Вы находитесь на странице: 1из 34

This document provides the mobiltel project in Sri Lanka .

if the Security Level:


customer contain request, take the request of the customer as standard. Internal

1 Prepare period .......................................................................... 3

1.1 Check and open the goods box .............................................. 5

1.2 Check the antenna ............................................................... 6

1.3 Check the IDU/ODU ............................................................. 8

1.3.1 ODU ........................................................................... 10

• • • • • • • • • • HYBRID• •option,1+1config• •......................................... 10

• • • • • • • • • • • • • •.............................................................................
•• 11

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •..........................................
• • • • • • • • • • • • • • • • • • • • • • • • • • • • 12

• • • • • • • • • • • • • • • • • • • • • • • • • • • •..........................................................
•••••••••••••••• 12

1.4 Check 19inch rack (option) ................................................. 14

1.5 Check IF cable................................................................... 14

1.6 Check the install assistant................................................... 15

2 Install process ........................................................................ 17

2.1 Settle an antenna direction ................................................. 17

2.2 Hang the rope ................................................................... 17

2.3 Mount pole assembly.......................................................... 18

2.4 Antenna assembly ............................................................. 19

2.5 Install ODU and Hybrid ....................................................... 19

2.6 Install antenna mount ........................................................ 21

2.7 Hoisting antenna mount and install ...................................... 22

2.8 Hoist and install the antenna ............................................... 23

2.9 IF cable connecter ............................................................. 23

2.10 Hoisting the IF cable. ......................................................... 24

2.11 ODU and IF cable grounding................................................ 25

2.12 Install 19inch rack. ............................................................ 27

2.13 Install the breaker ............................................................. 28

2.14 Install IDU and I/O Board ................................................... 28

2.15 Lay DC power cable ........................................................... 29

2.16 The hardware quality check................................................. 31


2007-08-26 HUAWEI Confidential Page1, Total34
This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.17 Align the antenna .............................................................. 31

2.18 The test form .................................................................... 33

2.19 Finish work ....................................................................... 34

2007-08-26 HUAWEI Confidential Page2, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

1 Prepare period

1. Obtains the information from each mold piece implement manager:

Install a plan and design document.

3G machine cabinet key.

Customer and subcontractor contact information.

The vehicle number and the driver contact method.

2. With customer’s confirmation :1)have the construction condition: site room• •

power• •light• •tower, 2• •enter a station permission,3• •obtain Shelter key.

3G cabinet key

Shelter key

Design

3. Informed subcontractor the install plan, confirming whether equipment have

already arrived the site, subcontractor arrive site time, subcontractor

prepare as follows tool:

Laptop, the test cable, the test software and other adapters

Temporary battery(-48V) or the AC/DC conversion machine

General tool etc

Special tool: Auger, percussive drilling.

2007-08-26 HUAWEI Confidential Page3, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

AC/DC conversion machine Auger( for GI pipe) Percussive drilling

General tools

4. Enter the site notify the customer, and also needing notice to customer while

leave site; after work to be on the site carry on sweep.

5. The engineering should hand over the report after complete.

2007-08-26 HUAWEI Confidential Page4, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Check goods:

According to design document, carry on a check to the site goods, ensuring

the integrity of the equipment and installing of exactitude .One site orders to

include several hops microwave, need to check the goods every hop, the

equipments install and designs consistently.

1.1 Check and open the goods box

One hop microwave include two sites, each site include 6 parts: 1, Antenna,

2, microwave main equipment , 3, 19 inch rack , 4, IF cable, 5, headquarters

purchase assists material , 6, local purchase assists material.

The material from headquarter as follows:

Water proof tape

PVC tape
19 inch rack
IF cable grounding cable

IF cable (500m)
0.6m 0.3m

MW main equipment

Open the box checks goods, checking the goods model type (the usage

frequency, site type<H, L>) and quantity consistent with design.

Checks and carries on identify the goods by the big box label, the casket

label, and the goods marking stepwise.

