NEC Pasolink NEO Series

PDH/SDH Digital Radio System


Installation and Initial Lineup

Installation: Typical Installation Flow


Unpacking of IDU Unpacking of ODU

IDU Mounting ODU Mounting

Waveguide Connection
(if required)

Cable Termination

Frame Grounding

Waterproof Protection

January 14, 2007 NEC Corporation 2007 2

1
2007-01-14

Installation: Packages
Each unpacked component of the IDU and ODU
must be check as shown below:
NO. Description
1 TRP-( )G-1B (ODU)
2 MDP-150MB-1AA (IDU)
3 O-Ring (Attached to the waveguide type ODU)
4 Power Connector and Socket Contact
5 Cylindrical Fuse
6 XPCI CTRL Cable (Q.Ty:1) (Apply for XPIC configuration only)
7 X-IF Coaxial Cable (Q.Ty:
(Q Ty: 2) (Apply for XPIC configuration only)

Note:
*1. One more ODU and MODEM module are provided for HS/Twinpath
configuration.
*2. One spare fuse is provided in the MODEM module.
Contents of Basic Unit Package

January 14, 2007 NEC Corporation 2007 3

Installation: Packages

NO
NO. Description
1 I/O Board Bracket
2 I/O Board
3 DC-DC CONV Unit

Contents of Optional Unit Package

January 14, 2007 NEC Corporation 2007 4

2
2007-01-14

Installation: Packages

NO
NO. Description
1 Pole Mounting Bracket for Coaxial Cable Connection Type (6/7/8GHz)
2 Pole Mounting Bracket for Wave Guide connection Type
3 Pole Mounting bracket for Antenna direct Mounting Type

Pole Mounting Bracket

January 14, 2007 NEC Corporation 2007 5

Installation: Packages

Installation kit Packing List of IDU and ODU for 1+0

January 14, 2007 NEC Corporation 2007 6

3
2007-01-14

Installation: Packages

Installation kit Packing List of IDU and ODU for 1+1

January 14, 2007 NEC Corporation 2007 7

Installation: Packages
NO. Description
1 DC-DC CONV Unit
2 DC-DC CONV
3 Power Cable, attached to the DC-DC CONV
4 Power Connector
5 Cylindrical Fuse

Note:
*1. One more ODU and MODEM module are provided for HS/Twinpath
configuration.
*2. One spare fuse is provided in the MODEM module.

Installation kit Packing List of DC-DC CONV UNIT for 1+1

January 14, 2007 NEC Corporation 2007 8

4
2007-01-14

Installation: Unpacking of IDU

When conveying the IDU to


another place, the original
packing should be used to
avoid damage

Unpacking procedure of IDU

January 14, 2007 NEC Corporation 2007 9

Installation: Unpacking of ODU

When conveying the ODU to


another place, the original
packing should be used to
avoid damage

Unpacking procedure of ODU

January 14, 2007 NEC Corporation 2007 10

5
2007-01-14

Installation: IDU Installation


Step2: Align the IDU to the mounting position on the 19’inch rack.
As shown below
below.

Step1: Change the two brackets to desired position on the


IDU if necessary. As shown above.

1+0/1+1 System IDU

January 14, 2007 NEC Corporation 2007 11

Installation: IDU Installation


Step4: To mount the IDU in a 19-inch rack, take a space more than
200mm to the rear section and space for one unit to the top and
bottom. As shown below.

Step3: Fix each side of the IDU to the 19-inch rack with
the two screws. As shown above. * Normal setting for free space. When free space is closed
within one rack unit, keep the environment temperature is
lower than +40 ℃
1+0/1+1 System IDU

January 14, 2007 NEC Corporation 2007 12

6
2007-01-14

Installation: I/O Board Installation


(Optional)

Step1: After the I/O Board Bracket is unpacked,loosen six screws to remove the three I/O Board cards from
the bracket. As shown above.

Note: Keep these six screws until the 2M


IN/OUT Connectors are fixed again when
the I/O board is not used.

Step2: Remove six screws fixed the 2M IN/OUT connectors to the 48E1 INTFC on the IDU installed in the
19-inch rack. As shown above.

