CONCRETO MUROS - total

pared lateral L H grosor vol


1 3.45 1.2 0.2 0.828 2.01
2 1.95 1.2 0.15 0.351
3 0.7 0.3 0.15 0.0315
pared frontal L H grosor vol
1 0.95 1.95 0.2 0.3705 CONCRETO
1.5 0.2 0.2 0.06 2.57 m³
2 0.85 0.95 0.15 0.121125
3 1.4 0.7 0.15 0.147
4 1 0.7 0.15 0.105
Piso L A grosor vol total
No. 1 1.15 1.4 0.2 0.322
No. 2 0.95 0.65 0.15 0.092625 0.55
No. 3 1.4 0.65 0.15 0.1365

REFUERZO MUROS - total 4.23 qq


pared lateral barras longitudes varillas quintales
1 2.2 18 39.6 8 0.62
4.25 20 85 16 1.23
2 2.2 10 22 4 0.31
2.75 10 27.5 5 0.38
3 1.45 4 5.8 1 0.08
1.25 4 5 1 0.08
pared frontal barras longitudes varillas 2.69
1 2.75 7 19.25 4 0.31
1.75 20 35 7 0.54
2 1.7 5 8.5 2 0.15
1.15 5 5.75 1 0.08
3 1.15 9 10.35 2 0.15
1.7 4 6.8 1 0.08
4 1.45 6 8.7 2 0.15
1.3 4 5.2 1 0.08
284.45 1.54
REFUERZO piso total 0.77 qq
piso barras longitudes varillas
1 2.2 5 11 2 0.15
1.75 8 14 3 0.23
2 1.25 13 16.25 3 0.23
3.2 3 9.6 2 0.15
50.85 10 0.77
2 manos
area de piso 1.65 3.795
INSTALACIONES Y ACCESORIOS ESPECIALES
concepto cantidad q/unitario total
canasta de solidos 1 Q 500.00 Q 500.00
vertedero triangular 1 Q 500.00 Q 500.00
rejilla 1 Q 1,000.00 Q 1,000.00
tubo pvc Ø6" 100psi 1 Q 650.00 Q 650.00
codo 90° Ø6" 3 Q 1,066.00 Q 3,198.00
Bomba de agitación ¼ HP 2 Q -
Bomba de expulsión ¼ HP 2 Q -
tubo pvc Ø2" 2 Q 130.00 Q 260.00
codo 90° Ø2" 4 Q 20.00 Q 80.00
dosificador 2 Q -
tubo CPVC dosific 2 Q 90.00 Q 180.00
bypass subterraneo Q -
tee sanit 1 Q 1,500.00 Q 1,500.00
codo 90° Ø6" 1 Q 1,066.00 Q 1,066.00
tubo pvc Ø6" 1 Q 650.00 Q 650.00
Valvulas Ø6"de compuerta 2 Q 2,000.00 Q 4,000.00

formaleta ext formaleta int


long h areas long h
0.65 0.85 0.55 0.30 0.85
2.25 1.15 2.59 2.10 1.15
1.00 2.15 2.15 0.3 1.15
6.15 3.65 22.45 7.24 2.15
11.80 3.65 43.07 2.44 2.15
7.40 3.65 27.01 1.22 3.65
3.30 3.65 12.05 48.00 3.5
3.35 1.65 5.53 7.24 3.5
5.20 1.5 7.80 13.10 3.5
3.35 1.65 5.53 3.2 1.65
13.80 3.65 50.37 6.7 1.65
1.00 0.85 0.85 3.2 1.65
179.94
total 466.01
ormaleta int
areas
0.26 decan 52.45
2.42 canal 3.5675
0.35 reactor 238.08
15.57 digestor 59.1775
5.25 patio 78.3625
4.45 decant sec 37.385
168.00
25.34
45.85
5.28
11.06
5.28
286.07
CONCRETO MUROS - total
pared lateral L H grosor vol
1 1.25 2.55 0.2 0.6375 5.49
2 0 0 0.15 0
3 0 0 0.15 0
pared frontal L H grosor vol
1 2.55 6.2 0.2 3.162 CONCRETO
2.6 0.9 0.2 0.468 6.59 m³
pared de bomba
1 1.1 0.2 0.22
1.25 4 0.2 1
Piso L A grosor vol total
No. 1 1.9 2.5 0.2 0.95
No. 2 0.6 1.25 0.2 0.15 1.10

pantalla L A grosor vol total


1.9 1.22 0.15 0.3477 0.35

formaleta LxA 4.636 2.318 REFUERZO


REFUERZO pantalla deflectiva total 0.77 qq
No. 3 barras longitudes varillas quintales
1 1.22 23.75 28.975 6 0.46
1.9 10.1667 19.3166667 4 0.31
48.29 0.77
REFUERZO muros
pared No. 3 barras longitudes varillas quintales
13 29.1667 379.166667 73 5.62 0.77 qq
3.5 65 227.5 44 6.29
606.666667 11.90
REFUERZO piso total 7.57 qq
piso No. 4 barras longitudes varillas
1 7.5 34.6667 260 50 7.14
2 2 8.13333 16.2666667 3 0.43
276.266667 7.57 REFUERZO #4
7.57 qq
2 manos
area de piso 5.9 13.57
INSTALACIONES Y ACCESORIOS ESPECIALES
concepto cantidad q/unitario total
Placas de fibrolit 1 cm 30 Q 250.00 Q 7,500.00
Bomba de expulsión ¼ HP 0 Q -
tubo pvc Ø2" 6 Q 130.00 Q 780.00
codo 90° Ø2" 8 Q 20.00 Q 160.00
valvulas de comp de Ø2" 2 Q 100.00 Q 200.00

formaleta ext formaleta int


long h areas long h areas
0.65 0.85 0.55 0.30 0.85 0.26
2.25 1.15 2.59 2.10 1.15 2.42
1.00 2.15 2.15 0.3 1.15 0.35
6.15 3.65 22.45 7.24 2.15 15.57
11.80 3.65 43.07 2.44 2.15 5.25
7.40 3.65 27.01 1.22 3.65 4.45
3.30 3.65 12.05 48.00 3.5 168.00
3.35 1.65 5.53 7.24 3.5 25.34
5.20 1.5 7.80 13.10 3.5 45.85
3.35 1.65 5.53 3.2 1.65 5.28
13.80 3.65 50.37 6.7 1.65 11.06
1.00 0.85 0.85 3.2 1.65 5.28
179.94 286.07
total 466.01
decan 52.45
canal 3.5675
reactor 238.08
digestor 59.1775
patio 78.3625
decant sec 37.385
CONCRETO MUROS - total
pared lateral L H grosor vol
1 7.4 3.5 0.2 5.18 24.92
2 7.4 3.5 0.2 5.18
10.36
pared frontal L H grosor vol
1 10.4 3.5 0.2 7.28
2 10.4 3.5 0.2 7.28
14.56

Piso L A grosor vol


No. 1 10.4 7.4 0.2 15.392 total
No. 2 1.1 7.4 0.1 0.814
16.206 16.21
pantalla L A grosor vol
3 7 3.3 0.2 4.62 total
4.62
cimiento L H grosor vol
1 35.6 1.5 0.2 10.68 total
10.68
formaleta LxA
muros 124.6
pantalla 23.1

REFUERZOS total REFUERZO


pared frontal No. 4 barras longitudes varillas quintales 54.29
1 10.4 29.1667 1213.33333 233 33.29 1977.5
2 3.5 57.7778 404.444444 78 11.14
pared lateral No. 4 1617.77778 44.43
1 7.4 29.1667 215.833333 41 5.86
2 3.5 41.1111 143.888889 28 4.00
359.722222 9.86
pantalla No. 3
3 7.4 50 370 71 5.46
4 3.5 148 518 99 7.62
888 13.08 54.29

2.7 12 32.4 6 0.86


cimiento 5763.4 135.58
No. 4 barras longitudes varillas quintales
5 48 240 46 6.57
1.5 533.333 800 153 21.86
1040 28.43 42.86

REFUERZO piso total


piso No. 4 barras longitudes varillas
1 7.5 104 780 150 21.43 REFUERZO
2 10.4 75 780 150 21.43 42.86
1560 42.86
2 manos
area de piso 76.96 177.008
INSTALACIONES Y ACCESORIOS ESPECIALES
concepto cantidad q/unitario total

