DISCOVERIES AND DEVELOPMENT

BLOCKS WITH DISCOVERIES BLOCKS WITH DEVELOPMENT PLANS


* Map last updated on May 30, 2013 following Ber Bahr discovery by Genel Energy

6. BER BAHR - Operator: Genel Energy Size: 208 square kilometres Activity: Ber Bahr 1 spudded in 1. TAWKE - Operator: DNO Size: 594 square kilometres Reservoirs: Jeribe, Shiranish, Kometan,
2012. Drilled to 3,933 metres in the Chia Zairi formation, encountering 300 metres of oil shows, 2
TURKEY Qamchuqa Activity: 19 wells drilled Discovery:Tawke-1 in 2006 Production: 60,000 bopd Tawke-16:
drill stem tests inconclusive. Sidetrack tested May 2013, producing flow rates of 2,100 bopd. exploration well completed 2011, hydrocarbons shows announced Tawke-17 (deep exploration
7. SHEIKH ADI - Operator: Gulf Keystone Size: 180 square kilometres Shekh Adi-1: spudded 2010. well): Tawke-17 drilled to 4,775 metres, deepest well drilled in the field. Oil and gas shows in Jurassic
Preliminary evaluation shows 1 billion (P90) and 3 billion (P10) barrels of gross oil in place. Sheikh Silopi SINDI-AMEDI and Triassic intervals. April 2013 testing began on Tawke-17. Tawke-18: spudded May 2012. Completed
Adi-2: spudded in May 2012, reached depth of 2,754 metres. Four reservoir zones tested between WEST as a Cretaceous producer. Drilled to a total depth of 3,085 metres. Tawke-19: drilling ahead Tawke-20:
1,420 metres and 1,700 metres, total stabilised aggregate flow rates of 4,235 bopd, discovery Dayrik two-rig development drilling programme in process, drilled first horizontal well in the Tawke field
announced on November 8, 2012 Zakho 1 SINDI-AMEDI Activity: Studies underway for 150,000 bopd by 2014, production capacity now at 100,000 bopd
12. AIN SIFNI - Operator: Hunt Oil Size: 549 square kilometres Simrit-1: re-entry in May 2011, TAWKE EAST Reserves: 1.9 billion barrels (P10), 1.3 billion barrels (P50), 900 million barrels (P90)
Fish Khabur Amadiya
drilled to a total depth of 3,075 metres, encountered oil column between 1,110 metres and 3,077 5. SARSANG - Operator: HKN Size: 1,085 square kilometres Seismic: 730 line kilometres of seismic
metres, testing completed Simrit-2: spudded October 2011. Reached depth of 3,800 metres in data collected by 2012 Swara Tika-1: spudded in August 2010. Drill-stem test run at 3,044 metres
Triassic age, KurraChine reservoir, 400 metres of hydrocarbons extending through Cretaceous, 5
CENTRAL DOHUK showing flow rate of 4,100 bopd and 121,000 cubic metres. Tested to a depth of 3,810 metres in June
Jurassic and Triassic formations. Cumulative tests flowed 13,584 bpd of 39° API oil and 665,000 6 SARSANG 2011, encountering a 457-metre gross oil column. Discovered flow rates of 7,000 bopd of 37° API plus
cubic metres (23.5 mcf) per day, no water. Simrit-3: Spudded August 2012, testing ongoing. BER BAHR gas from three zones. First extended well test (EWT) facility at the Swara Tika-1 discovery well
SULEVANI
Reserves: 917 million barrels recoverable gross unrisked Dohuk 7 completed, commissioned in March 2013, production from the lower Triassic Swara Tika-2: spudded
14. AKRI-BIJEEL - Operator: MOL Size: 889 square kilometres Seismic: 2D seismic completed in 8 SHEIKH ADI 10 ATRUSH 2012, tested cumulative rates from selected Triassic intervals flowed 18,000 bopd Mangesh-1: spudded
August 2008 Reservoirs: Jurassic Bijeel-1: spudded December 2009, tested 3,200 bopd of 18° API DOHUK 0 25 50
DINARTA in 2012, evaluation of Cretaceous, Jurassic and Triassic intervals planned. Mangesh structure is the