1+0/1+1 System IDU

January 14, 2007 NEC Corporation 2007 13

Installation: I/O Board Installation


(Optional)

Note: Contact NEC for the optional mounting


bracket for the I/O Board when IDU is fixed
to the rack in centre side.

Step3: Align the I/O board bracket to the upper position of the IDU on the 19-inch rack. Fix provisionally
each side of the I/O board bracket to the 19-inch rack with the four screws. As shown above

Step4: Put the I/O Board to the I/O Board bracket so that the gasket fits to between the I/O Board Bracket
and the connectors. As shown above. 1+0/1+1 System IDU

January 14, 2007 NEC Corporation 2007 14

7
2007-01-14

Installation: I/O Board Installation


(Optional)

Step5: After checking the inserted gasket position, loosely tighten screws. Similarly put other I/O Board to
the I/O Board Bracket .As shown above.

Step6: Loosely tighten the each two screws(Position1,2,3,4


screws(Position1 2 3 4 as shown in figure above) for the connector of
the IDU.

Step7: Properly tighten the four screws (Position 5 as shown in figure above) of the I/O Board Bracket.

1+0/1+1 System IDU

January 14, 2007 NEC Corporation 2007 15

Installation: DC-DC CONV Mounting


(Optional)

Step1: Fix DC-DC CONV UNIT to the 19-inch rack using the two screws.
As shown above.
above

Note: * Space 0.5 rack unit in the upper or lower DC-DC CONV Unit.

1+0/1+1 System IDU

January 14, 2007 NEC Corporation 2007 16

8
2007-01-14

Installation: ODU Mounting


Two types of mounting for the antenna : antenna direct mounting type
and waveguide connecting type.
Caution1: How to use small and large O-rings
O rings are shown in following
table. Two (small and large) O-rings are attached in 18 to 38GHz band
Tools Andrew/RFS direct mount antenna.11/13/15GHz band antenna does
not have small O-rings (Small O-ring is not used for Andrew/RFS
Wrench or Monkey Wrench direct mount antenna). If the small O-rings is used for ODU direct
Screwdriver mount installation, a gap may occur between ODU and antenna for RF
interface. Therefore it may happen transmit or receive level down.
Torque Wrench Caution2: Do not apply silicon grease at O-ring.

Attachment position of O-rings O-rings


System Remarks
Note; (between:)
11/13/15GHz Small Size Large Size
antenna for direct ANT--ODU Not used Used Antenna Direct Mounting
1+0
mount is not ANT—WG/ODU (18-38G Band) Used Not Used Waveguide connection
possible to connect ANT--HYB Not Used Used Antenna direct Mounting
the ordinary 1+1 ANT----WG/HYB (18-38G Band)
waveguide flanges Used Not Used Waveguide connection

January 14, 2007 NEC Corporation 2007 17

Installation: ODU Mounting


Note1. Don’t use both small O-ring and large O-
rings simultaneously.
Note2. O-ring size is different with frequency band
as follows:

Small Size O-ring for waveguide connection

Large Size O-ring for Antenna direct mounting

January 14, 2007 NEC Corporation 2007 18

9
2007-01-14

Installation: ODU Mounting


Change of Polarization
Note1. The details are referred to the installation
ODU Direct Mounting Type Antenna (Example Andrew)
manual which is attached to the antenna.
Note2. The Antenna is set to V-Polarization when
shipped from the factory.

Setp1: Keep the antenna stand


horizontally. Setp2: If you change to H polarization , loosen
the four screws with the Allen key wrench and
Note: Don’t remove the screw then rotate the Transition hub of feed, keeping Setp3: Holding the feed with Hand ,
complete from the screw hole.
hole the antenna stand horizontal Rotate the feed 90 degrees.
degrees

Setp4: Check that the aperture part of the


Transition hub is rotated 90 degrees, then fix it
with screws that were loosened in step 2

January 14, 2007 NEC Corporation 2007 19

Installation: ODU Mounting


Change of Polarization
Note1. The details are referred to the installation
ODU Direct Mounting Type Antenna (Example Andrew)
manual which is attached to the antenna.
Note2. The Antenna is set to V-Polarization when
shipped from the factory.

Setp1: Keep the antenna stand horizontally.


