CONSTRUCTION METHODS

1.0. INTRODUCTION

A pre-construction conference is to be conducted before the start of the project together with the
Project Engineer, Materials Engineer and Planning Engineer both in the government and the
contractor. A Quality Control Program is to be submitted and discussed during the said conference.

2.0. BRIEF DESCRIPTION OF CONTRACT WORKS

The project is a construction of_____________________________________________. The


contractor will see to it that the project engineer of the government must be present during laying
out of the project.

3.0 CONSTRUCTION METHODS AND PROCEDURE

3.1 Methodology of General Approach


Mobilize all equipment as per contract to the project site. Layout will be done together with the
project engineer of the government. All construction materials used must conform to the required
DPWH Standard Specifications Requirements. All testing must be performed at the project site to
ensure good quality and satisfactorily passed the tests. The approved plan must be followed. The
project engineer of the government from time to time must supervised and checked the contractor's
work as to the approved specification and plan. Pouring permit must be approved by the project
engineer of the government before concrete pouring activities. The Materials and Project Engineer
of the contractor must be at the project site to ensure good quality of the project.

3.2 Program of Work


The item of works in the contract must be done based on the approved program of work of the
government. The accomplishment of the project must be closely monitored based on the bar chart
and s-curve to avoid negative slippage of the contract project.

3.3 Financial Progress


The progress billing will be in accordance to the actual accomplishment performed monthly.