Академический Документы
Профессиональный Документы
Культура Документы
200
#4
qq
total
#VALUE!
ALES
formaleta int
h areas
0.85 0.26 decan 52.45
1.15 2.42 canal 3.5675
1.15 0.35 reactor 238.08
2.15 15.57 digestor 59.1775
2.15 5.25 patio 78.3625
3.65 4.45 decant sec 37.385
3.5 168.00
3.5 25.34
3.5 45.85
1.65 5.28
1.65 11.06
1.65 5.28
286.07
CONCRETO MUROS - total
pared lateral L H grosor vol
1 1.25 2.55 0.2 0.6375 5.49
2 0 0 0.15 0
3 0 0 0.15 0
pared frontal L H grosor vol
1 2.55 6.2 0.2 3.162 CONCRETO
2.6 0.9 0.2 0.468 6.59 m³
pared de bomba
1 1.1 0.2 0.22
1.25 4 0.2 1
Piso L A grosor vol total
No. 1 1.9 2.5 0.2 0.95
No. 2 0.6 1.25 0.2 0.15 1.10
Concreto Piso
area plan 11.18
h 0.2
vol 2.236 M³
Concreto LOSA
area plan 11.18
h 0.15
vol 1.677 M³
REFUEZO LOSA
No.6 barras longitudes varillas quintales
lado 1 2 13.3333 26.6666667 5 1.66666667
lado 2 5.1 34 173.4 33 11
espac 0.15 200.066667 38 12.6666667
REFUEZO piso
No.4 barras longitudes varillas
lado 1 2 13.3333 26.6666667 5 0.71428571
lado 2 5.1 28.3333 144.5 28 4
espac 0.15 171.166667 33 4.71428571
espac 0.18 total
34.6336996
REFUEZO MUROS -largos
No.3 barras longitudes varillas
lado 1 4.95 41.25 204.1875 39 3
alto 1 5.1 56.6667 289 55 4.23076923
493.1875 94 7.23076923 total
No.4 barras longitudes varillas
alto var a 3.5 17 119 23 3.28571429 13.9450549
alto var b 3 16 96 18 2.57142857
alto var c 1.3 12 31.2 6 0.85714286
246.2 47 6.71428571
espac 0.24
espac 0.18
Bomba de expulsión ¼ HP 2 Q -
tubo pvc Ø2" 6 Q 130.00 Q 780.00
codo 90° Ø2" 8 Q 20.00 Q 160.00
valvulas de comp de Ø2" 2 Q 100.00 Q 200.00
ormaleta int
areas
0.26 decan 52.45
2.42 canal 3.5675
0.35 reactor 238.08
15.57 digestor 59.1775
5.25 patio 78.3625
4.45 decant sec 37.385
168.00
25.34
45.85
5.28
11.06
5.28
286.07
Concreto Muros
area MURO SUR 7.9
grosor 0.2
vol 1.58 total
area Muros later 4.1769 7.2769
grosor 1.52
vol 5.6969
Concreto cimentac
area planta 10.5524
h 0.15
vol 1.58286 M³
Concreto PISO
area planta 11.18
h 0.15
vol 1.677 M³
REFUEZO cimiento
No.4 barras longitudes varillas quintales
lado 1 2 13.3333333 26.6666667 5 0.71428571