And Loosen six screws with Allen wrench Setp2: Rotate the transition hub
until transition can rotate freely. 90 degrees until timing pin
locates in timing concavity
Note: Don’t remove the screw complete from
the screw hole. Hold the feed horn with hand.

Setp3: Tighten six screws when transition hub is located

January 14, 2007 NEC Corporation 2007 20

10
2007-01-14

Installation: ODU Mounting


Change of Polarization
Note1. The details are referred to the installation
ODU Direct Mounting Type Antenna (RFS)
manual which is attached to the antenna.
Note2. The Antenna is set to V-Polarization when
shipped from the factory.

Setp1: Loosen the 3 screws


Setp2: Hold the feed tightly at the waveguide
Setp3: rotate carefully the feed 90 degrees
Setp4: Tighten 4 screws.

January 14, 2007 NEC Corporation 2007 21

Installation: ODU Mounting


Change of Polarization
NEC Hybrid Note1. The Hybrid is set to V-Polarization when shipped from the factory.

Setp1: If you change to H polarization, loosen two Setp2: Check that aperture of the connection unit is
screw, rotate the Transition hub and put the HYB rotated as shown above, then fix it with the two
horizontally screws that were loosened in step1.

January 14, 2007 NEC Corporation 2007 22

11
2007-01-14

Installation: ODU Mounting


Change of Polarization
Antenna Mounting ODU (11-38GHz Band)

Note1. When the ODU is mounted on to the NEC


HYB, only V polarization is applied.
1: When vertical polarization is required, rotate the 3.Screw in the guide pin removed in step2 to the
Note2. When the Waveguide or coaxial cable is
ODU so as to go up the plate marked V. screw hole of the plate marked H.
connected between the ODU and antenna, the
2: When horizontal polarization is required, remove 4. Rotate the ODU so as to go up the plate marked H.
ODU in V polarization for up position is
the guide pin fixed on the plate marked with V
recommended for installation.

January 14, 2007 NEC Corporation 2007 23

Installation: ODU Mounting


Bracket
Andrew Pole Mount Bracket

Setp1: Install the bracket to the


antenna pole.
Setp2: Mount antenna to the
bracket.

January 14, 2007 NEC Corporation 2007 24

12
2007-01-14

Installation: ODU Mounting


Bracket
RFS-SB1 type Pole Mount Bracket

January 14, 2007 NEC Corporation 2007 25

Installation: ODU Mounting


Bracket
RFS-C Type Pole Mount Bracket

January 14, 2007 NEC Corporation 2007 26

13
2007-01-14

Installation: ODU Mounting


Bracket
RFS-C Type Pole Mount Bracket

January 14, 2007 NEC Corporation 2007 27

Installation: ODU Mounting


Andrew type bracket

Step: Fix the ODU to the Bracket by


tightening the screws(four locations)

Note:
1.Figure shows V polarization.
2.Be careful not to damaged the O-
ring.
g

January 14, 2007 NEC Corporation 2007 28

14
2007-01-14

Installation: ODU Mounting


RFS SB1 type bracket

Note:
1.Figure shows V polarization.
2.Be careful not to damaged the O-ring.

January 14, 2007 NEC Corporation 2007 29

Installation: ODU Mounting


RFS C type bracket

Note:
1.Figure shows V polarization.
2.Be careful not to damaged the O-ring.

January 14, 2007 NEC Corporation 2007 30

15
2007-01-14

Installation: ODU Mounting


Step: Insert guide
ppin on the hole of
bracket to set the
position of screws.

Step: Fix the ODU to the bracket


with four screws

Align flanges on antenna


and ODU directly, and fix
the ODU with four screws.

January 14, 2007 NEC Corporation 2007 31

Installation: ODU Mounting

Antenna separation (S) is given by


path calculation depending on the
system parameter

January 14, 2007 NEC Corporation 2007 32

16
2007-01-14

Installation: ODU Mounting


Using HYB
The details are referred to the installation
manual which is attached to the antenna.

Andrew Antenna

RFS SBI Type


RFS C Type

January 14, 2007 NEC Corporation 2007 33

Installation: ODU Mounting


Using HYB

Step1: Fix the bracket the handle to the HYB Used


for 11-52GHz ODU

Step2: Check the polarization and install the HYB to the antenna by
tighten the screw. (four locations)

January 14, 2007 NEC Corporation 2007 34

17
2007-01-14

Installation: ODU Mounting


Using HYB

Step3: Insert the O-rings to the two ODU ports of


the HYB

Note: Be careful not to damage the O-ring. Step4: Install the two ODUs with HEX screws (four
locations) using the Allen Key wrench.