and 26,410 cubic metres per day (933,000 cubic feet per day) of gas. Bijeel-1 extended well test AL QUSH 11 SHAIKAN
14
westernmost prospect on the Sarsang license. Gara-1: spudded in 2012
facility has been constructed, waiting for well tie-in. Bijeel-3 (Aqra-1): spudded Q4 2012, abandoned Kilometres 8. DOHUK - Operator: DNO Size: 162 square kilometres Khanke-1: completed with oil shows Sum-
Bijeel-4: planned for 2013 Bijeel-5: planned for 2013 to be drilled and tested Bijeel-6: planned for AKRI-BIJEEL mail-1: spudded April 2011, gas discovery in Cretaceous, 102,000 cubic metres per day (3.6 mcf per
2013 to be drilled and tested Bijeel-7: spudded Q4 2012 Bekhme-1: spudded March 2011, JABAL KAND 12 15 Bekhme day) in upper-Cretaceous layer and 226,500 cubic metres per day (8 mcf) per day in mid-Cretaceous
suspended December 2011, drilled to a total depth of 5,000 metres, no commercial flow discovered AIN SIFNI CHOMAN
ROVI layer. Well suspended in December 2011, possible re-entry for further testing. Activity: Additional
Bakram-1: spudded in May 2012, began testing Q4 2012, no oil shows Gulak-1: spudded in July appraisal wells planned for 2013
2012, planned to drill 3,658 metres to Triassic Kurra Chine Formation B zone, began testing in Q4
16
Harir IRAN 10. ATRUSH - Operator: TAQA Size: 269 square kilometres Seismic: completed 2010 Atrush-1:
2012. Gulak-1 testing finished February 2013. Total Reserves: 2.4 billion barrels 17 HARIR HINDREN spudded October 2010, re-entry in April 2011 to a total depth of 3,400 metres. Tested combined flow
15. ROVI - Operator: Chevron Size: 517 square kilometres. Spudded August 2010, re-drilled in BARDA RASH SARTA
BAESHIQA Shaqlawa BETWATA
of 6,393 bopd of 26° API. Atrush-2: appraisal well spudded May 23, 2012, maximum depth of 1,750
January 2011. Drilled to total depth of 4,027 metres, oil shows during drilling. Activity: One Tal Afar Salahaddin metres achieved July 2012. September 2012 combined flow rate from three separate cased hole tests
well to be drilled by November 2013 19 produced 42,200 bopd Activity: Declaration of Commercial Discovery November 7, 2012 Reserves:
16. SARTA - Operator: Chevron Size: 607 square kilometres, tested 1,000 bopd on 1 Jurassic interval, Mosul PIRMAM
ERBIL 627.3 million barrels of oil equivalent
re-entry June 2011, carried out extended well test Activity: One well to be drilled by Nov 2013 SHAKROK 11. SHAIKAN - Operator: Gulf Keystone Size: 283 square kilometres Reservoirs: Sargelu, Alan, Mus,
20. HAWLER - Operator: Oryx Size: 1,532 square kilometers Activity: Demir Dagh, spudded July SHORISH Butmah and Kurra Chine Production: 1,500-2,000 bopd trucked to the domestic market Shaikan-1:
2012. Drilled to total depth of 4,020 metres. Flowed at an aggregate rate of 12,000 bopd. Appraisal 20 SAFEEN
28
IRAQ QALA DZE spudded April 2009 to depth of 2,950 metres, significant oil in place Shaikan-2: spudded in 2010, drilled
well to spud in 2013. Seismic: Expanded 2D coverage and 3D seismic planned HAWLER Erbil BINA BAWI to total depth of 3,300 metres, flow of 18,900 bopd. Shaikan-3: shallow appraisal well tested in January
36. MIRAN - Operator: Genel Energy Size: 1,015 square kilometres Seismic: 730 square kilometres,
3D seismic underway Reservoirs: Upper and Lower Cretaceous, Jurassic Miran West-1: spudded MALA OMAR 2011, flow rate of 9,800 bopd Shaikan-4:spudded May 2011 to total depth of 3,387 metres, undergoing
testing, flow rates of 5,533 bopd of 39° API and 301,500 cubic metres per day (10.65 mcf per day) of gas