Aireadores 2 Q200,000.00 Q 400,000.00


tubo pvc Ø2" 150 Q 130.00 Q 19,500.00
codo 90° Ø2" 100 Q 20.00 Q 2,000.00
valvulas de comp de Ø2" 10 Q 100.00 Q 1,000.00

200

formaleta ext formaleta int


long h areas long
0.65 0.85 0.55 0.30
qq 2.25 1.15 2.59 2.10
mts 1.00 2.15 2.15 0.3
6.15 3.65 22.45 7.24
11.80 3.65 43.07 2.44
7.40 3.65 27.01 1.22
3.30 3.65 12.05 48.00
3.35 1.65 5.53 7.24
5.20 1.5 7.80 13.10
3.35 1.65 5.53 3.2
13.80 3.65 50.37 6.7
qq 1.00 0.85 0.85 3.2
179.94
total 466.01

qq

#4
qq
total
#VALUE!
ALES

formaleta int
h areas
0.85 0.26 decan 52.45
1.15 2.42 canal 3.5675
1.15 0.35 reactor 238.08
2.15 15.57 digestor 59.1775
2.15 5.25 patio 78.3625
3.65 4.45 decant sec 37.385
3.5 168.00
3.5 25.34
3.5 45.85
1.65 5.28
1.65 11.06
1.65 5.28
286.07
CONCRETO MUROS - total
pared lateral L H grosor vol
1 1.25 2.55 0.2 0.6375 5.49
2 0 0 0.15 0
3 0 0 0.15 0
pared frontal L H grosor vol
1 2.55 6.2 0.2 3.162 CONCRETO
2.6 0.9 0.2 0.468 6.59 m³
pared de bomba
1 1.1 0.2 0.22
1.25 4 0.2 1
Piso L A grosor vol total
No. 1 1.9 2.5 0.2 0.95
No. 2 0.6 1.25 0.2 0.15 1.10

pantalla L A grosor vol total


1.9 1.22 0.15 0.3477 0.35

formaleta LxA 4.636 2.318 REFUERZO


REFUERZO pantalla deflectiva total 0.77 qq
No. 3 barras longitudes varillas quintales
1 1.22 23.75 28.975 6 0.46
1.9 10.1667 19.3166667 4 0.31
48.29 0.77
REFUERZO muros
pared No. 3 barras longitudes varillas quintales
13 29.1667 379.166667 73 5.62 0.77 qq
3.5 65 227.5 44 6.29
606.666667 11.90
REFUERZO piso total 7.57 qq
piso No. 4 barras longitudes varillas
1 7.5 34.6667 260 50 7.14
2 2 8.13333 16.2666667 3 0.43
276.266667 7.57 REFUERZO #4
7.57 qq
2 manos
area de piso 5.9 13.57
INSTALACIONES Y ACCESORIOS ESPECIALES
concepto cantidad q/unitario total
Placas de fibrolit 1 cm 30 Q 250.00 Q 7,500.00
Bomba de expulsión ¼ HP 2 Q -
tubo pvc Ø2" 6 Q 130.00 Q 780.00
codo 90° Ø2" 8 Q 20.00 Q 160.00
valvulas de comp de Ø2" 2 Q 100.00 Q 200.00

formaleta ext formaleta int


long h areas long h areas
0.65 0.85 0.55 0.30 0.85 0.26
2.25 1.15 2.59 2.10 1.15 2.42
1.00 2.15 2.15 0.3 1.15 0.35
6.15 3.65 22.45 7.24 2.15 15.57
11.80 3.65 43.07 2.44 2.15 5.25
7.40 3.65 27.01 1.22 3.65 4.45
3.30 3.65 12.05 48.00 3.5 168.00
3.35 1.65 5.53 7.24 3.5 25.34
5.20 1.5 7.80 13.10 3.5 45.85
3.35 1.65 5.53 3.2 1.65 5.28
13.80 3.65 50.37 6.7 1.65 11.06
1.00 0.85 0.85 3.2 1.65 5.28
179.94 286.07
total 466.01
decan 52.45
canal 3.5675
reactor 238.08
digestor 59.1775
patio 78.3625
decant sec 37.385
Concreto Muros total
area plan 2.78 13.087
h 3.3

vol 9.174 M³ 8.911

Concreto Piso
area plan 11.18
h 0.2
vol 2.236 M³

Concreto LOSA
area plan 11.18
h 0.15
vol 1.677 M³

REFUEZO LOSA
No.6 barras longitudes varillas quintales
lado 1 2 13.3333 26.6666667 5 1.66666667
lado 2 5.1 34 173.4 33 11
espac 0.15 200.066667 38 12.6666667

REFUEZO piso
No.4 barras longitudes varillas
lado 1 2 13.3333 26.6666667 5 0.71428571
lado 2 5.1 28.3333 144.5 28 4
espac 0.15 171.166667 33 4.71428571
espac 0.18 total
34.6336996
REFUEZO MUROS -largos
No.3 barras longitudes varillas
lado 1 4.95 41.25 204.1875 39 3
alto 1 5.1 56.6667 289 55 4.23076923
493.1875 94 7.23076923 total
No.4 barras longitudes varillas
alto var a 3.5 17 119 23 3.28571429 13.9450549
alto var b 3 16 96 18 2.57142857
alto var c 1.3 12 31.2 6 0.85714286
246.2 47 6.71428571
espac 0.24
espac 0.18

REFUEZO MUROS -cortos


No.3 barras longitudes varillas
lado 1 1.75 7.29167 12.7604167 2 0.15384615
alto 1 5.1 28.3333 144.5 28 2.15384615
por dos lados 30 2.30769231
No.4 barras longitudes varillas
alto var a 3.5 4 14 3 0.42857143
alto var b 3 6 18 3 0.42857143
alto var c 1.3 6 7.8 1 0.14285714
por dos lados 7 1
espac 0.24
espac 0.18
formaleta ext formaleta int
long h areas long h
0.65 0.85 0.55 0.30 0.85
2.25 1.15 2.59 2.10 1.15
1.00 2.15 2.15 0.3 1.15
6.15 3.65 22.45 7.24 2.15
11.80 3.65 43.07 2.44 2.15
7.40 3.65 27.01 1.22 3.65
3.30 3.65 12.05 48.00 3.5
3.35 1.65 5.53 7.24 3.5
5.20 1.5 7.80 13.10 3.5
3.35 1.65 5.53 3.2 1.65
13.80 3.65 50.37 6.7 1.65
1.00 0.85 0.85 3.2 1.65
179.94
total 466.01

INSTALACIONES Y ACCESORIOS ESPECIALES


concepto cantidad q/unitario total

Bomba de expulsión ¼ HP 2 Q -
tubo pvc Ø2" 6 Q 130.00 Q 780.00
codo 90° Ø2" 8 Q 20.00 Q 160.00
valvulas de comp de Ø2" 2 Q 100.00 Q 200.00
ormaleta int
areas
0.26 decan 52.45
2.42 canal 3.5675
0.35 reactor 238.08
15.57 digestor 59.1775
5.25 patio 78.3625
4.45 decant sec 37.385
168.00
25.34
45.85
5.28
11.06
5.28
286.07
Concreto Muros
area MURO SUR 7.9
grosor 0.2
vol 1.58 total
area Muros later 4.1769 7.2769
grosor 1.52
vol 5.6969

Concreto cimentac
area planta 10.5524
h 0.15
vol 1.58286 M³

Concreto PISO
area planta 11.18
h 0.15
vol 1.677 M³

REFUEZO cimiento
No.4 barras longitudes varillas quintales
lado 1 2 13.3333333 26.6666667 5 0.71428571
lado 2 5.1 34 173.4 33 4.71428571
espac 0.15 200.066667 5.42857143

REFUEZO piso
No.4 barras longitudes varillas quintales
lado 1 2 13.3333333 26.6666667 5 0.71428571
lado 2 5.1 28.3333333 144.5 28 4
espac 0.15 171.166667 4.71428571
espac 0.18