January 14, 2007 NEC Corporation 2007 35

Installation: ODU Mounting


Feeder Connection

Step: Mount a waveguide to the ODU, Fix the


waveguide to the ODU with four bolts

Note: Be careful not to damage the O-ring. Note:


Use suitable flange adapter between ODU and
Waveguide type ODU waveguide depending on the waveguide type.

January 14, 2007 NEC Corporation 2007 36

18
2007-01-14

Installation: ODU Mounting


Feeder Connection
Step1: Mount the attachment with adapter to the
ODU bracket.
bracket
Setp2: Loose nuts and remove the two U-Bolts
from the ODU bracket.

Step3: Mount the ODU bracket to the pole with two


U-bolts.
Step4: Mount the ODU to the ODU bracket with
attached four bolts.

Direct mount type ODU

January 14, 2007 NEC Corporation 2007 37

Installation: ODU Mounting


Feeder Connection
Step5: Make sure that the ODU and the ODU
bracket are fixed at specified place
Setp6:Mount the waveguide to the ODU four bolts.

Note: Be careful not to damage the O-ring.

Direct mount type ODU

January 14, 2007 NEC Corporation 2007 38

19
2007-01-14

Installation: Frame Grounding

Connect the Frame Ground (G) terminal on the IDU to the Mounting rack
with the earth cable. In addition, connect the mounting rack to the
indoor earth terminal with the earth cable and connect the G terminal
on the ODU to the ground.

January 14, 2007 NEC Corporation 2007 39

Installation: Frame Grounding


1.Install the ODU within the area protected
by lightning rod.
rod
2. To avoid surge currents caused by
lightning circulating in the equipment earth
system. Connect the equipment earth system
(frame ground) to ground of the lightning
rod at ground level.

This connection is an example

January 14, 2007 NEC Corporation 2007 40

20
2007-01-14

Installation: Frame Grounding


NEC recommends that frame ground of ODU
should be connected to earth line.
line

This connection is an example

January 14, 2007 NEC Corporation 2007 41

Installation: Waterproof Protection


Before connecting the IF cable between the
IDU and ODU, using the circuit tester, check
the that the resistance of the I/F cable
between center conductor and insulation is
more than 100MΩ

These parts should be wrapped the self-


bonding tape tightly, Twice or more around the
IF cable connector and IF IN/OUT connector of
the ODU for waterproof.

January 14, 2007 NEC Corporation 2007 42

21
2007-01-14

Installation: Waterproof Protection

Before connecting the IF cable between the


IDU and ODU, using the circuit tester, check
the that the resistance of the I/F cable
between center conductor and insulation is
more than 100MΩ

January 14, 2007 NEC Corporation 2007 43

Installation: Cable Termination

Step2: Set the socket contact to position 1


or 2 of the hand crimping tool.

Step1: Remove 3.0 to 3.5 mm of insulation

January 14, 2007 NEC Corporation 2007 44

22
2007-01-14

Installation: Cable Termination

Step3: Squeeze the handle of the hand


crimping tool. Insert cable into socket
contact

Step6: Insert the socket contacts into the power


connector until they lock.
Step4: The cable should fit, So insulation
and bare wire are arranged as shown.
Squeeze the handle of the hand crimping
tools until the ratchet is released
January 14, 2007 NEC Corporation 2007 45

Installation: Wiring and Forming


1.Connect cables for ,Signal Interface, Power
supply, IF IN/OUT and ground to the proper
connector of the IDU.
2. Fix the cables using cable binder to the rack
as like as indicated position.

1.Don’t cross the cables on front of indicators and


power switch used for maintenance.
2. Take suitable bend radius to wiring the IF cable.