2009, tested at 3,640 bopd Miran West-2: spudded 2009, drilled to total depth of 4,246 metres, 34 at the Kurra Chine B and C wells combined Shaikan-5: spudded October 2011, total depth of 3,500
discovering hydrocarbons system in Lower Cretaceous and Jurassic layers. Gas discovery announced 55
Al Quwayr TAQ TAQ - metres, drilled to a depth of 1,571 metres Shaikan-6: spudded December 2011, total depth of 3,800
January 2011. Miran West-3: spudded August 2011, drilled to 3,528 metres. 623,000 cubic metres KHURMALA
(22 mcf) per day gas Miran West-4: projected to spud early 2012 Miran East-1: spudded March QUSH TAPPA KEWA CHIRMILA metres, drilled to a depth of 844 metres. Shaikan-7: well drilling ahead targeting deeper Triassic and
DOME KHALAKAN Permian Shaikan-8: spudded Q3 2012 for sour gas injection Shaikan-9: drilling ahead Activity: five
2012 with target depth 4,000 metres Total reserves: 56 million barrels (oil in place) in the Upper PIRAMAGRUN well appraisal program completed, constructing two early production facilities, 40,000 bopd capacity by
Cretaceous layer, 198 bcm (7 tcf) wet gas and 57 million barrels condensate in Lower Cretaceous/Jurassic 2013. Submitted Declaration of Commerciality. Total reserves: 12.4 billion barrels (P90)
Production: production expected by 2015 Activity: Block-wide 3D seismic complete 53 17. BARDA RASH - Operator: Afren Size: 265 square kilometres Barda Rash-1: spudded 2009, drilled
39. TOPKHANA - Operator: Talisman Size: 670 square kilometres Activity: 3D seismic acquisition CHEMCHEMAL
programme commenced 2012 Topkhana-1: spudded in 2011, indicated presence of gas and gas to 1,687 metres encountering oil in Cretaceous through Jurassic reservoirs, well tested in the Jurassic
Mus and Adaiyah formations, each producing at rates of 3,200 bopd, extended test of the BR-1 well
condensate, tested at up to 211,000 cubic metres (7.45 mcf) per day of gas and 1.66 barrels per 1 PENJWIN
mcm of condensate. Topkhana-2: expected to spud in Q4 2013 to define extent of the structure produced 440,000 barrels over three months. Barda Rash-1: began production August 2012, production
40. TAZA - Operator: Oil Search Size: 511 square kilometres Seismic: 232 kilometres of 2D 36 at 6,000 bopd Activity: Early production facility with capacity of 21,000 bopd commissioned Total
Baba Penjwin Reserves: 1.47 billion barrels recoverable
seismic data was acquired in 2010, interpretation completed Activity: Taza-1 well spudded July
Gurgur Chemchemal MIRAN 19. ERBIL - Operator: DNO Size: 313 square kilometres Production: 60 bopd of 18-19° API Hawler-1
2012. Taza-2 to spud second half of 2013. QARA HANJEER Sulaymaniyah
41. PULKHANA - Operator: Turkish entity Size: 529 square kilometres Seismic: 291 kilometres of 2D BAZIAN (Benenan): tested at 11,000 bopd of 34° API Hawler-2 (Erbil-2): tested at 300 bopd of 16° API Bas-
seismic Reservoirs: Dhiban, Euphrates, Jaddala, Shiranish and Balambo Kewa Chirmila-1: plugged ARBAT EAST tora-1: spudded September 2010 Total reserves: 100 million barrels of oil recoverable (P50) Bene-
Kirkuk nan-3: spudded July 2012, in September 2012 encountered 210-metre oil column in the Najmeh
and abandoned in October 2009 History: 8 wells drilled between 1927 and 2006 Pulkhana-1: drilled ARBAT
in 1927 to 647 metres, oil from shallow seep zones Pulkhana-5: drilled in 1956 to 2,896 metres, flow reservoir. Well produced 800-1,000 bpd, 2P oil-in-place volumes to 600-700 million barrels.