REFUEZO MUROS -dos lados-


No.4 barras longitudes varillas quintales
lado 1 1.67 34.6666667 115.786667 22 4 0.57142857
alto 1 1.65 74 244.2 47 3.61538462
359.98666667 7.61538462
barras longitudes varillas quintales total
16.5934066
No.3 quintales
alto 1 5.2 74 384.8 74 5.69230769
lado 1 11.1 11 122.1 23 3.28571429
506.9 8.97802198
INSTALACIONES Y ACCESORIOS ESPECIALES
concepto cantidad q/unitario total
Relleno de piedrín 1/2 2.55 Q 175.00
Relleno de piedrín 3/4 2.55 Q 175.00
Relleno de arena 3.4 Q 150.00
piso de ladrillo tayuyo 17 Q 100.00
tubo PVC de Ø 8" 3 Q 1,300.00
tubo pvc Ø2" 2 Q 130.00
codo 90° Ø2" 8 Q 20.00
valvulas de comp de Ø2" 2 Q 100.00

formaleta ext formaleta int


long h areas long h areas
0.65 0.85 0.55 0.30 0.85 0.26 decan
2.25 1.15 2.59 2.10 1.15 2.42 canal
1.00 2.15 2.15 0.3 1.15 0.35 reactor
6.15 3.65 22.45 7.24 2.15 15.57 digestor
11.80 3.65 43.07 2.44 2.15 5.25 patio
7.40 3.65 27.01 1.22 3.65 4.45 decant sec
3.30 3.65 12.05 48.00 3.5 168.00
3.35 1.65 5.53 7.24 3.5 25.34
5.20 1.5 7.80 13.10 3.5 45.85
3.35 1.65 5.53 3.2 1.65 5.28
13.80 3.65 50.37 6.7 1.65 11.06
1.00 0.85 0.85 3.2 1.65 5.28
179.94 286.07
total 466.01
52.45
3.5675
238.08
59.1775
78.3625
37.385
PRESUPUESTO DETALLADO DE GASTO
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES IN

No. Renglón Cant. Unid. Materiales


Locales
1 TRABAJOS PRELIMINARES
1.1 Rediseño y programación 8 dias
Verificación del area real a usar 1 dias Q -
Adecuación de unidades en area 2 dias Q -
Chequeo del diseño hidraulico 2 dias Q -
Planificación final remodelada 3 dias Q 500.00
sub-total
1.2 Construir Guardianía 21 mts.²
madera: 9 paral 3x3x10 67.5 P-tabla Q 4.00
7 " 3x3x7 37 P-tabla Q 4.00
6 cost. 2x3x10 30 P-tabla Q 4.00
18 " 2x3x8 72 P-tabla Q 4.00
7 " 2x3x12 42 P-tabla Q 4.00
12 2x2x8 32 P-tabla Q 4.00
Paraleado vertical 50 mts.²
Enlaminado techo 50 mts.²
Enlaminado vertical 77 mts.²
lámina de 10 3 Unid. Q 100.00
de 12 12 Unid. Q 120.00
de 8 18 Unid. Q 80.00
de 7 7 Unid. Q 70.00
clavo 14 libras Q 5.00
sub-total

