CANTIDAD DE MATERIALES POR M3 PARA OBRA

F'c= 350 Kg/cm


1p3 0.02832 m3
1m3 35.3147 p3
SLUMP =3-4" sin plastificante
SLUMP =4" con plastificante
DISEÑO UNI CEMENTO ARENA PIEDRA AGUA (lt) PLASTIMENT (mml) AIRE (mml)
KG 488.00 832.00 805.00 203.00 1,950.00 150.00
PROPORCION UNI 1.00 1.70 1.65 17.70 4.00 13.06 Lampon de excavadora CAT 325 Carmix 3m3 unical
PROPORCION OBRA 1.00 1.70 1.65 12.03 4.00 13.00 Correccion de 1.56 m3/lampa Aditivos 18.00 p3/lampa
Agua en Obra mml
Volumen CEMENTO BOLSA ARENA m3 PIEDRA m3 AGUA PLASTIMENT AIRE litros Lampon Arena Lampon Piedra Plastificante Aire Lampon Arena Lampon Piedra
1.00 m3 11.48 0.55 0.54 186.00 1,950.00 150.00 114.29 0.35 0.35 1,952.00 149.27 1.08 1.06
1.50 m3 17.22 0.83 0.80 279.00 2,925.00 225.00 171.43 0.53 0.52 2,928.00 223.91 1.63 1.58
2.00 m3 22.96 1.11 1.07 372.00 3,900.00 300.00 228.57 0.71 0.69 3,904.00 298.54 2.17 2.11
2.50 m3 28.71 1.38 1.34 465.00 4,875.00 375.00 285.71 0.89 0.86 4,880.00 373.18 2.71 2.63
3.00 m3 34.45 1.66 1.61 558.00 5,850.00 450.00 342.86 1.06 1.03 5,856.00 447.81 3.25 3.16
3.50 m3 40.19 1.93 1.88 651.00 6,825.00 525.00 400.00 1.24 1.21 6,832.00 522.45 3.80 3.68
4.00 m3 45.93 2.21 2.15 744.00 7,800.00 600.00 457.14 1.42 1.38 7,808.00 597.08 4.34 4.21
4.50 m3 51.67 2.49 2.41 837.00 8,775.00 675.00 514.29 1.60 1.55 8,784.00 671.72 4.88 4.74
5.00 m3 57.41 2.76 2.68 930.00 9,750.00 750.00 571.43 1.77 1.72 9,760.00 746.35 5.42 5.26
5.50 m3 63.15 3.04 2.95 1,023.00 10,725.00 825.00 628.57 1.95 1.89 10,736.00 820.99 5.97 5.79
6.00 m3 68.89 3.32 3.22 1,116.00 11,700.00 900.00 685.71 2.13 2.07 11,712.00 895.62 6.51 6.32
6.50 m3 74.64 3.59 3.49 1,209.00 12,675.00 975.00 742.86 2.31 2.24 12,688.00 970.26 7.05 6.84
7.00 m3 80.38 3.87 3.76 1,302.00 13,650.00 1,050.00 800.00 2.48 2.41 13,664.00 1,044.89 7.59 7.37
7.50 m3 86.12 4.15 4.02 1,395.00 14,625.00 1,125.00 857.14 2.66 2.58 14,640.00 1,119.53 8.13 7.89
8.00 m3 91.86 4.42 4.29 1,488.00 15,600.00 1,200.00 914.29 2.84 2.76 15,616.00 1,194.16 8.68 8.42

0.25 m3 3.00 0.14 0.14 47.00 509.48 39.19

Tolva de 11 p3
Correccion de Aditivos
Cantidad de
cemento Agua en Obra mml
7.00 lampadas de arena por p3 (Bls) litros Lampadas Arena Lampadas Piedra Plastificante Aire
6.00 lampadas de piedra por p3 1.00 12.03 11.90 9.90 170.00 13.00
2.00 24.06 23.80 19.80 340.00 26.00