rate of 2,180 bopd Pulkhana-8: drilled in 2006, tested at 800 bopd, workover in 2011, testing flow of SANGAW 28. BINA BAWI - Operator: OMV Size: 240 square kilometres Reservoirs: Pilaspi, Shiranish, Kometan
and Upper Qamchuqa Bina Bawi-1: spudded August 2007, drilled to 3,350 metres with oil and gas
2,650 bopd of 31.6° API, and subsequently suspended Pulkhana-9: spudded April 2011 NORTH shows, but plugged and abandoned due to high levels of hydrogen sulphide Bina Bawi-2: plugged
48. KURDAMIR - Operator: Talisman Size: 340 square kilometres Reservoirs: Oligocene, Eocene BARANAN Khurmal
and Upper Cretaceous Kurdamir-1: spudded in 2010, drilled to total depth of 4,077 metres. and abandoned due to high levels of hydrogen sulphide Bina Bawi-3: spudded January 2011,
39 encountered hydrocarbons in a primary reservoir target. Extended well test began production in March
Estimated ultimate recovery of 65 million barrels of oil and condensate and 26.9 bcm (0.95 tcf) of
gas at Tertiary level, prospective estimates of 280 million barrels in Cretaceous layer Kurdamir-2: 52 KHOR TOPKHANA 2013. Initial capacity of EWT 5,000 barrels of oil equivalent per day potential to expand to 10,000
Tawuq MOR SANGAW SOUTH Halabjah barrels of oil equivalent per day. Bina Bawi-4: Spud June 2012 testing planned for Q2 2013 Bina
spudded October 2011 drilled to depth of 4,000 metres in Cretaceous. Oil column discovered in Block with discoveries
Oligocene. Stabilised flow rates 3,400 bpd of 39° API oil. QARA DAGH Bawi-5: Spud October 2012 testing planned for Q2 2013. Bina Bawi-4 and 5 together confirmed a
49. GARMIAN - Operator: WesternZagros Size: 1,780 square kilometres Reservoirs: Jeribe Sar- 40 KURDAMIR HALABJA
gross hydrocarbons column in the structure of at least 1,500 metres. Activity: Field Development Plan
qala-1: spudded June 2011, initial flow test of 9,444 bopd at 40° API Sarqala-1 produced more Discovery with development plan to be submitted Q3 2013
TAZA 48 34. TAQ TAQ - Operator: TTOPCO (Genel Energy, Addax Petroleum) Size: 951 square kilometres
than 1 million barrels of oil on extended well test. Hasira-1: anticipated spud date Q2-2013 well
will be another test of Jeribe formation and Oligocene Baram-1: anticipated spud date Q2 2013, 49
History: pre-existing discovery from 1961 with three wells drilled Reservoirs: Pilapsi 26 API, Shiranish,
Historical discovery Tuz Khurmatu 41 Kometan, Upper Qamchuga all at 46° API 12 producing wells at end of 2012, gross production capacity
will test Oligocene Sarqala-2: anticipated spud date 2014 Sarqala-2: planned spud in 2014
Total reserves: 24 million barrels (contingent), 198 million barrels (prospective) Mill Qasim-1: PULKHANA GARMIAN 120,000 bopd Taq Taq-16, 17, 18, 19: all spudded 2012 as Cretaceous development wells Kewa Chir-
spudded August 2011, reached 2,425 metres, initial open-hole drill stem test in Upper Fars Exploration area mila-1: plugged and abandoned in October 2009 Production: 80,000 bopd Production capacity:
reservoir. Testing program flowed 43° to 44° API oil. Four tests conducted at Mil Qasim-1 well. 51 150,000-200,000 bopd Total reserves: 647 million barrels of oil equivalent (2P), 1.041 billion barrels
43° to 44° API oil flowed, no water and no H2S Activity: 3D seismic acquisition programme Open area of oil equivalent (3P) recoverable Taq Taq-20, TT-21, TT-23, and TT-24: all planned to spud in 2013 as
Kifri Cretaceous development wells Reserves: 2P reserves 607 million barrels
planned Kurdamir-3: drilling commenced February 22, 2013 50 CHIA SURKH
50. SHAKAL - Operator: Gazprom Neft Size: 632 square kilometres Reservoirs: Jaddala, Aaliji 52. KHOR MOR - Operator: Crescent Petroleum, Dana Gas Reservoirs: Jeribe, Euphrates, Oligocene
Border
Tikrit SHAKAL (gas), Shiranish (oil) Khor Mor-9: completed 2011 Khor Mor-4: workover completed 2011 Production:
Shakal-1: first discovery in 1979. Re-spudded October 2008, three test aggregate of 2,450 bopd
35° API Total reserves: 45 million barrels Disputed territory border
IRAQ 80,000 barrels boepd Sale Gas: 9.3 mcm/d (330 mcf) Total reserves: 51 bcm (1.8 tcf) gas recoverable
51. CHIA SURKH - Operator: Genel Energy Size: 985 square kilometres Seismic: 307 kilometres of 55. KHURMALA DOME - Operator: KAR Group Size: 355 square km
2D seismic completed History: nine wells drilled from 1902 to 1952. Chia Surkh-10: spudded Qara Tappah
October 7, 2012 drilled to 1,696 metres in the Oligo-Miocene. Well test reached 11,950 bopd and HISTORICAL DISCOVERY
425,000 cubic metres (15 mcf) of gas. Chia Surkh 11: appraisal well currently drilling, and will be 53. CHEMCHEMAL - Reservoirs: Pila Spi 43° API condensates Total recoverable reserves: 58.6 bcm
completed in mid-2013. Activity: Early production anticipated 2014. (2.07 tcf) of gas
© 2013 Wildcat International FZ-LLC, The Oil & Gas Year, Kurdistan Region of Iraq 2013. All rights reserved.

LICENCES AND ENERGY INFRASTRUCTURE


LICENCES 37 BAZIAN - Operator: KNOC-Bazian, 80% KRG BI: 20% part carried
38 SANGAW NORTH- Open licence
1 TAWKE - Operator: DNO, 55% net interest Other production-sharing contract TURKEY 39 TOPKHANA - Operator: Talisman, 60% KRG BI: 20% fully carried and 20% net
(PSC) participant: Genel Energy, 25% KRG back-in interest (BI): 20% fully SINDI-AMEDI third-party interest
Silopi 4B
carried WEST 40 TAZA - Operator: Oil Search, 60% Other PSC participant: Total, 20% KRG BI: 20%
Dayrik
2 CENTRAL DOHUK - Operator: Murphy Oil, 50% Other PSC participant: Petroquest Zakho 1 SINDI-AMEDI 4A fully carried
Energy, 30% KRG BI: 20% fully carried TAWKE EAST 41 PULKHANA - Operator: Turkish entity, 40% KRG BI: 20% fully carried and 40% net
12 Fish Khabur 9 Amadiya
3 SULEVANI - Operator: Petroquest Energy, 80% KRG BI: 20% fully carried SYRIA CENTRAL DOHUK 2
third-party interest
4A SINDI - AMEDI EAST - Operator: Perenco, 30.94% Other PSC participant: Oryx 5 42 PENJWIN - Open licence
Petroleum, 25.31% KRG BI: 25% part carried, 18.75% net third-party interest 6 SARSANG 43 ARBAT EAST - Operator: ExxonMobil, 80% KRG BI: 20% fully carried
3 3 6
4B SINDI - AMEDI WEST - Open licence BER BAHR 44 ARBAT - Operator: Turkish entity, 80% KRG BI: 20% fully carried
SULEVANI
