Вы находитесь на странице: 1из 1

No Rev

CALCULATION SHEET
Prepared by Date

Project: Melbourne Main Sewer PH 15 Jan 18

Checked by Date

Subject: Crane Footing for MMR002

Ultimate bearing capacity estimate after Meyerhof


Reference: Foundation Analysis and Design, JE Bowles, 4th Edn, McGraw Hill, 1988, p188-189.

Assumptions:

Strength reduction
Geology g Edef cu c' f' Layer base level gw factor

[kN/m3] [kN/m2] [kN/m2] [kN/m2] [degree] [m] [kN/m3] fg Reference table 10.3.3a in AS 5100.3
18 50,000 0.00 0.00 35 15 10 0.45
0 0 0.00 0.00 0 0 0

max. Displacement 0.0254 [m] Footing width, B 0.90 [m] Footing length, L 1.00 [m] as maximum stress area

Depth [m] g cu f' Nq Ng Nc c' Kp sc sq=sg dc dq=dg q qult [kN/m2] fg*qult


0.0 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.00 1.00 0 401 180
0.1 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.04 1.02 1.8 491 221
0.2 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.09 1.04 3.6 584 263
0.3 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.13 1.06 5.4 681 307
0.4 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.17 1.09 7.2 782 352
0.5 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.21 1.11 9 885 398
0.6 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.26 1.13 10.8 993 447
0.7 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.30 1.15 12.6 1103 496
0.8 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.34 1.17 14.4 1217 548
0.9 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.38 1.19 16.2 1334 601
1.0 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.43 1.21 18 1455 655
1.1 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.47 1.23 19.8 1579 711
1.2 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.51 1.26 21.6 1707 768
1.3 18 0 35 33.30 37.15 46.12 0.00 3.69 1.66 1.33 1.55 1.28 23.4 1838 827