1.00 m 3.28 p
1.00 m3 35.31 p3
0.08 3.00
CANTIDAD DE MATERIALES POR M3 PARA OBRA
F'c= 280Kg/cm
1p3 0.02832 m3
1m3 35.3147 p3
SLUMP =4" sin plastificante
SLUMP =6" con plastificante
DISEÑO UNI CEMENTO ARENA PIEDRA AGUA (lt) PLASTIMENT (mml) AIRE (mml)
KG 400.00 838.00 896.00 186.00 2,340.00 260.00
PROPORCION UNI 1.00 2.10 2.24 19.58 5.85 27.37 Lampon de excavadora CAT 325 Carmix 3m3 unical
PROPORCION OBRA 1.00 2.10 2.24 12.03 6.00 20.00 Correccion de 1.56 m3/lampa Aditivos 18.00 p3/lampa
Agua en Obra mml
Volumen CEMENTO BOLSA ARENA m3 PIEDRA m3 AGUA PLASTIMENT AIRE litros Lampon Arena Lampon Piedra Plastificante Aire Lampon Arena Lampon Piedra
1.00 m3 9.50 0.56 0.60 186.00 2,361.94 260.00 114.29 0.36 0.39 2,422.50 190.00 1.10 1.18
1.50 m3 14.25 0.85 0.90 279.00 3,542.91 390.00 171.43 0.54 0.58 3,633.75 285.00 1.66 1.77
2.00 m3 19.00 1.13 1.21 372.00 4,723.88 520.00 228.57 0.73 0.77 4,845.00 380.00 2.22 2.36
2.50 m3 23.75 1.41 1.51 465.00 5,904.84 650.00 285.71 0.91 0.97 6,056.25 475.00 2.77 2.96
3.00 m3 28.50 1.69 1.81 558.00 7,085.81 780.00 342.86 1.09 1.16 7,267.50 570.00 3.33 3.55
3.50 m3 33.25 1.98 2.11 651.00 8,266.78 910.00 400.00 1.27 1.35 8,478.75 665.00 3.88 4.14
4.00 m3 38.00 2.26 2.41 744.00 9,447.75 1,040.00 457.14 1.45 1.55 9,690.00 760.00 4.43 4.73
4.50 m3 42.75 2.54 2.71 837.00 10,628.72 1,170.00 514.29 1.63 1.74 10,901.25 855.00 4.99 5.32
5.00 m3 47.50 2.82 3.01 930.00 11,809.69 1,300.00 571.43 1.81 1.93 12,112.50 950.00 5.54 5.91
5.50 m3 52.25 3.11 3.31 1,023.00 12,990.66 1,430.00 628.57 1.99 2.13 13,323.75 1,045.00 6.10 6.50
6.00 m3 57.00 3.39 3.62 1,116.00 14,171.63 1,560.00 685.71 2.18 2.32 14,535.00 1,140.00 6.65 7.09
6.50 m3 61.75 3.67 3.92 1,209.00 15,352.59 1,690.00 742.86 2.36 2.51 15,746.25 1,235.00 7.20 7.69
7.00 m3 66.50 3.95 4.22 1,302.00 16,533.56 1,820.00 800.00 2.54 2.71 16,957.50 1,330.00 7.76 8.28
7.50 m3 71.25 4.24 4.52 1,395.00 17,714.53 1,950.00 857.14 2.72 2.90 18,168.75 1,425.00 8.31 8.87
8.00 m3 76.00 4.52 4.82 1,488.00 18,895.50 2,080.00 914.29 2.90 3.09 19,380.00 1,520.00 8.87 9.46