2.0 NIVELACION Y TRAZO


2.1 Nivelación 128.00 mts.²
excavacion con retro 65.60 mts.³ Q 280.00
acarreo de tierra sobrante 85.28 mts.³ Q 40.00
Trazo 140.00 ML Q 1.95
madera 70.00 P-tabla Q 4.00
clavo 3.50 libras Q 5.00
sub-total
3.0 ESTABILIZACION ESTRATIGRAFICA
3.1 ESTABILIZACION DEL AREA
Colocación de geomalla 128.00 mts.² Q 120.00
Colocación de suelo cemento 83.20 mts.³ Q -
compactacion con bailarina 160.00 mts.² Q 10.00
Alquiler de bomba riego 6.00 dias Q 200.00
Material selecto para suelo 83.20 mts.³ Q 40.00
cemento para suelo 24.00 sacos Q 40.00
Chequeo laboratorio 3.00 prueba Q 1,000.00
sub-total
4.0 CANAL DE REJAS,
4.1 MUROS
armaduria 284.45 ML Q -
Refuerzo No. 3 4.23 qq Q 250.00
Alambre de amarre 17.00 lbs Q 5.00
Formaleta 238.08 mts.² Q 160.00
fundicion 2.57 mts.³ Q 1,000.00
quitar formaleta 4.23 mts.² Q -
Colocar Recubrimiento protector 34.00 mts.² Q 150.00
sub-total
4.2 PISO
armaduria 50.85 ML Q -
Refuerzo No. 3 0.77 qq Q 250.00
Alambre de amarre 3.00 lbs Q 5.00
fundicion 0.00 mts.³ Q 1,000.00
Colocar Recubrimiento protector 3.80 mts.² Q 150.00
sub-total
4.3 INSTALACIONES ESPECIALES
canasta de solidos 1 unidad Q 500.00
vertedero triangular 1 unidad Q 500.00
rejilla 1 unidad Q 1,000.00
tubo pvc Ø6" 100psi 1 tubo Q 650.00
codo 90° Ø6" 3 unidad Q 1,066.00
Bomba de agitación ¼ HP 2 unidad Q 20,000.00
Bomba de expulsión ¼ HP 2 unidad Q 20,000.00
tubo pvc Ø2" 2 tubo Q 130.00
codo 90° Ø2" 4 unidad Q 20.00
dosificador 2 unidad
tubo CPVC dosific 3 tubo Q 90.00
INSTALACIONES electricas 1 global Q 4,000.00
bypass subterraneo
tee sanit 1 unidad Q 1,500.00
codo 90° Ø6" 1 unidad Q 1,066.00
tubo pvc Ø6" 1 tubo Q 650.00
sub-total
5.0 DECANTADOR INICIAL
5.1 MUROS
armaduria N3 379.17 ML Q -
armaduria N4 227.50 ML Q -
Refuerzo No. 3 y 4 11.90 qq Q 250.00
Alambre de amarre 48.00 lbs Q 5.00
Formaleta 52.45 mts.² Q 160.00
fundicion 5.49 mts.³ Q 1,000.00
quitar formaleta 11.90 mts.² Q -
Colocar Recubrimiento protector 104.90 mts.² Q 150.00
sub-total
5.2 PANTALLA
armaduria N3 48.29 ML Q -
Refuerzo No. 3 0.77 qq Q 250.00
Alambre de amarre 3.00 lbs Q 5.00
Formaleta 4.64 mts.² Q 160.00
fundicion 0.35 mts.³ Q 1,000.00
quitar formaleta 0.77 mts.² Q -
Colocar Recubrimiento protector 9.27 mts.² Q 150.00
sub-total
5.3 PISO
armaduria 276.267 ML Q -
Refuerzo No. 4 7.57 qq Q 250.00
Alambre de amarre 30.00 lbs Q 5.00
fundicion 1.10 mts.³ Q 1,000.00
sub-total
5.4 INSTALACIONES ESPECIALES
Placas de fibrolit 1 cm 30 unidad Q 250.00
Bomba de expulsión ¼ HP 2 unidad Q 20,000.00
tubo pvc Ø2" 6 tubo Q 130.00
codo 90° Ø2" 8 unidad Q 20.00
valvulas de comp de Ø2" 2 unidad Q 100.00
INSTALACIONES electricas 1 global Q 4,000.00
sub-total
6.0 REACTOR AEROBIO
6.1 MUROS
armaduria N4 1977.50 ML Q -
Refuerzo No. 4 54.29 qq Q 250.00
Formaleta 124.60 mts.² Q 160.00
fundicion 24.92 mts.³ Q 1,000.00
quitar formaleta 124.60 mts.² Q -
Colocar Recubrimiento protector 249.20 mts.² Q 150.00
sub-total
6.2 PANTALLA
armaduria N3 888.00 ML Q -
Refuerzo No. 3 13.08 qq Q 250.00
Alambre de amarre 52.00 lbs Q 5.00
Formaleta 23.10 mts.² Q 160.00
fundicion 4.62 mts.³ Q 1,000.00
quitar formaleta 23.10 mts.² Q -
Colocar Recubrimiento protector 46.20 mts.² Q 150.00
sub-total
6.3 PISO
armaduria 1560 ML Q -
Refuerzo No. 4 42.86 qq Q 250.00
Alambre de amarre 171.00 lbs Q 5.00
fundicion 16.21 mts.³ Q 1,000.00
sub-total
6.4 CIMIENTO
armaduria 1040 ML Q -
Refuerzo No. 4 28.43 qq Q 250.00
Alambre de amarre 114.00 lbs Q 5.00
fundicion 10.68 mts.³ Q 1,000.00
sub-total
6.5 INSTALACIONES ESPECIALES
Aireadores 2 unidad Q 200,000.00
tubo pvc Ø2" 150 tubo Q 130.00
codo 90° Ø2" 100 unidad Q 20.00
valvulas de comp de Ø2" 10 unidad Q 100.00
INSTALACIONES electricas 1 global Q 5,000.00
sub-total
7 DECANTADOR SECUNDARIO
7.1 MUROS
armaduria N3 379.167 ML Q -
armaduria N4 227.5 ML Q -
Refuerzo No. 3 y 4 11.9011 qq Q 250.00
Alambre de amarre 48 lbs Q 5.00
Formaleta 52.45 mts.² Q 160.00
fundicion 5.4875 mts.³ Q 1,000.00
quitar formaleta 11.9011 mts.² Q -
Colocar Recubrimiento protector 104.9 mts.² Q 150.00
sub-total
7.2 PANTALLA
armaduria N3 48.2917 ML Q -
Refuerzo No. 3 0.76923 qq Q 250.00
Alambre de amarre 3 lbs Q 5.00
Formaleta 4.636 mts.² Q 160.00
fundicion 0.3477 mts.³ Q 1,000.00
quitar formaleta 0.76923 mts.² Q -
Colocar Recubrimiento protector 9.272 mts.² Q 150.00
sub-total
7.3 PISO
armaduria 276.267 ML Q -
Refuerzo No. 4 7.57143 qq Q 250.00
Alambre de amarre 30 lbs Q 5.00
fundicion 1.1 mts.³ Q 1,000.00
sub-total
7.4 INSTALACIONES ESPECIALES
Placas de fibrolit 1 cm 30 unidad Q 250.00
Bomba de expulsión ¼ HP 2 unidad Q 20,000.00
tubo pvc Ø2" 6 tubo Q 130.00
codo 90° Ø2" 8 unidad Q 20.00
valvulas de comp de Ø2" 2 unidad Q 100.00
INSTALACIONES electricas 1 global Q 4,000.00
sub-total
8.0 DIGESTOR
8.1 MUROS
armaduria N3 493.19 ML Q -
armaduria N4 246.20 ML Q -
Refuerzo No. 3 y 4 13.95 qq Q 250.00
Alambre de amarre 56.00 lbs Q 5.00
Formaleta 51.38 mts.² Q 160.00
fundicion 9.17 mts.³ Q 1,000.00
quitar formaleta 13.95 mts.² Q -
Colocar Recubrimiento protector 102.76 mts.² Q 150.00
sub-total
8.2 LOSA
armaduria N 6 200.07 ML Q -
Refuerzo No. 6 12.67 qq Q 250.00
Alambre de amarre 51.00 lbs Q 5.00
Formaleta 7.80 mts.² Q 160.00
fundicion 1.68 mts.³ Q 1,000.00
quitar formaleta 12.67 mts.² Q -
Colocar Recubrimiento protector 15.60 mts.² Q 150.00
sub-total
8.3 PISO
armaduria 171.167 ML Q -
Refuerzo No. 4 4.71 qq Q 250.00
Alambre de amarre 19.00 lbs Q 5.00
fundicion 2.24 mts.³ Q 1,000.00
sub-total
8.4 INSTALACIONES ESPECIALES
Bomba de expulsión ¼ HP 2 unidad Q 20,000.00
tubo pvc Ø2" 6 tubo Q 130.00
codo 90° Ø2" 8 unidad Q 20.00
valvulas de comp de Ø2" 2 unidad Q 100.00
INSTALACIONES electricas 1 global Q 4,000.00
sub-total
9.0 PATIOS DE SECADO
9.1 MUROS
armaduria N4 359.99 ML Q -
armaduria N3 506.90 ML Q -
Refuerzo No. 4 16.59 qq Q 250.00
Formaleta 78.36 mts.² Q 160.00
fundicion 7.28 mts.³ Q 1,000.00
quitar formaleta 78.36 mts.² Q -
Colocar Recubrimiento protector 156.73 mts.² Q 150.00
sub-total
9.2 PISO
armaduria 171.167 ML Q -
Refuerzo No. 4 4.71 qq Q 250.00
Alambre de amarre 19.00 lbs Q 5.00
fundicion 1.68 mts.³ Q 1,000.00
sub-total
9.3 CIMIENTO
armaduria 200.067 ML Q -
Refuerzo No. 4 5.43 qq Q 250.00
Alambre de amarre 22.00 lbs Q 5.00
fundicion 1.58 mts.³ Q 1,000.00
sub-total
9.4 INSTALACIONES ESPECIALES
Relleno de piedrín 1/2 3 mts.³ Q 175.00
Relleno de piedrín 3/4 3 mts.³ Q 175.00
Relleno de arena 4 mts.³ Q 150.00
piso de ladrillo tayuyo 17 mts.² Q 100.00
tubo PVC de Ø 8" 3 unidad Q 1,300.00
tubo pvc Ø2" 2 unidad Q 130.00
codo 90° Ø2" 8 unidad Q 20.00
valvulas de comp de Ø2" 2 unidad Q 100.00
INSTALACIONES electricas 1 global Q 3,000.00
sub-total
10.0 ADMINISTRACION
10.1 PERSONAL FIJO
Ingeniero residente 140 dias Q -
Maestro de Obras 140 dias Q -
Bodeguero 140 dias Q -
2 ayudantes 140 dias Q -
sub-total
11.0 PUESTA EN MARCHA
11.1 Periodo de Maduracion 60 dias Q -
11.2 Capacitación de personal de mantenimiento 20 dias Q -
sub-total
INVERSIONES WATERLOO, S.A.
DETALLADO DE GASTOS NETOS
NTO DE AGUAS RESIDUALES INDUSTRIALES

Materiales Mano de Obra Transporte TOTAL


Q Total Planilla x Trato Q Total
Q 18,055.76
Q 7,600.00
Q - ingeniero Q 500.00 Q 500.00 Q 100.00
Q - ingeniero Q 500.00 Q 1,000.00 Q 50.00
Q - ingeniero Q 1,000.00 Q 2,000.00 Q 50.00
Q 1,500.00 ing + dib Q 700.00 Q 2,100.00 Q 300.00
Q 1,500.00 Q 5,600.00 Q 500.00
Q 10,455.76
Q 270.00 Q 135.00
Q 148.00 Q 74.00
Q 120.00 Q 60.00
Q 288.00 Q 144.00
Q 168.00 Q 84.00
Q 128.00 Q 64.00
Q 20.00 Q 1,000.00
Q 20.00 Q 1,000.00
Q 20.00 Q 1,536.59
Q 300.00 Q 120.00
Q 1,440.00 Q 576.00
Q 1,440.00 Q 576.00
Q 490.00 Q 196.00
Q 70.13 Q 28.05
Q 4,862.13 Q 3,536.59 Q 2,057.05