2007-08-26 HUAWEI Confidential Page5, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

1.2 Check the antenna

Check the antenna model number according to the design document


Obtain the antenna model number
from the Link Information of the
design document ,for example the
WTG-03-21D ,the WTG represents
the high performance antenna ,03
represent the diameter
0.3meter,the 212D represent the
frequency 23G
Big box label 1
1. Microwave-Antenna-NEC-PUTIA
N-18G-600mm-HP-Single
Polarization-Direct Mount is the
antenna parameter
description.
2. WTG06-177D is antenna model
number.
with design document
consistently
Big box label2
1. 18GHz(17.7-19.7GHz)ANTENNA
(HIGH PERFORMANCE, SINGLE
POL.) is the antenna parameter
2. WTG06-177DAR is antenna
model number.

Antenna label
WTG06-177DAR, the antenna model
number, need label is consistent with
the outside box.

2007-08-26 HUAWEI Confidential Page6, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Check the antenna accessory well-found, the accessories of 0.3 meter and 0.6

meter diameter is as follows:


Big box label:
1. REFLECTOR AND HANGING
BRACKET ASSEMBLY
2. ANTI-FALL CLAMP ASSEMBLY
3. ANTI-SEIZE GREASE
4. VASELINE GREASE
5. ALLEN WRENCH (8mm)
6. ALLEN WRENCH (5mm)
7. INSTALLATION MANUAL
8. ADHESIVE TAPE
9. SILICON RUBBER

Water proof glue


Silica

Accessory

Hexangular wrench

0.3m antenna

Install manual

Anti-fall clamp

Clamp

2007-08-26 HUAWEI Confidential Page7, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Clamp Anti-fall clamp

1.3 Check the IDU/ODU

Check the IDU/ODU model number and inspect accessory according to the

design document. IDU/ODU and accessory pack in the big box, being

divided into a few caskets in the big box. Check a big box label first.
The demand of check the IDU notice:
1. 1+0/1+1 protect type, adopt
different equipment.
2. Capacity, the PDH 4E1, 8E1,
16E1, SDH 155M etc, adopt
different equipment.
The demand of check the ODU notice:
1. frequency
2. sub-band
3. high or low site
4. 1+0 need 1 ODU,1+1 need 2 ODU
and Hybrid
Can search related information
from the design document, for
example
1. Radio Model: Paso link 23G 17MB
(V4)
2. TX Channels:
23BB3H…../23BB3L…….
Explain the ODU 23G, Sub band B,
“23BB3H” the H represent a high site,
IDU is 17 MB, namely 8E1 DH.

2007-08-26 HUAWEI Confidential Page8, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Big box label1


For example:
1. Microwave
ODU-pasolink-23G-1232MHz-S
ub Band B-HIGH Site
Frequency, Sub Band, High/low
site and designs are consistent,
the quantity and 1+1/1+0
decision.
2. Microwave-IDU-PASOLINK-16E1-
1+1-120ohm-E1
INTERFACE-RS232 PM CARD
The capacity, 1+1/1+0 with
design consistently.
3. Microwave accessory, Material for
IDU.
To be in accordance with the
IDU model number
4. Microwave Accessory-N Type
Connector ……
1+0 IDU need 1 set,1+1 IDU
need 2 set
5. Microwave
Accessory-HYBRID-NEC ……
1+1 type need
6. Microwave Accessory-I/O
BOARD-NEC ……
PDH type need
Big box label 2
For example:
1. TRP-18G-1B(S.F.1010, SUB
BAND D, TX/LOW)
2. TRP-18G-1B(S.F.1010, SUB
BAND D, TX/LOW)
3. MDP-150MB-1AA(OPT,1+1,128Q
AM)
4. IDU INSTALLATION MATERIALS
(OPT, 1+1, NEO)
5. HYBRID FOR 18GHZ

2007-08-26 HUAWEI Confidential Page9, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Can see a few caskets after open a box; include ODU, IDU, Hybrid, the

I/O Board, the accessory as follows:

1.3.1 ODU

Casket label:
For example:
Microwave ODU-Pasolink-23G-1232Mhz-Sub
band B-LOW site
Label with the big box and design consistently.