Tolva de 11 p3
Correccion de Aditivos
Cantidad de
cemento Agua en Obra mml
7.00 lampadas de arena por p3 (Bls) litros Lampadas Arena Lampadas Piedra Plastificante Aire
6.00 lampadas de piedra por p3 1.00 12.03 14.70 13.44 255.00 20.00
2.00 24.06 29.40 26.88 510.00 40.00
CANTIDAD DE MATERIALES POR M3 PARA OBRA
F'c= 210Kg/cm
1p3 0.02832 m3
1m3 35.3147 p3
SLUMP =4" sin plastificante
SLUMP =6" con plastificante
DISEÑO UNI CEMENTO ARENA PIEDRA AGUA (lt) PLASTIMENT (mml) AIRE (mml)
KG 350.00 864.00 903.00 186.00 2,100.00 240.00
PROPORCION UNI 1.00 2.47 2.58 20.67 6.00 26.67 Lampon de excavadora CAT 325 Carmix 3m3 unical
PROPORCION OBRA 1.00 2.37 2.47 12.03 6.00 20.00 Correccion de 1.56 m3/lampa Aditivos 18.00 p3/lampa
Agua en Obra mml
Volumen CEMENTO BOLSA ARENA m3 PIEDRA m3 AGUA PLASTIMENT AIRE litros Lampon Arena Lampon Piedra Plastificante Aire Lampon Arena Lampon Piedra
1.00 m3 9.00 0.60 0.63 186.00 2,295.00 240.00 114.29 0.39 0.40 2,295.00 180.00 1.18 1.24
1.50 m3 13.00 0.87 0.91 279.00 3,442.50 346.67 171.43 0.56 0.58 3,442.50 260.00 1.71 1.79
2.00 m3 17.00 1.14 1.19 372.00 4,590.00 453.33 228.57 0.73 0.76 4,590.00 340.00 2.24 2.33
2.50 m3 21.00 1.41 1.47 465.00 5,737.50 560.00 285.71 0.91 0.94 5,737.50 420.00 2.77 2.88
3.00 m3 25.00 1.68 1.75 558.00 6,885.00 666.67 342.86 1.08 1.12 6,885.00 500.00 3.30 3.43
3.50 m3 29.00 1.95 2.03 651.00 8,032.50 773.33 400.00 1.25 1.30 8,032.50 580.00 3.83 3.98
4.00 m3 33.00 2.21 2.31 744.00 9,180.00 880.00 457.14 1.42 1.48 9,180.00 660.00 4.34 4.53
4.50 m3 38.00 2.55 2.66 837.00 10,327.50 1,013.33 514.29 1.64 1.71 10,327.50 760.00 5.00 5.22
5.00 m3 42.00 2.82 2.94 930.00 11,475.00 1,120.00 571.43 1.81 1.89 11,475.00 840.00 5.53 5.77
5.50 m3 46.00 3.09 3.22 1,023.00 12,622.50 1,226.67 628.57 1.98 2.07 12,622.50 920.00 6.06 6.32
6.00 m3 50.00 3.36 3.50 1,116.00 13,770.00 1,333.33 685.71 2.16 2.25 13,770.00 1,000.00 6.59 6.87
6.50 m3 54.00 3.62 3.78 1,209.00 14,917.50 1,440.00 742.86 2.32 2.43 14,917.50 1,080.00 7.10 7.42
7.00 m3 58.00 3.89 4.06 1,302.00 16,065.00 1,546.67 800.00 2.50 2.61 16,065.00 1,160.00 7.63 7.97
7.50 m3 62.00 4.16 4.34 1,395.00 17,212.50 1,653.33 857.14 2.67 2.79 17,212.50 1,240.00 8.16 8.51
8.00 m3 66.00 4.43 4.62 1,488.00 18,360.00 1,760.00 914.29 2.84 2.97 18,360.00 1,320.00 8.69 9.06

Tolva de 11 p3
Correccion de Aditivos
Cantidad de
cemento Agua en Obra mml
7.00 lampadas de arena por p3 (Bls) litros Lampadas Arena Lampadas Piedra Plastificante Aire
6.00 lampadas de piedra por p3 1.00 12.03 16.59 14.82 255.00 20.00
2.00 24.06 33.18 29.64 510.00 40.00