Q 27,710.70
Q 27,710.70
Q 18,368.00 operador Q 40.00 Q 2,624.00 Q 1,750.00
Q 3,411.20 Q -
Q 273.00 M+2A+2Ay Q 6.00 Q 840.00 Q -
Q 280.00 Q - Q - Q 140.00
Q 17.50 Q - Q - Q 7.00
Q 22,349.70 Q 3,464.00 Q 1,897.00
Q 39,938.00
Q 39,938.00
Q 15,360.00 Instalador Q 25.00 Q 3,200.00 Q 1,750.00
Q - 10 Ay Q 75.00 Q 6,240.00 Q -
Q 1,600.00 operador Q 4.00 Q 640.00 Q 700.00
Q 1,200.00 operador Q 75.00 Q 450.00 Q 700.00
Q 3,328.00 Q - Q - Q -
Q 960.00 Q - Q - Q -
Q 3,000.00 laboratoris Q 120.00 Q 360.00 Q 450.00
Q 25,448.00 Q 10,890.00 Q 3,600.00
Q 166,555.06
Q 57,076.39
Q - armador Q 2.00 Q 568.90 Q 700.00
Q 1,057.69 Q 211.54
Q 85.00 Q - Q - Q 1,050.00
Q 38,092.80 3A+2ay Q 20.00 Q 4,761.60 Q 1,050.00
Q 2,565.25 contratista Q 20.00 Q 51.31 Q 1,400.00
Q - 3A+2ay Q 10.00 Q 42.31 Q -
Q 5,100.00 3A+2ay Q 10.00 Q 340.00 Q -
Q 46,900.74 Q 5,764.11 Q 4,411.54
Q 2,004.67
Q - armador Q 2.00 Q 101.70 Q -
Q 192.31 Q 38.46
Q 15.00 Q - Q - Q 1,050.00
Q - contratista Q 20.00 Q - Q -
Q 569.25 3A+2ay Q 10.00 Q 37.95 Q -
Q 776.56 Q 139.65 Q 1,088.46
Q 107,474.00
Q 500.00 Instalador Q 150.00 Q 150.00 Q 100.00
Q 500.00 Instalador Q 200.00 Q 200.00 Q 100.00
Q 1,000.00 Instalador Q 200.00 Q 200.00 Q 100.00
Q 650.00 fontanero Q 100.00 Q 100.00 Q 100.00
Q 3,198.00 fontanero Q 25.00 Q 75.00 Q -
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 260.00 fontanero Q 50.00 Q 100.00 Q 200.00
Q 80.00 fontanero Q 15.00 Q 60.00 Q -
Q - contratista Q - Q - Q -
Q 270.00 contratista Q 5.00 Q 15.00 Q -
Q 4,000.00 contratista Q 2,000.00 Q 2,000.00 Q -

Q 1,500.00 fontanero Q 50.00 Q 50.00 Q -


Q 1,066.00 fontanero Q 50.00 Q 50.00 Q -
Q 650.00 fontanero Q 100.00 Q 100.00 Q 100.00
Q 93,674.00 Q 11,100.00 Q 2,700.00
Q 109,791.72
Q 40,085.76
Q - armador Q 1.00 Q 379.17 Q -
Q - armador Q 2.00 Q 455.00 Q -
Q 2,975.27 proveedor Q 595.05
Q 240.00 Q - Q - Q 1,050.00
Q 8,392.00 A+ay Q 20.00 Q 1,049.00 Q 1,050.00
Q 5,487.50 contratista Q 20.00 Q 109.75 Q 1,400.00
Q - ayudantes Q 10.00 Q 119.01 Q -
Q 15,735.00 3A+2ay Q 10.00 Q 1,049.00 Q -
Q 32,829.77 . Q 3,160.93 Q 4,095.05
Q 6,474.41
Q - armador Q 1.00 Q 48.29 Q -
Q 192.31 proveedor Q 38.46
Q 15.00 Q - Q - Q 1,050.00
Q 741.76 A+ay Q 20.00 Q 92.72 Q 1,050.00
Q 347.70 contratista Q 20.00 Q 6.95 Q 1,400.00
Q - ayudantes Q 10.00 Q 7.69 Q -
Q 1,390.80 3A+2ay Q 10.00 Q 92.72 Q -
Q 2,687.57 . Q 248.38 Q 3,538.46
Q 5,145.96
Q - armador Q 2.00 Q 552.53 Q -
Q 1,892.86 Q 378.57
Q 150.00 Q - Q - Q 1,050.00
Q 1,100.00 contratista Q 20.00 Q 22.00 Q -
Q 3,142.86 Q 574.53 Q 1,428.57
Q 64,560.00
Q 7,500.00 Instalador Q 50.00 Q 1,500.00 Q 1,500.00
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 780.00 fontanero Q 50.00 Q 300.00 Q 600.00
Q 160.00 fontanero Q 15.00 Q 120.00 Q -
Q 200.00 fontanero Q 150.00 Q 300.00 Q -
Q 4,000.00 fontanero Q 2,500.00 Q 2,500.00 Q 100.00
Q 52,640.00 Q 8,720.00 Q 3,200.00
Q 830,967.38
Q 111,655.11
Q - armador Q 2.00 Q 3,955.00 Q -
Q 13,571.43 proveedor Q 2,714.29
Q 19,936.00 A+ay Q 20.00 Q 2,492.00 Q 1,050.00
Q 24,920.00 contratista Q 20.00 Q 498.40 Q 1,400.00
Q - ayudantes Q 10.00 Q 1,246.00 Q -
Q 37,380.00 3A+2ay Q 10.00 Q 2,492.00 Q -
Q 95,807.43 . Q 10,683.40 Q 5,164.29
Q 25,064.48
Q - armador Q 1.00 Q 888.00 Q -
Q 3,269.23 proveedor Q 653.85
Q 260.00 Q - Q - Q 1,050.00
Q 3,696.00 A+ay Q 20.00 Q 462.00 Q 1,050.00
Q 4,620.00 contratista Q 20.00 Q 92.40 Q 1,400.00
Q - ayudantes Q 10.00 Q 231.00 Q -
Q 6,930.00 3A+2ay Q 10.00 Q 462.00 Q -
Q 18,775.23 . Q 2,135.40 Q 4,153.85
Q 34,412.26
Q - armador Q 2.00 Q 3,120.00 Q -
Q 10,714.29 Q 2,142.86
Q 855.00 Q - Q - Q 1,050.00
Q 16,206.00 contratista Q 20.00 Q 324.12 Q -
Q 27,775.29 Q 3,444.12 Q 3,192.86
Q 23,122.17
Q - armador Q 2.00 Q 2,080.00 Q -
Q 7,107.14 Q 1,421.43
Q 570.00 Q - Q - Q 1,050.00
Q 10,680.00 contratista Q 20.00 Q 213.60 Q -
Q 18,357.14 Q 2,293.60 Q 2,471.43
Q 684,900.00
Q 400,000.00 Instalador Q120,000.00 Q240,000.00 Q 2,000.00
Q 19,500.00 Instalador Q 50.00 Q 7,500.00 Q 1,800.00
Q 2,000.00 Instalador Q 15.00 Q 1,500.00 Q 500.00
Q 1,000.00 fontanero Q 50.00 Q 500.00 Q 100.00
Q 5,000.00 fontanero Q 2,500.00 Q 2,500.00 Q 1,000.00
Q 427,500.00 Q252,000.00 Q 5,400.00
Q 109,791.72
Q 40,085.76
Q - armador 1 Q 379.17 Q -
Q - armador 2 Q 455.00 Q -
Q 2,975.27 proveedor Q 595.05
Q 240.00 0 Q - Q 1,050.00
Q 8,392.00 A+ay 20 Q 1,049.00 Q 1,050.00
Q 5,487.50 contratista 20 Q 109.75 Q 1,400.00
Q - ayudantes 10 Q 119.01 Q -
Q 15,735.00 3A+2ay 10 Q 1,049.00 Q -
Q 32,829.77 . Q 3,160.93 Q 4,095.05
Q 6,474.41
Q - armador 1 Q 48.29 Q -
Q 192.31 proveedor Q 38.46
Q 15.00 0 Q - Q 1,050.00
Q 741.76 A+ay 20 Q 92.72 Q 1,050.00
Q 347.70 contratista 20 Q 6.95 Q 1,400.00
Q - ayudantes 10 Q 7.69 Q -
Q 1,390.80 3A+2ay 10 Q 92.72 Q -
Q 2,687.57 . Q 248.38 Q 3,538.46
Q 5,145.96
Q - armador 2 Q 552.53 Q -
Q 1,892.86 Q 378.57
Q 150.00 0 Q - Q 1,050.00
Q 1,100.00 contratista 20 Q 22.00 Q -
Q 3,142.86 Q 574.53 Q 1,428.57
Q 64,560.00
Q 7,500.00 Instalador Q 50.00 Q 1,500.00 Q 1,500.00
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 780.00 fontanero Q 50.00 Q 300.00 Q 600.00
Q 160.00 fontanero Q 15.00 Q 120.00 Q -
Q 200.00 fontanero Q 150.00 Q 300.00 Q -
Q 4,000.00 fontanero 2500 Q 2,500.00 Q 100.00
Q 52,640.00 Q 8,720.00 Q 3,200.00
Q 103,377.12
Q 44,134.78
Q - armador Q 1.00 Q 493.19 Q -
Q - armador Q 2.00 Q 492.40 Q -
Q 3,486.26 proveedor Q 697.25
Q 280.00 Q - Q - Q 1,050.00
Q 8,220.40 A+ay Q 20.00 Q 1,027.55 Q 1,050.00
Q 9,174.00 contratista Q 20.00 Q 183.48 Q 1,400.00
Q - ayudantes Q 10.00 Q 139.45 Q -
Q 15,413.25 3A+2ay Q 10.00 Q 1,027.55 Q -
Q 36,573.91 . Q 3,363.62 Q 4,197.25
Q 14,092.47
Q - armador Q 4.00 Q 800.27 Q -
Q 3,166.67 proveedor Q 633.33
Q 255.00 Q - Q - Q 1,050.00
Q 1,248.00 A+ay Q 20.00 Q 156.00 Q 1,050.00
Q 1,677.00 contratista Q 20.00 Q 33.54 Q 1,400.00
Q - ayudantes Q 10.00 Q 126.67 Q -
Q 2,340.00 3A+2ay Q 10.00 Q 156.00 Q -
Q 8,686.67 . Q 1,272.47 Q 4,133.33
Q 5,182.34
Q - armador Q 2.00 Q 342.33 Q -
Q 1,178.57 Q 235.71
Q 95.00 Q - Q - Q 1,050.00
Q 2,236.00 contratista Q 20.00 Q 44.72 Q -
Q 3,509.57 Q 387.05 Q 1,285.71
Q 54,060.00
Q 40,000.00 contratista Q 2,000.00 Q 4,000.00 Q 1,000.00
Q 780.00 fontanero Q 50.00 Q 300.00 Q 600.00
Q 160.00 fontanero Q 15.00 Q 120.00 Q -
Q 200.00 fontanero Q 150.00 Q 300.00 Q -
Q 4,000.00 fontanero Q 2,500.00 Q 2,500.00 Q 100.00
Q 45,140.00 Q 7,220.00 Q 1,700.00
Q 75,953.37
Q 56,042.21
Q - armador Q 2.00 Q 719.97 Q -
Q - armador Q 1.00 Q 506.90 Q -
Q 4,148.35 proveedor Q 829.67
Q 12,538.00 A+ay Q 20.00 Q 1,567.25 Q 1,050.00
Q 7,276.90 contratista Q 20.00 Q 145.54 Q 1,400.00
Q - ayudantes Q 10.00 Q 783.63 Q -
Q 23,508.75 3A+2ay Q 10.00 Q 1,567.25 Q -
Q 47,472.00 . Q 5,290.54 Q 3,279.67
Q 4,612.16
Q - armador Q 2.00 Q 342.33 Q -
Q 1,178.57 Q 235.71
Q 95.00 Q - Q - Q 1,050.00
Q 1,677.00 contratista Q 20.00 Q 33.54 Q -
Q 2,950.57 Q 375.87 Q 1,285.71
Q 4,803.22
Q - armador Q 2.00 Q 400.13 Q -
Q 1,357.14 Q 271.43
Q 110.00 Q - Q - Q 1,050.00
Q 1,582.86 contratista Q 20.00 Q 31.66 Q -
Q 3,050.00 Q 431.79 Q 1,321.43
Q 15,299.00
Q 525.00 ayudantes Q 30.00 Q 90.00 Q 15.00
Q 525.00 ayudantes Q 30.00 Q 90.00 Q 15.00
Q 600.00 ayudantes Q 30.00 Q 120.00 Q 20.00
Q 1,700.00 A+ay Q 50.00 Q 850.00 Q 85.00
Q 3,900.00 fontanero Q 75.00 Q 225.00 Q 15.00
Q 260.00 fontanero Q 50.00 Q 100.00 Q 24.00
Q 160.00 fontanero Q 15.00 Q 120.00 Q 40.00
Q 200.00 fontanero Q 50.00 Q 100.00 Q 20.00
Q 3,000.00 electrico Q 1,500.00 Q 1,500.00 Q 1,000.00
Q 10,870.00 Q 3,195.00 Q 1,234.00
Q 94,500.00
Q 94,500.00
Q - Q 300.00 Q 42,000.00 Q -
Q - Q 150.00 Q 21,000.00 Q -
Q - Q 125.00 Q 17,500.00 Q -
Q - Q 100.00 Q 14,000.00 Q -
Q - . Q 94,500.00 Q -
Q 18,000.00
Q - Q 200.00 Q 12,000.00 Q - Q 18,000.00
Q - Q 300.00 Q 6,000.00 Q -
Q - . Q 18,000.00 Q -
materiales