5 SARSANG - Operator: HKN Energy, 56.25% Other PSC participant: Marathon Oil, Dohuk 7 45 BARANAN - Operator: Total, 60% Other PSC participant: Murphy, 20% KRG BI:
8 SHEIKH ADI 10 13
18.75% KRG BI: 25% part carried DOHUK ATRUSH 20% fully carried
6 11 DINARTA 46
BER BAHR - Operator: Genel Energy, 40% Other PSC participant: Gulf Keystone, 9 AL QUSH SHAIKAN 0 25 50 QARA DAGH - Operator: Chevron 80% KRG BI: 20% fully carried
14
40% KRG BI: 20% fully carried Heavy crude oil 47 SANGAW SOUTH - Operator: KNOC, 30% KRG BI: 20% fully carried and 50% net
7 Pipeline capacity: 500,000 bopd AKRI-BIJEEL Kilometres
SHEIKH ADI - Operator: Gulf Keystone, 80% KRG BI: 20% fully carried 12 Bekhme 24 third-party interest
57 AIN SIFNI 15
8 DOHUK - Operator: DNO, 40% Other PSC participant: Genel Energy, 40% KRG BI: JABAL KAND CHOMAN 48 KURDAMIR - Operator: Talisman, 40% Other PSC participant: WesternZagros,
ROVI
20% fully carried Pipeline capacity: 1,000,000 bopd Harir
40% KRG BI: 20% fully carried
21 25
9 AL QUSH - Operator: ExxonMobil, 80% KRG BI: 20% fully carried 16 49 GARMIAN - Operator: WesternZagros, 40% Other PSC participant: Gazprom Neft,
18 17 HARIR HINDREN
10 ATRUSH - Operator: TAQA, 39.9% Other PSC participant: Shamaran, 20.1%, SARTA 23 40% KRG BI: 20% fully carried
BAESHIQA BARDA RASH
Shaqlawa BETWATA 50
Marathan 15% KRG BI: 25% fully carried Tal Afar
19
Salahaddin IRAN 51
SHAKAL - Operator: Gazprom Neft, 80% KRG BI: 20% fully carried
11 SHAIKAN - Operator: Gulf Keystone, 51% Other PSC participants: MOL, 13.6%, Mosul CHIA SURKH - Operator: Genel Energy, 60% Other PSC participant: Petoil 20%
7 ERBIL PIRMAM 26
Texas Keystone, 3.4% KRG BI: 20% part carried and 12% net third-party interest 29 22 KRG BI: 20% fully carried
12 AIN SIFNI - Operator: Hunt Oil, 60% Other PSC participant: Afren, 20% KRG BI: SHORISH 27 SHAKROK 32 52 KHOR MOR - Crescent Petroleum, Dana Gas
20
20% fully carried BINA BAWI QALA DZE 53 CHEMCHEMAL - Crescent Petroleum, Dana Gas
HAWLER Erbil 30 SAFEEN
13 DINARTA - Operator: Hess, 64% Other PSC participant: Petroceltic, 16% KRG BI: 28 54 QARA HANJEER - Operator: ExxonMobil, 80% KRG BI: 20% fully carried
20% fully carried MALA OMAR 55 KHURMALA DOME - KRG block General operator: Kar Group
14 AKRI-BIJEEL - Operator: MOL, 51.2% Other PSC participants: Gulf Keystone, 4 56 HALABJA - Operator: Gazprom Neft, 80% KRG BI: 20% fully carried
12.8%, KRG BI: 20% part carried and 16% net third-party interest Al Quwayr 55 QUSH TAPPA 34 57 JABAL KAND - Operator: Turkish entity, 40% KRG BI: 20% fully carried and 40%
1
KHURMALA 31 TAQ TAQ 33
15 ROVI - Operator: Chevron, 60% Other PSC participant: OMV, 15% KRG BI: 25% net third-party interest
DOME KEWA CHIRMILA KHALAKAN 35
part carried PIRAMAGRUN REFINERIES
16 SARTA - Operator: Chevron, 60% Other PSC participant: OMV, 15% KRG BI: 25% Pipeline capacity: 150,000 bopd CHEMCHEMAL
part carried Licensed area 7 ERBIL (KALAK) - Operator: KAR Group Current capacity: 80,000 bpd Planned ca-
53 Pipeline capacity: 500,000 bopd 42
17 BARDA RASH - Operator: Afren, 60% Other PSC participant: Komet Group, 20% pacity: 100,000 bpd by 2014
