature

Name
Date
To be attended by
DOC. REF. :
PROJECT TITLE

Electrical Services
Earthing System - Installation & Inspection Checklist
Location :

Identity :

Checking
Item Descriptions Yes No Date Remarks
Method
95mm sq Cable Laying Inspection
1 Cable size & brand Visual
2 Inspection on cable laying as per Visual
approved construction/shop drawings
Copper Tape Laying Inspection
3 Copper tape size & brand Visual
4 Inspection on copper tape laying as per Visual
approved construction/shop drawings
5 Tape clip run interval 1m interval Visual
Test point inspection
6 Test point brand Visual
7 Check the position of test point installed as per Visual
approved drawings
Exothermic welding inspection
8 Check the condition of the exothermic weld Visual
Earth Test Pit (chamber Inspection)
9 The position of chamber as per approved drawings Visual
10 Finishing level of earth chamber Visual
11 Earth chamber condition Visual

Signed by Sub Contractor : Designation Date :

Signed by Main Contractor : Designation Date :

Sign by Consultant : Designation Date :

* Delete where not applicable


Add items in blank where necessary
! Optional / Randomly

Вам также может понравиться