madera 4
cemento 40
kilometraje 70
formaleta 160

trazo
48.3
90.00
138.3

cambio $
7.8 20
son Q 156.00
sueldos
ingeniero 300
maestro 150
albañil 150
ayudante 100

rendim suelo Q/m3


5.55 66.83
Ing. JEOVANI MIRANDA C. Construcción y Supervisión
INTEGRACION DEL PRESUPUESTO

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES INDUSTRIALES

No. CONCEPTO Materiales Mano de Obra Transporte subtotales TOTAL


1 TRABAJOS PRELIMINARES Q 18,055.76
1.1 Rediseño y programación Q 1,500.00 Q 5,600.00 Q 500.00 Q 7,600.00
1.2 Construir Guardianía Q 4,862.13 Q 3,536.59 Q 2,057.05 Q 10,455.76
2 NIVELACION Y TRAZO Q 27,710.70
2.1 Nivelación Q 22,349.70 Q 3,464.00 Q 1,897.00 Q 27,710.70
3 ESTABILIZACION ESTRATIGRAFICA Q 39,938.00
3.1 ESTABILIZACION DEL AREA Q 25,448.00 Q 10,890.00 Q 3,600.00 Q 39,938.00
4 CANAL DE REJAS, Q 166,555.06
4.1 MUROS Q 46,900.74 Q 5,764.11 Q 4,411.54 Q 57,076.39
4.2 PISO Q 776.56 Q 139.65 Q 1,088.46 Q 2,004.67
4.3 INSTALACIONES ESPECIALES Q 93,674.00 Q 11,100.00 Q 2,700.00 Q 107,474.00
5 DECANTADOR INICIAL Q 109,791.72
5.1 MUROS Q 32,829.77 Q 3,160.93 Q 4,095.05 Q 40,085.76
5.2 PANTALLA Q 2,687.57 Q 248.38 Q 3,538.46 Q 5,145.96
5.3 PISO Q 3,142.86 Q 574.53 Q 1,428.57 Q 64,560.00
5.4 INSTALACIONES ESPECIALES Q 52,640.00 Q 8,720.00 Q 3,200.00 Q 64,560.00
6 REACTOR AEROBIO Q 830,967.38
6.1 MUROS Q 95,807.43 Q 10,683.40 Q 5,164.29 Q 111,655.11
6.2 PANTALLA Q 18,775.23 Q 2,135.40 Q 4,153.85 Q 25,064.48
6.3 PISO Q 27,775.29 Q 3,444.12 Q 3,192.86 Q 34,412.26
6.4 CIMIENTO Q 18,357.14 Q 2,293.60 Q 2,471.43 Q 23,122.17
6.5 INSTALACIONES ESPECIALES Q 427,500.00 Q 252,000.00 Q 5,400.00 Q 684,900.00
7 DECANTADOR SECUNDARIO Q 109,791.72
7.1 MUROS Q 32,829.77 Q 3,160.93 Q 4,095.05 Q 40,085.76
7.2 PANTALLA Q 2,687.57 Q 248.38 Q 3,538.46 Q 6,474.41
7.3 PISO Q 3,142.86 Q 574.53 Q 1,428.57 Q 5,145.96
7.4 INSTALACIONES ESPECIALES Q 52,640.00 Q 8,720.00 Q 3,200.00 Q 64,560.00
8 DIGESTOR Q 103,377.12
8.1 MUROS Q 36,573.91 Q 3,363.62 Q 4,197.25 Q 44,134.78
8.2 LOSA Q 8,686.67 Q 1,272.47 Q 4,133.33 Q 14,092.47
8.3 PISO Q 3,509.57 Q 387.05 Q 1,285.71 Q 5,182.34
8.4 INSTALACIONES ESPECIALES Q 45,140.00 Q 7,220.00 Q 1,700.00 Q 54,060.00
9 PATIOS DE SECADO Q 75,953.37
9.1 MUROS Q 47,472.00 Q 5,290.54 Q 3,279.67 Q 56,042.21
9.2 PISO Q 2,950.57 Q 375.87 Q 1,285.71 Q 4,612.16
9.3 CIMIENTO Q 3,050.00 Q 431.79 Q 1,321.43 Q 4,803.22
9.4 INSTALACIONES ESPECIALES Q 10,870.00 Q 3,195.00 Q 1,234.00 Q 15,299.00
10 ADMINISTRACION Q 94,500.00
10.1 PERSONAL FIJO Q - Q 94,500.00 Q - Q 94,500.00
11 PUESTA EN MARCHA Q 18,000.00
11.1 Periodo de Maduracion Q - Q 12,000.00 Q 12,000.00
11.2 Capacitación de personal de mantenimi Q - Q 6,000.00 Q 6,000.00
totales del renglon Q 1,124,579.34 Q 470,494.89 Q 79,597.76 Q 1,576,640.83
INSTALACIONES ESPECIALES Q 682,464.00 Q 290,955.00 Q 17,434.00 equipamiento Q 990,853.00
obra gris Q 585,787.83