lado 2 5.1 34 173.4 33 4.71428571
espac 0.15 200.066667 5.42857143
REFUEZO piso
No.4 barras longitudes varillas quintales
lado 1 2 13.3333333 26.6666667 5 0.71428571
lado 2 5.1 28.3333333 144.5 28 4
espac 0.15 171.166667 4.71428571
espac 0.18
Q 27,710.70
Q 27,710.70
Q 18,368.00 operador Q 40.00 Q 2,624.00 Q 1,750.00
Q 3,411.20 Q -
Q 273.00 M+2A+2Ay Q 6.00 Q 840.00 Q -
Q 280.00 Q - Q - Q 140.00
Q 17.50 Q - Q - Q 7.00
Q 22,349.70 Q 3,464.00 Q 1,897.00
Q 39,938.00
Q 39,938.00
Q 15,360.00 Instalador Q 25.00 Q 3,200.00 Q 1,750.00
Q - 10 Ay Q 75.00 Q 6,240.00 Q -
Q 1,600.00 operador Q 4.00 Q 640.00 Q 700.00
Q 1,200.00 operador Q 75.00 Q 450.00 Q 700.00
Q 3,328.00 Q - Q - Q -
Q 960.00 Q - Q - Q -
Q 3,000.00 laboratoris Q 120.00 Q 360.00 Q 450.00
Q 25,448.00 Q 10,890.00 Q 3,600.00
Q 166,555.06
Q 57,076.39
Q - armador Q 2.00 Q 568.90 Q 700.00
Q 1,057.69 Q 211.54
Q 85.00 Q - Q - Q 1,050.00
Q 38,092.80 3A+2ay Q 20.00 Q 4,761.60 Q 1,050.00
Q 2,565.25 contratista Q 20.00 Q 51.31 Q 1,400.00
Q - 3A+2ay Q 10.00 Q 42.31 Q -
Q 5,100.00 3A+2ay Q 10.00 Q 340.00 Q -
Q 46,900.74 Q 5,764.11 Q 4,411.54
Q 2,004.67
Q - armador Q 2.00 Q 101.70 Q -
Q 192.31 Q 38.46
Q 15.00 Q - Q - Q 1,050.00
Q - contratista Q 20.00 Q - Q -
Q 569.25 3A+2ay Q 10.00 Q 37.95 Q -
Q 776.56 Q 139.65 Q 1,088.46
Q 107,474.00
Q 500.00 Instalador Q 150.00 Q 150.00 Q 100.00
Q 500.00 Instalador Q 200.00 Q 200.00 Q 100.00
Q 1,000.00 Instalador Q 200.00 Q 200.00 Q 100.00
Q 650.00 fontanero Q 100.00 Q 100.00 Q 100.00
Q 3,198.00 fontanero Q 25.00 Q 75.00 Q -
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 260.00 fontanero Q 50.00 Q 100.00 Q 200.00
Q 80.00 fontanero Q 15.00 Q 60.00 Q -
Q - contratista Q - Q - Q -
Q 270.00 contratista Q 5.00 Q 15.00 Q -
Q 4,000.00 contratista Q 2,000.00 Q 2,000.00 Q -
madera 4
cemento 40
kilometraje 70
formaleta 160
trazo
48.3
90.00
138.3
cambio $
7.8 20
son Q 156.00
sueldos
ingeniero 300
maestro 150
albañil 150
ayudante 100
imprevisto
15%
Supe y direc
12%
utilidad
30%
IGSS e INT
12%
timb ing
0.10%
subtotal
fact isr
20%
GRAN TOTAL
No.