ODU label:
For example:

Frequency, SUBBAND, high and low site label


with the outside box and design consistently

• • • • • • HYBRID•
•••• •option,1+1config• • • •

Casket label:
For example:
Microwave Accessory- HYBRID – NEC ……
18GHZ
Notice the Hybrid has the frequency request,
frequency with design consistently.

2007-08-26 HUAWEI Confidential Page10, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Hybrid label:

23G HYBRID

••••••••••••••

Casket label:
For example:
Microwave-IDU-PASOLINK-16E1-1+1-120
ohm-E1 INTERFACE-RS232 PM CARD
with the big box and design consistently

SDH 1+1 • •155M • •IDU

PDU 1+1 • •34M• • IDU

2007-08-26 HUAWEI Confidential Page11, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••

Casket label:
For example:
Microwave Accessory-I/O BOARD-NEC ……
With the big box consistently.

I/O Board:
1. Transfer D sub Interface to BNC
Interface
2. I/O BOARD.

••••••••••••••••••••••••••••••••••••••••••

Casket label:
For example:
1. Microwave Accessory, Materials
for IDU-NEC, Guilin
NEC-Pasolink-16E1-1+1-75
ohm-Installation Materials. It
mainly includes signal cable, PWR
cable, GRN cable and connectors.
2. Microwave Accessory- N Type
Connector, NEC, Guilin
NEC-N-TYPE- It includes two

2007-08-26 HUAWEI Confidential Page12, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

connectors, one is straight type


Connector, and another is L-type
connector.
With big box consistently.

ODU grounding cable

Tie

Power cable

Label

Order wire Optic patch cord

IDU grounding cable


(H L)connecter
Lug bolt

Water proof tape/PVC tape

BNC connecter

BNC connecter IDU grounding


N connecter(L• •H) bolt
Lug bolt

Water proof tape/PVC tape LC/LC optic patch cord

Label

2007-08-26 HUAWEI Confidential Page13, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

1.4 Check 19inch rack (option)

1.5 Check IF cable

Casket label:
8D-FB-COAXIAL CABLE 500m
IF cable length is decided by the antenna
high, outside cable track and indoor cable
track length

2007-08-26 HUAWEI Confidential Page14, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

1.6 Check the install assistant

Check the install assistant whether well-found; include as follows a few

materials, need the check quantity and model number:

Mount pole

DC power cable
Bracket

Use: fix microwave antenna User: the outdoors 3G cabinet supply


The quantity and model number: each microwave power cable.
antenna needs 2-3 bracket,1 mount pole, The quantity and model number: the blue
according to the antenna size and the tower and black power cable is a one for each, the
type check the mount pole and bracket diameter 25mm; the length is decided from
model number. the shelter to the 3G cabinet and the cable
track length.

GI pipe

GI bend

User: protect outdoors DC cable. User: connecter the GI pipe.


The quantity and model number: check the The quantity according to the GI pipe road,
GI pipe length according as distance from generally at least 4 sets.
3G cabinet to shelter.

2007-08-26 HUAWEI Confidential Page15, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

DC PVC pipe Breaker

User: protect the DC cable from GI pipe to User: protect the microwave equipment.
3G cabinet. The quantity and model number: one hop
The quantity and model number: 3G need 2 DC breakers, the electric current is
construction surplus material is then. 10A. One site need a total DC breaker, the
electric current is 32A.

Breaker bus

Grounding connecter

User:breaker bus fixedly the breakers in User:the ODU grounding conncoter to tower.
the 19 inchs rack. The quantity:each ODU allots one clamp.
The quantity:breaker bus needs number is
1, the length is 19 inchs rack width.

Water roof tape IF cable grounding cable

User:used for the outdoors watertightness User:used for IF cable outdoors ground
deal with contact. cable.
The quantity:just the right amount of. The quantity:each IF cable need 3 ground
cables at least.