integracion del factor de factor comercial


CONCEPTO PORCENTAJE COSTO
Imprevistor 15% Q 236,496.12

Utilidad 30% Q 472,992.25


Pago de IGSS/Intecap 10% Q 46,598.88
Timbres de ingeniería 0.10% Q 1,576.64
SUBTOTAL Q 757,663.90
FACTOR ISR (iva+5%+isr anual) 20% Q 151,532.78
aumento factorizad Q 909,196.68

costo neto factor Q 2,485,837.51

Proyecto: CONSTRUCCION DE PLANTA DE TRATAMIENTO


Ing. JEOVANI MIRANDA C. Construcción y Supervisión

factor correctivo en los costos 1.5766669625 Q 2,485,837.51

imprevisto
15%
Supe y direc
12%
utilidad
30%
IGSS e INT
12%
timb ing
0.10%
subtotal
fact isr
20%
GRAN TOTAL

Proyecto: CONSTRUCCION DE PLANTA DE TRATAMIENTO


Ing. JEOVANI MIRANDA C. Construcción y Supervisión

No.
1
1.1
1.2
2
2.1
3
3.1
4
4.1
4.2
4.3
5
5.1
5.2
5.3
5.4
6
6.1
6.2
6.3
6.4
6.5
7
7.1
7.2
7.3
7.4
8
8.1
8.2
8.3
8.4
9
9.1
9.2
9.3
9.4
10
10.1
11
11.1
11.2

Proyecto: CONSTRUCCION DE PLANTA DE TRATAMIENTO


Ing. JEOVANI MIRANDA C. Construcción y Supervisión
INVERSIONES WATERLOO, S.A.

INTEGRACION DEL PRESUPUESTO


PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES INDUSTRIALES

CONCEPTO Materiales Mano de Obra Transporte subtotales TOTAL


TRABAJOS PRELIMINARES Q 28,467.92
Rediseño y programación Q 2,365.00 Q 8,829.33 Q 788.33 Q 11,982.67
Construir Guardianía Q 7,665.95 Q 5,576.02 Q 3,243.28 Q 16,485.25
NIVELACION Y TRAZO Q 43,690.55
Nivelación Q 35,238.03 Q 5,461.57 Q 2,990.94 Q 43,690.55
ESTABILIZACION ESTRATIGRAFICA Q 62,968.93
Estabilización del area estructural Q 40,123.02 Q 17,169.90 Q 5,676.00 Q 62,968.93
CANAL DE REJAS, Q 262,601.86
Muros Q 73,946.85 Q 9,088.09 Q 6,955.53 Q 89,990.46
Piso Q 1,224.37 Q 220.18 Q 1,716.14 Q 3,160.70
Instalaciones Especiales Q 147,692.70 Q 17,501.00 Q 4,257.00 Q 169,450.71
DECANTADOR INICIAL Q 183,312.96
Muros Q 51,761.62 Q 4,983.73 Q 6,456.54 Q 63,201.89
Pantalla Deflectiva Q 4,237.40 Q 391.61 Q 5,578.98 Q 10,207.98
Piso Q 4,955.24 Q 905.85 Q 2,252.38 Q 8,113.47
Instalaciones Especiales Q 82,995.75 Q 13,748.54 Q 5,045.33 Q 101,789.62
REACTOR AEROBIO Q 1,386,133.11
Muros Q 151,056.41 Q 16,844.16 Q 8,142.36 Q 176,042.93
Pantalla Q 29,602.29 Q 3,366.81 Q 6,549.23 Q 39,518.33
Piso Q 43,792.38 Q 5,430.23 Q 5,034.07 Q 54,256.68
Cimiento Q 28,943.10 Q 3,616.24 Q 3,896.62 Q 36,455.96
Instalaciones Especiales Q 674,025.13 Q 397,320.07 Q 8,514.00 Q 1,079,859.20
DECANTADOR SECUNDARIO Q 183,312.96
Muros Q 51,761.62 Q 4,983.73 Q 6,456.54 Q 63,201.89
Pantalla Deflectiva Q 4,237.40 Q 391.61 Q 5,578.98 Q 10,207.98
Piso Q 4,955.24 Q 905.85 Q 2,252.38 Q 8,113.47
Instalaciones Especiales Q 82,995.75 Q 13,748.54 Q 5,045.33 Q 101,789.62
DIGESTOR Q 185,210.43
Muros Q 57,664.88 Q 5,303.31 Q 6,617.67 Q 69,585.86
Losa Q 13,695.98 Q 2,006.27 Q 6,516.89 Q 22,219.14
Piso Q 5,533.43 Q 610.25 Q 2,027.14 Q 8,170.82
Instalaciones Especiales Q 71,170.75 Q 11,383.54 Q 2,680.33 Q 85,234.62
PATIOS DE SECADO Q 127,326.25
Muros Q 74,847.54 Q 8,341.41 Q 5,170.95 Q 88,359.90
Piso Q 4,652.07 Q 592.63 Q 2,027.14 Q 7,271.84
Cimiento Q 4,808.84 Q 680.79 Q 2,083.45 Q 7,573.08
Instalaciones Especiales Q 17,138.37 Q 5,037.45 Q 1,945.61 Q 24,121.43
ADMINISTRACION Q 148,995.03
PERSONAL FIJO Q - Q 148,995.03 Q - Q 148,995.03
PUESTA EN MARCHA Q 28,380.01
Periodo de Maduracion Q - Q 18,920.00 Q - Q 18,920.00
Capacitación para mantenimiento Q - Q 9,460.00 Q - Q 9,460.00
GRAN TOTAL Q 2,640,400.00

$338,512.82

INSTALACIONES ESPECIALES Q 1,076,018.44 Q 458,739.14 Q 27,487.61


totales del renglon Q 1,773,087.09 Q 741,813.75 Q 125,499.15 Q 2,640,400.00 $200,287.84
% del proyecto 67.15 28.09 4.75 100.00 $138,224.98
en dolares $227,318.86 $95,104.33 $16,089.64

% del proyecto 59.17 equipamiento Q 1,562,245.19


% del proyecto 40.83 obra gris Q 1,078,154.81
CONCEPTO
total 100.00
Equipamiento
Obra Gris
TOTAL