8.24 9.00
12.35 13.00
16.47 17.00
20.59 21.00
24.71 25.00
28.82 29.00
32.94 33.00
37.06 38.00
41.18 42.00
45.29 46.00
49.41 50.00
53.53 54.00
57.65 58.00
61.76 62.00
65.88 66.00
CANTIDAD DE MATERIALES POR M3 PARA OBRA
F'c= 140 Kg/cm
1p3 0.02832 m3
1m3 35.3147 p3
SLUMP =4" sin plastificante
SLUMP =6" con plastificante
DISEÑO UNI CEMENTO ARENA PIEDRA AGUA (lt) PLASTIMENT (mml) AIRE (mml)
KG 290.00 933.00 767.00 186.00 1,636.00 240.00
PROPORCION UNI 1.00 3.22 2.64 27.26 5.64 35.17 Lampon de excavadora CAT 325 Carmix 3m3 unical
PROPORCION OBRA 1.00 3.20 2.60 12.03 5.50 25.00 Correccion de 1.56 m3/lampa Aditivos 18.00 p3/lampa
Agua en Obra mml
Volumen CEMENTO BOLSA ARENA m3 PIEDRA m3 AGUA PLASTIMENT AIRE litros Lampon Arena Lampon Piedra Plastificante Aire Lampon Arena Lampon Piedra
1.00 m3 6.82 0.62 0.50 186.00 1,636.00 240.00 114.29 0.40 0.32 1,595.00 170.59 1.22 0.98
1.50 m3 10.24 0.93 0.75 279.00 2,454.00 360.00 171.43 0.60 0.48 2,392.50 255.88 1.82 1.47
2.00 m3 13.65 1.24 1.00 372.00 3,272.00 480.00 228.57 0.80 0.64 3,190.00 341.18 2.43 1.96
2.50 m3 17.06 1.55 1.26 465.00 4,090.00 600.00 285.71 0.99 0.81 3,987.50 426.47 3.04 2.47
3.00 m3 20.47 1.86 1.51 558.00 4,908.00 720.00 342.86 1.19 0.97 4,785.00 511.76 3.65 2.96
3.50 m3 23.88 2.16 1.76 651.00 5,726.00 840.00 400.00 1.39 1.13 5,582.50 597.06 4.24 3.45
4.00 m3 27.29 2.47 2.01 744.00 6,544.00 960.00 457.14 1.59 1.29 6,380.00 682.35 4.85 3.94
4.50 m3 30.71 2.78 2.26 837.00 7,362.00 1,080.00 514.29 1.78 1.45 7,177.50 767.65 5.45 4.43
5.00 m3 34.12 3.09 2.51 930.00 8,180.00 1,200.00 571.43 1.98 1.61 7,975.00 852.94 6.06 4.92
5.50 m3 37.53 3.40 2.76 1,023.00 8,998.00 1,320.00 628.57 2.18 1.77 8,772.50 938.24 6.67 5.41
6.00 m3 40.94 3.71 3.01 1,116.00 9,816.00 1,440.00 685.71 2.38 1.93 9,570.00 1,023.53 7.28 5.91
6.50 m3 44.35 4.02 3.27 1,209.00 10,634.00 1,560.00 742.86 2.58 2.10 10,367.50 1,108.82 7.89 6.42
7.00 m3 47.76 4.33 3.52 1,302.00 11,452.00 1,680.00 800.00 2.78 2.26 11,165.00 1,194.12 8.50 6.91
7.50 m3 51.18 4.64 3.77 1,395.00 12,270.00 1,800.00 857.14 2.98 2.42 11,962.50 1,279.41 9.10 7.40
8.00 m3 54.59 4.95 4.02 1,488.00 13,088.00 1,920.00 914.29 3.18 2.58 12,760.00 1,364.71 9.71 7.89

Tolva de 11 p3
Correccion de Aditivos
Cantidad de
cemento Agua en Obra mml
7.00 lampadas de arena por p3 (Bls) litros Lampadas Arena Lampadas Piedra Plastificante Aire
6.00 lampadas de piedra por p3 1.00 12.03 22.40 15.60 233.75 25.00
2.00 24.06 44.80 31.20 467.50 50.00