2007-08-26 HUAWEI Confidential Page16, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

PVC tape

User:used for dealing with contact to


insulate and protect.
The quantity:just the right amouny of.

2 Install process

2.1 Settle an antenna direction

According to the design document, ascertain the azimuth angle installed

antenna by compass (the choice keep off the position of the tower body), and

ascertain the mount pole direction and height.

2.2 Hang the rope

Settle the pulley and rope fixed to tower, antenna and accessory will hoist to the

appointed position through the pulley.

2007-08-26 HUAWEI Confidential Page17, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.3 Mount pole assembly

The level test

The bolt fix sequence: spring washers, flat


washers and two nuts, one are tight nut the
other is lock nut.

2007-08-26 HUAWEI Confidential Page18, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.4 Antenna assembly

According to the design document to ascertain antenna polarization(vertical

polarization ,horizontal polarization)

antenna polarization is

vertical at leaving factory

H (horizontal polarization) V (vertical polarization)

2.5 Install ODU and Hybrid

The feeder needs to make waterproof with Hybrid


silica.

2007-08-26 HUAWEI Confidential Page19, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Fix the antenna and Hybrid

Open the Hybrid block

Fix (1+1) ODU.

2007-08-26 HUAWEI Confidential Page20, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Notice• •The Hybrid is vertical polarization mode at leaving factory. IF the design

document is horizontal polarization, need to adjust the polarization. As follows

diagram:

V (vertical polarization) H (horizontal polarization)

2.6 Install antenna mount

Install the bracket in the ground, each clamp


fix one bolt.

2007-08-26 HUAWEI Confidential Page21, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.7 Hoisting antenna mount and install

Through the settle pulley to hoist the antenna Some persons pull to move (or pull with
mount to install position. windlass).

1-2 person lead the tail rope control the Fixed the rope on the tower while the
antenna does not impact the tower. antenna mount arrive the design height..

2007-08-26 HUAWEI Confidential Page22, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.8 Hoist and install the antenna

0.3m antenna install(the antenna place on 2.0m antennas install.


ground should add a protection mat)

1.2m antenna fix. Fix completion.

2.9 IF cable connecter

Check the IF cable short Tie up to around PVC tape Use the plastics protect IF
protection. cable connecter.

2007-08-26 HUAWEI Confidential Page23, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.10 Hoisting the IF cable.

Rolling IF cable under the tower. Lead the IF cable top tower.

IF cable connecter to IDU, tie up to round


with waterproof tape and PVC tape.

2007-08-26 HUAWEI Confidential Page24, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.11 ODU and IF cable grounding

IF cable need difference 1, 2, 4 point connect IF cable and ODU grounding cable.
ground, IF the cable length is more than 60m
and need the 3 point connect ground.

ODU connecter.

The ODU ground cables connect to ground bus


bar and the cable length is less than 10
meters. This is NEC install standard about the
ODU ground cable.

2007-08-26 HUAWEI Confidential Page25, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

ODU ground cables connect to ground bus bar. ODU ground cables connect to tower. (The
(The ground cable length from ODU to the ground cable length from ODU to the ground
ground bus bar is less than 10 meters). bus bar is more than 10 meters, notice the
This is the mobiltel project install standard connecter point need rustproof). This is the
about the ODU ground cable. mobiltel project install standard about the
ODU ground cable.

Complete IF cable ground. Use the PVC and waterproof tape protection
the ODU connecter.

IF cable ground fixed to tower (connecter IF cable the 3rd ground point.
point need rustproof)

2007-08-26 HUAWEI Confidential Page26, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.12 Install 19inch rack.

Assembling rack, fix the flat ground cable The vertical error of cabinet should be less than
on the rack back side. 5mm.

Rack ground cable connects to Shelter bus


bar.

2007-08-26 HUAWEI Confidential Page27, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.13 Install the breaker

The 1st is main breaker, the 2nd, 4th for IDU power supply, the 3rd 5th for another IDU power
supply. A is DC bus, B is DC breaker bracket.

