Вы находитесь на странице: 1из 1

Technical deviation for following jobs are pending:

 Technical deviation for use of Tikikote in place of foster for vapour barrier material is pending from EIL side.
 Technical deviation in proper format along with financial implication is pending for roller support. Present roller
support is not as per drawing. This matter has been informed to M/s Petron.
 Technical deviation for use of Puff in working temperature below -120 deg C as per EIL specification no 6-44-0003
clause 3.2 details specification is pending from EIL side.

Вам также может понравиться