January 14, 2007 NEC Corporation 2007 46

23
2007-01-14

Initial Lineup: Safety Information

January 14, 2007 NEC Corporation 2007 47

Initial Lineup: Safety Information

January 14, 2007 NEC Corporation 2007 48

24
2007-01-14

Initial Lineup: Safety Information

January 14, 2007 NEC Corporation 2007 49

Initial Lineup: Start-Up


Procedure for 1+0 System:
Step1: Check that the IF cable between the MODEM and the ODU is firmly
connected.
Step2: Before connecting the power cable connector to the MODEM, check that the
SELV input voltage is -48V (allowable range:-40.5V to -57V) with the digital
multimeter.
Step3: Pull out the PWR switch level and turn on.
Step4: Confirm that the PWR indicator on the MODEM is ON

Procedure for 1+1 System:


Step1: Check that the IF cable between the No.1 MODEM and the No.1 ODU is
firmly connected.
Step2: Before connecting the power cable connector to the No.1 MODEM, check
that the SELV input voltage is -48V (allowable range:-40.5V to -57V) with the
digital multimeter.
Step3: Pull out the PWR switch level and turn on.
Step4: Confirm that the PWR indicator on the No.1 MODEM is ON
Step5: Repeat step 1 to 3 for No.2 MODEM.
Step6: Confirm the PWR indicator on the No.2 MODEM is ON.

January 14, 2007 NEC Corporation 2007 50

25
2007-01-14

Initial Lineup: Shut Down


Procedure for 1+0 System: Warning:
Step1: Pull out the PWR switch lever on the MODEM and turn off the PWR switch.
switch After turningg ON the equipment,
q p , wait at least 1
Step2: Confirm that the PWR indicator on the MODEM is off. minute before turning it OFF again. Repeatedly
turning the power ON and OFF within a short
interval may cause the IDU/ODU to fail.

Procedure for 1+1 System: Note:


Step1: Pull out the PWR switch lever on the corresponding MODEM is to be shut When turn OFF the IDU and ODU in 1+1
down, then turn off. configuration, turn OFF power for standby side
Step2: Confirm that the PWR indicator on the MODEM is OFF. first, then working side.
Step3: Pull out the PWR switch lever on the other MODEM, then turn off. When turn OFF the IDU and ODU in working
Step4: Confirm that all LED indicators on IDU are OFF. channel only,y, switchover the workingg to standbyy
channel with TX and RX SW using LCT.

January 14, 2007 NEC Corporation 2007 51

Initial Lineup: Initial Setting


Note:
q p
The “Equipment Setup”
p must be set properly
p p y
every items before “Provisioning” Setup.

The “Provisioning” setup must be performed


based on the “Equipment Setup”

January 14, 2007 NEC Corporation 2007 52

26
2007-01-14

Initial Lineup: Equipment Setup


Following Equipment Setup Items for PDH/SDH system
1.User Interface
2.Redundancy
3.Main(work)
4.SUB(Port)
5.APS Function (for SDH APS only)
6.Modulation Schema
7.Transmission Capacity
8.TX Start Frequency
9.TX Stop Frequency
10.Shift Frequency
11.Upper/Lower
12.SUB BAND
13.TX RF Frequency
14.RX RF Frequency
15. Frame ID
16.TX Power Control
17.LAN Port Usage (for LAN transmission only)
18.LAN Capacity (For LAN Transmission only)

January 14, 2007 NEC Corporation 2007 53

Initial Lineup: Provisioning Setup


For SDH
Following Provisioning Setup Items for SDH system
1.BER Threshold Setting
2.SUB Interface ( For WS/LAN Transmission only)
3.SC Assignment
4. STM-1 Setting
5. TX Power Control (Set to required TX Power level in MTPC mode when it is
going to perform the Antenna Orientation.)
6. Condition for TX/RX SW
7.Condition for APS
8.Relay setting
9.TCN Threshold(15min)
10.TCN Threshold(1 day)
11.PMON Select
12. Other (Optional items)

January 14, 2007 NEC Corporation 2007 54

27
2007-01-14

Initial Lineup: Antenna Orientation


Antenna Orientation Procedure:
1. Connect the PC to the LCT port on the NEO IDU Using USB cable.
2. At each station, set “Maintenance1” from Maintenance in LCT *1
3. Click and select for the following control items in “Maintenance1” *2
TX SW Manual Control: Fix No.1 or No.2
RX SW Manual Control: Fix No.1 or No.2
TX Power Control: MTPC In Equipment Setup
Antenna Alignment Mode: Select On. *3
4. At receiving station, remove a cap from the RX LEV MON Jack
5. At each station connect the digital multimeter or Pasolink Monitor to the
RX LEV MON jack on the ODU.
6. At each Station, adjust the azimuth and elevation angle of the antenna
alternatelyy so that the measured voltage
g becomes maximum.