KRG BI: 20% fully carried Open area PENJWIN
18 BAESHIQA - Operator: ExxonMobil, 80% KRG BI: 20% fully carried 8 8 BAZIAN - Operator: WZA Petroleum Current capacity: 34,000 bpd Planned ca-
Taq Taq-Khurmala-Fish Khabur oil pipeline 5 36
19 Baba 54 2 Penjwin
ERBIL - Operator: DNO, 40% Other PSC participant: NewAge, 40% KRG BI: 20% Chemchemal 37 MIRAN
pacity: 80,000 bpd by 2014
Planned oil pipeline Gurgur QARA HANJEER Sulaymaniyah
fully carried BAZIAN 43
20 HAWLER - Operator: Oryx Petroleum, 65% Other PSC participant: KNOC, 15%, Planned heavy crude pipeline 9 TAWKE - Operator: DNO Current capacity: 5,000 bpd, field topping plant
Kirkuk 44 ARBAT EAST
KRG BI: 20% fully carried Khor Mor-Khurmala gas pipeline ARBAT
21 HARIR - Operator: Marathon Oil, 45% Other PSC participant: Total, 35% KRG BI: 38 POWER PLANTS
Planned Khurmala-Fish Khabur gas pipeline
20% fully carried SANGAW
45
22 PIRMAM - Operator: ExxonMobil, 80% KRG BI: 20% fully carried Tawke pipeline NORTH Khurmal 1 ERBIL - Operator: Mass Global Current capacity: 750 MW Planned capacity: 1
BARANAN
23 BETWATA - Operator: ExxonMobil, 80% KRG BI: 20% fully carried GW
Dohuk power plant gas pipeline 39
24 CHOMAN - Operator: Turkish entity, 80% KRG BI: 20% fully carried 52 KHOR 47
25 HINDREN - Operator: Turkish entity, 80% KRG BI: 20% fully carried Refinery pipeline Tawuq TOPKHANA SANGAW SOUTH 46 Halabjah 2 SULAYMANIYAH (CHEMCHEMAL) - Operator: Mass Global Current capacity:
MOR
26 SHAKROK - Operator: Hess, 64% Other PSC participant: Petroceltic, 16% KRG BI: Pipeline capacity QARA DAGH 56 750 MW Planned capacity: 1 GW
20% fully carried 40 48 HALABJA
27 SAFEEN - Operator: Marathon Oil, 45% Other PSC participant: Total, 35% KRG 12 Metering station TAZA KURDAMIR 3 DOHUK - Operator: Mass Global Current capacity: 500 MW
BI: 20% fully carried Oil refinery 41 49
28 BINA BAWI - Operator: OMV, 36% Other PSC participant: Genel Energy, 44% 1 Tuz Khurmatu PLANNED POWER PLANTS
PULKHANA GARMIAN
KRG BI: 20% fully carried Planned oil refinery
29 SHORISH - Open licence 4 KHURMALA - Capacity: 1.2 GW
30 1
Power plant
MALA OMAR - Open licence Kifri 51
31 QUSH TAPPA - Open licence Planned power plant 50 CHIA SURKH 5 SULAYMANIYAH (CHEMCHEMAL) - Capacity: 2 GW
1
32 QALA DZE - Operator: Repsol, 80% KRG BI: 20% fully carried Tikrit SHAKAL
33 KHALAKAN - Operator: Gas Plus Khalakan, 40% KRG BI: 20% fully carried and Major airport IRAQ 6 DOHUK - Capacity: 1.5 GW
40% net third-party interest, expected to be awarded to a Turkish entity
34 TAQ TAQ - KEWA CHIRMILA - Operator: TTOPCO (Genel Energy, 44%, Addax Border Qara Tappah EXPORT FACILITIES
Petroleum, 36%), 80% KRG BI: 20% fully carried Disputed territory border
35 PIRAMAGRUN - Operator: Repsol, 80% KRG BI: 20% fully carried 12 FISH KHABUR - Operator: North Oil Company Function: The facility is a metering
36 MIRAN - Operator: Genel Energy, 75% KRG BI: 25% part carried and truck-loading station and operates as a tie-in to the Kirkuk-Ceyhan pipeline.
© 2013 Wildcat International FZ-LLC, The Oil & Gas Year, Kurdistan Region of Iraq 2013. All rights reserved.