8.24 8.25
12.35 12.35
16.47 16.47
20.59 20.59
24.71 24.71
28.82 28.82
32.94 32.94
37.06 37.06
41.18 41.18
45.29 45.29
49.41 49.41
53.53 53.53
57.65 57.65
61.76 61.76
65.88 65.88
CANTIDAD DE MATERIALES POR M3 PARA OBRA
F'c= 100 Kg/cm
1p3 0.02832 m3
1m3 35.3147 p3
SLUMP =4" sin plastificante
SLUMP =6" con plastificante
DISEÑO UNI CEMENTO ARENA PIEDRA AGUA (lt) PLASTIMENT (mml) AIRE (mml)
KG 212.00 933.00 767.00 186.00 1,275.00 125.00
PROPORCION UNI 1.00 4.40 3.62 37.29 6.01 25.06 Lampon de excavadora CAT 325 Carmix 3m3 unical
PROPORCION OBRA 1.00 4.40 3.60 12.03 6.00 25.00 Correccion de 1.56 m3/lampa Aditivos 18.00 p3/lampa
Agua en Obra mml
Volumen CEMENTO BOLSA ARENA m3 PIEDRA m3 AGUA PLASTIMENT AIRE litros Lampon Arena Lampon Piedra Plastificante Aire Lampon Arena Lampon Piedra
1.00 m3 4.99 0.62 0.51 186.00 1,275.00 125.00 114.29 0.40 0.33 1,272.00 124.71 1.22 1.00
1.50 m3 7.48 0.93 0.76 279.00 1,912.50 187.50 171.43 0.60 0.49 1,908.00 187.06 1.82 1.49
2.00 m3 9.98 1.24 1.02 372.00 2,550.00 250.00 228.57 0.80 0.65 2,544.00 249.41 2.43 2.00
2.50 m3 12.47 1.55 1.27 465.00 3,187.50 312.50 285.71 0.99 0.82 3,180.00 311.76 3.04 2.49
3.00 m3 14.96 1.86 1.53 558.00 3,825.00 375.00 342.86 1.19 0.98 3,816.00 374.12 3.65 3.00
3.50 m3 17.46 2.18 1.78 651.00 4,462.50 437.50 400.00 1.40 1.14 4,452.00 436.47 4.28 3.49
4.00 m3 19.95 2.49 2.03 744.00 5,100.00 500.00 457.14 1.60 1.30 5,088.00 498.82 4.89 3.98
4.50 m3 22.45 2.80 2.29 837.00 5,737.50 562.50 514.29 1.80 1.47 5,724.00 561.18 5.49 4.49
5.00 m3 24.94 3.11 2.54 930.00 6,375.00 625.00 571.43 2.00 1.63 6,360.00 623.53 6.10 4.98
5.50 m3 27.44 3.42 2.80 1,023.00 7,012.50 687.50 628.57 2.20 1.80 6,996.00 685.88 6.71 5.49
6.00 m3 29.93 3.73 3.05 1,116.00 7,650.00 750.00 685.71 2.39 1.96 7,632.00 748.24 7.32 5.98
6.50 m3 32.42 4.04 3.31 1,209.00 8,287.50 812.50 742.86 2.59 2.12 8,268.00 810.59 7.93 6.49
7.00 m3 34.92 4.35 3.56 1,302.00 8,925.00 875.00 800.00 2.79 2.28 8,904.00 872.94 8.53 6.98
7.50 m3 37.41 4.66 3.81 1,395.00 9,562.50 937.50 857.14 2.99 2.45 9,540.00 935.29 9.14 7.47
8.00 m3 39.91 4.97 4.07 1,488.00 10,200.00 1,000.00 914.29 3.19 2.61 10,176.00 997.65 9.75 7.99

Tolva de 11 p3
Correccion de Aditivos
Cantidad de
cemento Agua en Obra mml
7.00 lampadas de arena por p3 (Bls) litros Lampadas Arena Lampadas Piedra Plastificante Aire
6.00 lampadas de piedra por p3 1.00 12.03 30.80 21.60 255.00 25.00
2.00 24.06 61.60 43.20 510.00 50.00

8.24 8.25
12.35 12.35
16.47 16.47
20.59 20.59
24.71 24.71
28.82 28.82
32.94 32.94
37.06 37.06
41.18 41.18
45.29 45.29
49.41 49.41
53.53 53.53
57.65 57.65
61.76 61.76
65.88 65.88