*1 .In Maintenance “on” condition, every external Alarm output are masked and remote control can not be performed.
*2. Retain the present status for other control items
When the TX power control mode is set to ATPC, set it to MTPC and required level for the Pasolink link on the “Equipment setup” and “Provisioning”.
*3. Set NO.1 or NO.2 which is the same side fixed by TX SW and RX SW in 1+1 configuration)
Note: In order to measure exact performance of AGC V, it is mandatory required to set Alignment Mode to On.

January 14, 2007 NEC Corporation 2007 55

Initial Lineup: Antenna Orientation


The relation of the RX Input Level versus RX Level MON (V) is shown below.

1.It is necessary to set to the Antenna Alignment Mode using PC for LCT when
monitor the RX level.
2.The RX LEV MON terminal on the ODU
3.The RX LEV MON terminal must be capped for waterproof.

January 14, 2007 NEC Corporation 2007 56

28
2007-01-14

Initial Lineup: Lineup Test


Line up test items for between two stations are listed in below.

Item

1. Orderwire Test

2. TX/RX Switchover Operation

3. DADE Adjust

4. BER Measurement

5. Meter Reading

January 14, 2007 NEC Corporation 2007 57

Initial Lineup: Orderwire Test


Orderwire Test Procedure.

Step1: Connect headset to the EOW jack on the IDU.


Step2: Press the CALL button on the IDU.
Requirement : at the opposite site, the buzzer on the
IDU sounds.
Step3: Check that the orderwire can be used between two
stations with headsets.
Step4: Disconnect headset from EOW jack on he IDU at each
station.

January 14, 2007 NEC Corporation 2007 58

29
2007-01-14

Initial Lineup: TX/RX SW


Switchover Operation
TX/RX SW Switchover Operation
(only is performed in 1+1 configuration)

Step1: Connect the PC to the LCT port on the NEO IDU.


Step2: Login LCT
Step3: Click “Maintenance “ button in the LCT MENU, select
“Maintenance 1” on background menu.
Step4: Select “On” of the Maintenance setting button and
click on “Set” button.
Step5: Select “No.1” or “No.2” of TX SW setting button and
click on “Set” button.
Step6: Select “No.1” or “No.2” of the RX SW setting button
and click on “Set” button.
Step7: Check that the “Value” box for each item turned to the
required status.

January 14, 2007 NEC Corporation 2007 59

Initial Lineup: DADE Adjustment


DADE Adjustment: The DADE adjustment is needed in initial lineup or when the IF cable is
(only is performed in 1+1 configuration to adjust delay time for RX hitless replaced. It is not needed readjustment when the INTFC status is indicated
switching when the INTFC status is indicated Outphase) In phase
In-phase.
DADE: Automatically adjust delay time based on either No.1 signal or No.2
Step1: Connect the PC to the LCT port on the NEO IDU. signal which it is selected by RX SW under the outphase condition of the
Step2: Login LCT INTFC STATUS. The DADE control is processed assuring no interruption of
Step3: Click “Maintenance “ button in the LCT MENU, select “Maintenance 1” traffic.
on background menu. Offset DADE: Automatically adjust delay time based on either No.1 signal or
Step4: Select “DADE Adjust” on the “Maintenance1” table. No.2 signal which it is selected by RX SW under the outphase condition of
Step6: Click on setting button “DADE”, “Offset DADE” or “DADE Off” and the INTFCA Status. Since the offset memory minimizes the latency delay.
Click on “Set” button. traffic interruption occurs at that moment. This Offset DADE controls the
delay time difference to a minimum than DADE control.
DADE Off: Set when DADE function is not used. For Particularly, when low
bit rate (10 to 20MB) transmission is applied to the system, the DADE
control is not required.

