Engineering Sharing

Project NCDT Tangguh


Engineering Procurement Construction Commissioning
By ANANG WIRDIANTO
ET102640
Tangguh LNG Site
NCDT Project Feed

 BP provides Feed document


for bidding to Contractor
1. Exhibit A-M
2. AVL (Approved Vendor List)
3. MTO for permanent works
Exclude Piping
4. Site Visit report developed
by Contractor team
5. Other supported documents
Engineering Feed Back

 Contractor’s Engineering
provides MTO
 Identify Tie in point (if any)
 Conduct site survey
Site survey Scope of
 Detailing the engineering scope report Work
of work and requirement to be
provided
 Engineering shall confirm and
understand to every item which
stated in the SOW, to avoid any
Tie in Point Deliverable
miss-perception and battery limit Location List

Improvement Idea: Potential design clash to be listed and clarified to Client


Detailed Engineering Design
 Determine the engineering deliverable list
Engineering deliverable list shall be provided as per SOW such as
calculation, drawing, analysis, procedure, datasheet, requisition, etc
 Determined the official document and agreement that agreed by
Contractor and Client
 Any deviation/changes during DED shall be recorded

Calculation, drawing, MOM, TQ, TN, FDC, Document


analysis, etc Email, Letter, SI Monitoring

Improvement Idea: Tamplate to determine the Engineering Deliverable List


each discipline, tamplate of management of change
Engineering Interface
IDC
 Internal discipline check is
mandatory
 Engineering shall determined
the design priority that related
with all discipline
 Engineering logic link shall be
determined, this is to estimate Maturity
the time of documents Design
approval

Engineering Design
Logic Link
Priority
Engineering to Procurement
 MTO shall have clear information
Datasheet,
 All document deliverable’s required for Requisition,
purchasing need to be determined Specification
MTO
 Engineering and Procurement should
determined the long lead item and
priority equipment to be purchased
 Technical clarification to vendor shall is TBE
mandatory to issued TBE prior PO
 Engineering, QA, should explain the
engineering review process determined
all required document that must be
completed for FAT, SAT, and delivery to
site
 If any deviation from spec, contractor
shall inform to Client and request for Purchase Order
approval

•SDRL •Fabrication
Kick off App Doc •CTR
meeting •Doc & Dwg
Expediting •FAT
•Client
Review •Delivery
Engineering to Contract Administration
 Engineering should closely
communicate to contract
administration to anticipate if there
are any changes or deviation
 Engineer should understand the
process of change order is created
 Recording and reporting is
mandatory
 All changes shall be managed
very well. MOM, TQ or TN, Letter,
Field design Change, shall be
registered as well
Engineering to Construction
 Design engineer need to have
close coordination to Site
Constructibility,
Engineer in regards with ROS and site
constructability and interface to
site actual condition. interface
 ROS (required on site) list will
inform by site engineer to Design
engineer that become reminder
about design priority needs to Field adjustement
be execute at site and Modification
 All Engineer shall have a good
understanding in case of design
changes. New requirements,
specifications, interfaces,
request shall be managed very
well. Redline
 Engineer understand how to
prepare redline drawing prior as
built
Engineering to Commissioning
 Engineering design shall have complete
information to support the Commissioning
process until handover such as boundary
limit of the system, tagging, tie-in point,
service condition, etc
 Since detail design is started, the
commissioning team shall be incharged as
well.
 Engineering detail drawing must be shown
complete information's need due to testing.
 Vendor drawing and fabrication drawing
shall be checked and approved by client
and contractor
 Temporary material that used during testing
and commissioning shall be separated

Improvement Idea: Contractor has a Handover Certification System which


can be used to all project
Preparation to Handover

 Engineer shall determine the handover item that will be handed over to
Client
 Engineering and Vendor As Built drawing needs to be monitored

As Built
Hard & Hand
Soft File over
Final Purposes

Engineering has big Contribution as Money Maker

Thank You