1
1.1
1.2
2
2.1
3
3.1
4
4.1
4.2
4.3
5
5.1
5.2
5.3
5.4
6
6.1
6.2
6.3
6.4
6.5
7
7.1
7.2
7.3
7.4
8
8.1
8.2
8.3
8.4
9
9.1
9.2
9.3
9.4
10
10.1
11
11.1
11.2
$338,512.82
DIVISION DE RENGLONES
COSTO POR RENGLON
TOTALES Porcentaje
Materiales Mano de Obra Transporte
Q 1,076,018.44 Q 458,739.14 Q 27,487.61 Q 1,562,245.19 59.17
Q 697,068.65 Q 283,074.61 Q 98,011.54 Q 1,078,154.81 40.83
Q 1,773,087.09 Q 741,813.75 Q 125,499.15 Q 2,640,400.00 100.00
Q/m2 Q 767.19 Q 673.20 Q 75,548.56 Q 38,494.48 Q 115,483.43 Q 17,322.52 Q 13,858.01 Q 34,645.03 Q 13,858.01 Q 115.48 Q 195,282.49 Q 39,056.50
conc 3000 conc 5000 hierro amat formaleta m2 formaleta ext formaleta int
Q 225.00 Q 225.00 300 long h areas long h areas
Q 685.00 Q 805.00 0.65 0.85 0.55 0.30 0.85 0.26 decan 52.45
Q 910.00 Q 1,030.00 2.25 1.15 2.59 2.10 1.15 2.42 canal 3.5675
1.00 2.15 2.15 0.3 1.15 0.35 reactor 238.08
formaleta interna 6.15 3.65 22.45 7.24 2.15 15.57 digestor 59.1775
lado altura 11.80 3.65 43.07 2.44 2.15 5.25 patio 78.3625
4.8 3 7.40 3.65 27.01 1.22 3.65 4.45 decant sec 37.385
4.8 3 3.30 3.65 12.05 48.00 3.5 168.00
1.22 2.56 3.35 1.65 5.53 7.24 3.5 25.34
1.22 2.56 5.20 1.5 7.80 13.10 3.5 45.85
75.7 3.35 1.65 5.53 3.2 1.65 5.28
13.80 3.65 50.37 6.7 1.65 11.06
1.00 0.85 0.85 3.2 1.65 5.28
179.94 286.07
total 466.01
GRAN TOTAL
Q 35,150,847.62
Q 234,338.98
No. ACTIVIDAD A DESARROLLAR MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
Estudio del área disponible y adecuación de las
0
unidades a construir
7
Aplicación de impermeabilizantes y selladores.
CRONOGRAMA DE EJECUCION
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES INDUSTRIALES
No. CONCEPTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
1 TRABAJOS PRELIMINARES
1.1 Rediseño y programación
1.2 Construir Guardianía
2 NIVELACION Y TRAZO
2.1 Nivelación
3 ESTABILIZACION ESTRATIGRAFICA
3.1 Estabilización del area estructural
4 CANAL DE REJAS,
4.1 Muros
4.2 Piso
4.3 Instalaciones Especiales
5 DECANTADOR INICIAL
5.1 Muros
5.2 Pantalla Deflectiva
5.3 Piso
5.4 Instalaciones Especiales
6 REACTOR AEROBIO
6.1 Muros
6.2 Pantalla
6.3 Piso
6.4 Cimiento
6.5 Instalaciones Especiales
7 DECANTADOR SECUNDARIO
7.1 Muros
7.2 Pantalla Deflectiva
7.3 Piso
7.4 Instalaciones Especiales
8 DIGESTOR
8.1 Muros
8.2 Losa
8.3 Piso
8.4 Instalaciones Especiales
9 PATIOS DE SECADO
9.1 Muros
9.2 Piso
9.3 Cimiento
9.4 Instalaciones Especiales
10 ADMINISTRACION
10.1 Personal Permanente
11 PUESTA EN MARCHA DE LA PLANTA
11.1 Periodo de Maduracion
11.2 Capacitación de personal de mantenimiento
No.
10
11
No.
10
11
FLUJOGRAMA SOBRE EJECUCION DE ACTIVIDADES
CONCEPTO MES 1 MES 2 MES 3
DIGESTOR
PATIOS DE SECADO
ADMINISTRACION Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84
FLUJO SEMANAL DE GASTOS Q 36,309.76 Q 51,532.39 Q 70,810.77 Q 73,492.31 Q 73,492.31 Q 119,320.55 Q 396,547.17 Q 330,896.71 Q 330,896.71 Q 285,068.46 Q 321,731.06 Q 44,504.44
PUESTA EN MARCHA DE LA PLANTA Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 28,380.01
FLUJO MENSUAL DE GASTOS Q 81,546.52 Q 81,546.52 Q 107,011.77 Q 70,349.18 Q 73,896.68 Q 36,854.59 Q 36,854.59 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 2,640,400.00