2.14 Install IDU and I/O Board

Traffic cable should separate with power cable .Paso linkv4 (1+1)

2007-08-26 HUAWEI Confidential Page28, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Paso link neo 2*(1+0)

Adjust the IDU resistance. (75ohm, 120ohm). Install power cable, the equipment power
cable connect to the breaker top.

2.15 Lay DC power cable

The DC power cable lay from the outdoors type 3G cabinet, the power cable

needs to use the GI pipe protection enter the Shelter

Ditch. Manufacture the GI pipe of the suitable


length.

2007-08-26 HUAWEI Confidential Page29, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Need specialized tool. The GI pipe connecter.

Install GI pipe. Waterproof tape.

Power cable entrance

Open the bolts and install power cable.

3G machine cabinet internal structure.

Link the power cable at the 10th, 11th point and ground bus.

2007-08-26 HUAWEI Confidential Page30, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

The Switch5 and Switch7 control the Install power cable.


Terminal and Terminal 11

2.16 The hardware quality check

Request the subcontractor to carry on indoor and outdoor hardware quality

self-inspection. Especially the ground part, ODU, IDU, IF cable ground; the

power cable connect whether exactitude and the voltage is normal or not.

2.17 Align the antenna

IF can’t install permanent power supply, can use the battery or AC/DC

conversion. Check the power short and voltage before power on, this project

microwave use -48V direct current.

Use laptop set parameter, need to be prepare User multimeters check the signal level.
Pnmt Cable• •LCT Cable.

2007-08-26 HUAWEI Confidential Page31, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

Adjust 1.2 m antenna azimuth angle. Adjust 0.3 m antenna azimuth angle

Antenna mount 1:
The 1st is vertical adjustable screw of vertical
angle adjuster; the 2nd is azimuth adjustable
screw of azimuth adjuster..

Antenna mounts 2: The 1st is azimuth Down diagram.


adjustable pole of azimuth adjuster; the 2nd is
vertical adjustable screw of vertical angle
adjuster..

2007-08-26 HUAWEI Confidential Page32, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.18 The test form

Align the antenna finish, completion the test document, is shown as

below:

Project Name HUAWEI NEC M/W

Customer Name MOBITEL

Test Date 2007-8-25 Hop Number COL001-COL002

Microwave Type pasolinkv4/pasolink neo Capacity 155M/34M/17M/8M

Protect Type 1+1/1+0

Site Name and Site Type

Frequency 7143Mhz 7303Mhz

Antenna diameter(Polar) 1.6M ,H 1.6M,H

Local Site IDU Module Local Site ODU Module Opposite site IDU Module Opposite site ODU Module

MDP-34M-26C TRP-7G-3A MDP-34M-26C TRP-7G-3A

Local Site IDU Serial


Local Site IDU Serial Number Local site ODU Serial Number Local site ODU Serial Number
Number

IDU1:15623 ODU1:6734 IDU1:15622 ODU1:7622

*IDU2: *ODU2: *IDU2: *ODU2:

System Test

Check
Item Design Result Item Design Result Check Result
Result

ODU1 Receive Level -34.00dBM -34.5dBm *ODU2 Receive Level -34.00dBM -34.5dBm

ODU1 Transmit Power 23dBm 22.5dBm *ODU2 Transmit Power 23dBm 22.5dBm

ODU1Power Supply(v) -53V *ODU2 Power Supply(v) -53V

Order Wire Function Check Yes/No Switch Over Test for 1+1 Yes/No

BER Test Yes/No

Remark:

Customer representative: Date:

Huawei representative: Date:

Subcontractor
Date:
representative:

2007-08-26 HUAWEI Confidential Page33, Total34


This document provides the mobiltel project in Sri Lanka .if the Security Level:
customer contain request, take the request of the customer as standard. Internal

2.19 Finish work

Sweep the site after work; notify the customer, leaving the site.

All work complete, tidy up the remnant materials, recover an original.

The indoor equipments installs tidily.

The work not yet finished, need to put the goods to the suitable place

carefully, the attention defends rain, guard against theft.

2007-08-26 HUAWEI Confidential Page34, Total34