January 14, 2007 NEC Corporation 2007 60

30
2007-01-14

Initial Lineup: BER Measurement


BER Measurement (Electrical Interface)
(In 1+1 system, BER Measurement of both No.1 and No.2 channels should
be performed between terminal stations.)
stations )

Step1: At the transmitting end, disconnect STM-1 signal cable from the
STM1 IN connector on the STM-1 INTFC.
Step2: At the receiving end, disconnect the STM-1 signal cable from the
STM1 out connector on the STM-1 INTFC.
Step3: At both transmitting and receiving ends, set the STM/SONET
Analyzer as follows:
STM-1 INTFC (Electrical)
Bit rate: 155.52 Mbps
,
Code format: STM-1,CMI
Level: 1.0 Vp-p
Impedance: 75 ohms, Unbalanced.

January 14, 2007 NEC Corporation 2007 61

Initial Lineup: BER Measurement


BER Measurement (Electrical Interface)
(In 1+1 system, BER Measurement of both No.1 and No.2 channels should
be performed between terminal stations.)
stations )

Following steps are for 1+1 system:


Step4: In HS system, set the TX SW to No.1 or No.2 to on condition at
transmitting end.
Step5: At receiving end, set the RX SW to either No.1 or No.2 to on
condition.
Step6: Measure BER and confirm that the values are indicated as follows:
requirement 1×10 -12 or less.
Step7: At received end , change setting of the RX SW to opposite No.1 or
No.2 from it in step5 and confirm that the measured value satisfies
requirement given in step6.
step6
Step8: Change setting of the TX SW to opposite No.1 or No.2 from step4 and
confirm that the measured value satisfies requirement given in step6.
Step9: At receiving end, change setting of the RX SW to opposite No.1 or
No.2 from step 7 and confirm that the measured value satisfies requirement
given in step6.
Step10: Restore all connections and control status to normal.

January 14, 2007 NEC Corporation 2007 62

31
2007-01-14

Initial Lineup: BER Measurement


BER Measurement (Optical Interface)
(In 1+1 system, BER Measurement of both No.1 and No.2 channels should
be performed between terminal stations.)
stations )

Step1: At the transmitting end, disconnect OPT cable from the STM-1 IN
connector on the STM-1 INTFC.
Step2: At the receiving end, disconnect the OPT cable from the STM-1 out
connector on the STM-1 INTFC.
Step3: At both transmitting and receiving ends, set the STM/SONET
Analyzer as follows:
STM-1 INTFC (Electrical)
Bit rate: 155.52 Mbps
,
Code format: STM-1,NRZ
Level: S-1.1 L-1.1
In -8 to -28dBm -10 to -34 dBm0
Out -8 to -15dBm 0 to -8 dBm
Wavelength:
In: 1310nm
Out: 1310nm

January 14, 2007 NEC Corporation 2007 63

Initial Lineup: BER Measurement


BER Measurement (OPT Interface)
(In 1+1 system, BER Measurement of both No.1 and No.2 channels should
be performed between terminal stations.)
stations )

Following steps are for 1+1 system:


Step4: In HS system, set the TX SW to No.1 or No.2 to on condition at
transmitting end.
Step5: At receiving end, set the RX SW to either No.1 or No.2 to on
condition.
Step6: Measure BER and confirm that the values are indicated as follows:
requirement 1×10 -12 or less.
Step7: At received end , change setting of the RX SW to opposite No.1 or
No.2 from it in step5 and confirm that the measured value satisfies
requirement given in step6.
step6
Step8: Change setting of the TX SW to opposite No.1 or No.2 from step4 and
confirm that the measured value satisfies requirement given in step6.
Step9: At receiving end, change setting of the RX SW to opposite No.1 or
No.2 from step 7 and confirm that the measured value satisfies requirement
given in step6.
Step10: Restore all connections and control status to normal.

January 14, 2007 NEC Corporation 2007 64

32
2007-01-14

Initial Lineup: Meter Reading


Meter Reading

Step1: Connect the PC to the LCT Port on the NEO IDU.


Step2: Login LCT
Step3: Click “Metering” button in LCT Menu.
Step4: The values of Metering items are displayed as follows.

1+0 Configuration

1+1 Configuration

January 14, 2007 NEC Corporation 2007 65

End
Thanks!

January 14, 2007 NEC Corporation 2007 66