Proyecto: CONSTRUCCION DE PLANTA DE TRATAMIENTO


Ing. JEOVANI MIRANDA C. Construcción y Supervisión

Proyecto: CONSTRUCCION DE PLANTA DE TRATAMIENTO


Ing. JEOVANI MIRANDA C. Construcción y Supervisión

DIVISION DE RENGLONES
COSTO POR RENGLON
TOTALES Porcentaje
Materiales Mano de Obra Transporte
Q 1,076,018.44 Q 458,739.14 Q 27,487.61 Q 1,562,245.19 59.17
Q 697,068.65 Q 283,074.61 Q 98,011.54 Q 1,078,154.81 40.83
Q 1,773,087.09 Q 741,813.75 Q 125,499.15 Q 2,640,400.00 100.00

Proyecto: CONSTRUCCION DE PLANTA DE TRATAMIENTO


concreto hierro madera o for mano de ob sub total imprevisto Supe y direc utilidad IGSS e INT timb ing subtotal fact isr
decan 8 42 52.45 50% 15% 12% 30% 12% 0.10% 20%
canal 2.57 10 3.57
reactor 60 170 238.08
digestor 13 28 59.18
patio 10 14 78.36
decant sec 8 42 37.39
101.57 306 469.0225
extras 10.157 30.6 46.90225
111.727 336.6 515.92475
costo Q 1,030.00 Q 300.00 Q 28,769.70
total Q 115,078.81 Q 100,980.00 ### Q 5,774,171.70 ### ### ### ### ### Q 17,322.52 ### ###

Q/m2 Q 767.19 Q 673.20 Q 75,548.56 Q 38,494.48 Q 115,483.43 Q 17,322.52 Q 13,858.01 Q 34,645.03 Q 13,858.01 Q 115.48 Q 195,282.49 Q 39,056.50

conc 3000 conc 5000 hierro amat formaleta m2 formaleta ext formaleta int
Q 225.00 Q 225.00 300 long h areas long h areas
Q 685.00 Q 805.00 0.65 0.85 0.55 0.30 0.85 0.26 decan 52.45
Q 910.00 Q 1,030.00 2.25 1.15 2.59 2.10 1.15 2.42 canal 3.5675
1.00 2.15 2.15 0.3 1.15 0.35 reactor 238.08
formaleta interna 6.15 3.65 22.45 7.24 2.15 15.57 digestor 59.1775
lado altura 11.80 3.65 43.07 2.44 2.15 5.25 patio 78.3625
4.8 3 7.40 3.65 27.01 1.22 3.65 4.45 decant sec 37.385
4.8 3 3.30 3.65 12.05 48.00 3.5 168.00
1.22 2.56 3.35 1.65 5.53 7.24 3.5 25.34
1.22 2.56 5.20 1.5 7.80 13.10 3.5 45.85
75.7 3.35 1.65 5.53 3.2 1.65 5.28
13.80 3.65 50.37 6.7 1.65 11.06
1.00 0.85 0.85 3.2 1.65 5.28
179.94 286.07
total 466.01
GRAN TOTAL

Q 35,150,847.62

Q 234,338.98
No. ACTIVIDAD A DESARROLLAR MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
Estudio del área disponible y adecuación de las
0
unidades a construir

1 Nivelacion, compactacion, armadura y fundicion del


area de pretratamiento.

2 Armadura, fundicion, desencofrado del decantador


Laminar

3 Nivelacion, compactación, armadura, fundicion y


desencofrado del Reactor.
4 Armadura, fundicion, desencofrado del decantador
secundario Laminar

5 Nivelacion, compactación, armadura, fundicion y


desencofrado del Digestor
Nivelacion, compactación, armadura, fundicion y
6
colocacion de estrato de arena patio de secado

7
Aplicación de impermeabilizantes y selladores.

8 Instalaciones de equipo, bombas, aereadores


tuberias.

9 Periodo de Maduracion de la planta de tratamiento.


(puesta en Marcha)

INVERSIONES WATERLOO, S.A.

CRONOGRAMA DE EJECUCION
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES INDUSTRIALES
No. CONCEPTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
1 TRABAJOS PRELIMINARES
1.1 Rediseño y programación
1.2 Construir Guardianía
2 NIVELACION Y TRAZO
2.1 Nivelación
3 ESTABILIZACION ESTRATIGRAFICA
3.1 Estabilización del area estructural
4 CANAL DE REJAS,
4.1 Muros
4.2 Piso
4.3 Instalaciones Especiales
5 DECANTADOR INICIAL
5.1 Muros
5.2 Pantalla Deflectiva
5.3 Piso
5.4 Instalaciones Especiales
6 REACTOR AEROBIO
6.1 Muros
6.2 Pantalla
6.3 Piso
6.4 Cimiento
6.5 Instalaciones Especiales
7 DECANTADOR SECUNDARIO
7.1 Muros
7.2 Pantalla Deflectiva
7.3 Piso
7.4 Instalaciones Especiales
8 DIGESTOR
8.1 Muros
8.2 Losa
8.3 Piso
8.4 Instalaciones Especiales
9 PATIOS DE SECADO
9.1 Muros
9.2 Piso
9.3 Cimiento
9.4 Instalaciones Especiales
10 ADMINISTRACION
10.1 Personal Permanente
11 PUESTA EN MARCHA DE LA PLANTA
11.1 Periodo de Maduracion
11.2 Capacitación de personal de mantenimiento
No.

10

11

No.

10

11
FLUJOGRAMA SOBRE EJECUCION DE ACTIVIDADES
CONCEPTO MES 1 MES 2 MES 3

TRABAJOS PRELIMINARES Q 28,467.92 Q 28,467.92

NIVELACION Y TRAZO Q 43,690.55 Q 43,690.55

ESTABILIZACION ESTRATIGRAFICA Q 62,968.93 Q 62,968.93

CANAL DE REJAS, Q 65,650.47 Q 65,650.47 Q 65,650.47 Q 65,650.47 Q 262,601.86

DECANTADOR INICIAL Q 45,828.24 Q 45,828.24 Q 45,828.24 Q 45,828.24 Q 183,312.96

REACTOR AEROBIO Q 277,226.62 Q 277,226.62 Q 277,226.62 Q 277,226.62 Q 277,226.62 Q 1,386,133.11

DECANTADOR SECUNDARIO Q 36,662.59 Q 36,662.59

DIGESTOR

PATIOS DE SECADO

ADMINISTRACION Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84

PUESTA EN MARCHA DE LA PLANTA

FLUJO SEMANAL DE GASTOS Q 36,309.76 Q 51,532.39 Q 70,810.77 Q 73,492.31 Q 73,492.31 Q 119,320.55 Q 396,547.17 Q 330,896.71 Q 330,896.71 Q 285,068.46 Q 321,731.06 Q 44,504.44

FLUJO MENSUAL DE GASTOS Q232,145.23 Q920,256.74 Q982,200.66

CONCEPTO MES 4 MES 5 MES 6 TOTALES

TRABAJOS PRELIMINARES Q 28,467.92

NIVELACION Y TRAZO Q 43,690.55

ESTABILIZACION ESTRATIGRAFICA Q 62,968.93

CANAL DE REJAS, Q 262,601.86

DECANTADOR INICIAL Q 183,312.96

REACTOR AEROBIO Q 1,386,133.11

DECANTADOR SECUNDARIO Q 36,662.59 Q 36,662.59 Q 36,662.59 Q 183,312.96

DIGESTOR Q 37,042.09 Q 37,042.09 Q 37,042.09 Q 37,042.09 Q 37,042.09 Q 185,210.43

PATIOS DE SECADO Q 25,465.25 Q 25,465.25 Q 25,465.25 Q 25,465.25 Q 25,465.25 Q 127,326.25

ADMINISTRACION Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 7,841.84 Q 148,995.03

PUESTA EN MARCHA DE LA PLANTA Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 28,380.01

FLUJO MENSUAL DE GASTOS Q 81,546.52 Q 81,546.52 Q 107,011.77 Q 70,349.18 Q 73,896.68 Q 36,854.59 Q 36,854.59 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 3,547.50 Q 2,640,400.00

FLUJO SEMANAL DE GASTOS Q340,454.00 Q151,153.37 Q14,190.00


Q262,601.86
Q183,312.96
1386133.1074 Q1,386,133.11
Q183,312.96
Q185,210.43
Q127,326.25
Q148,995.03
28380.0053257465
183312.96041
185210.43256
127326.24639
148995.02796
28380.005326 148995.02796
###