kanban

OM00 - customizing Kanban & adding Replenishment Strategies

PK05 - Create a supply area per MRP Controller for the plant where Kanban has to be
implemented

MMSC - Exclude the storage location from MRP Run

PK01 - create control style - Classic / Event Driven

PK31 - Kanban Correction

Order 1560136
Line 380
Qty 4900

# kanban number
# actual quantity
# kanban status
# date and time of the last status change
To lock kanbans, select the checkbox of the appropriate kanban(s) in the Lock
column.
To delete kanbans, select the checkbox of the appropriate kanban(s) in the Delete
column.
� delivery address
If you want the delivery to be made directly to the production line, you can
specify a
precise delivery address indicating the supply area data.
To do this select Goto # Delivery address.
The plant address is already complete. Here, you can also enter the information
required for the supply area.
Further Control Data
� Separating the goods receipt from the status change and independent supply
source
In addition, you can control the separation of the goods receipt from the status
change with the field Separate GR (for further information read Separating the
Status
Change from the GR [Page 73] Posting). With the field Independent supply source
you can control whether the supply source determines the time of replenishment
and whether the replenishment element has the status �independent supply source�.
(See also: Independent Supply Source/Separation of Status Change and
Replenishment [Page 74]).
� Status sequence
You can assign a status sequence to the control cycle in the Status sequence field.
This defines the order in which the statuses are set. It also specifies whether
certain
statuses are mandatory, whether some are optional, or whether some statuses are
not allowed. For example, you can define that the statuses, IN PROCESS and IN
TRANSIT have to be set after each other, but that the status IN USE is not allowed.
You define the status sequence in Customizing for KANBAN. For further information
on status see Status Change/Kanban Signal [Page 58] and Status Sequence [Page
61] .
� One-Card KANBAN
In the one-card KANBAN system, you must define a special logic for triggering the
kanban signal. These logics are defined in the field Trigger replenishment. See
also:
One-Card KANBAN [Page 15] and One-Card KANBAN/Using a Special Logic for
Triggering the Kanban Signal [Page 68] . If you do not want the system to trigger
replenishment until a trigger quantity has been reached, you must also enter this
quantity in the Trigger quantity field.
Order 1581192
Line 50
Qty - 5000

Order no. 1575263


Line 130
Qty - 500