LAB RESULT
Measure Routine FBP Spec Measure Routine Spec
O/H Dist 90% Distil (oC) 158.8 189.6 [ 155 / 190 ############ LGO 90% SIM 386.5 395 03-11-08 07:59
Kero Flash Pt (oC) 43.5 m 38 ############ HGO Pour Pt (oC) 33.0 n/a 12-09-08 08:28
Kero Freeze Pt (oC) -47.7 [ -47 ############ HGO 90% SIM 445.0 [ 390 11-02-09 07:59
Kero 90% Distil (oC) 251.0 [ 245 ############ HGO ASTM Colour 2.5 3.0 11-02-09 07:59
Kero Mercaptan 150.2 160 ############
PRODUCT (m3/hr) MB
Off Gas (m3/hr) 189.50 MB MVGO 125 18.87 XHVGO (m3/hr) 10.0 MB
LVGO (m3/hr) 95.1 14.36 HVGO 102 15.35 Vac Residue (m3/hr) 189.1 28.54
TOTAL VGO + HGO 243.7 36.79 TOTAL VR + XHVGO 199.1 30.06
OTHER DATA
Amine Circulation Rate (m3/hr) 18.0 Oxidation Air Rate (m3/hr) 52.8
Caustic Circulation Rate (m3/hr) 4.0 Flow Rate (m3/hr)- TSN 0.47
Reformate
RATIO
Measure Actual Spec Measure Actual Spec
LPG Flow / Amine Circ. Rate 1.9 2 to 10 LPG Flow / Caustic Circ. Rate 8.6 7 to 20
LAB RESULT
Measure Routine Spec Measure Routine Spec
C2 Content (vol%) 0.12 [ 1.0 09-02-09 18:09 Cu Corr 1a 1A 23-10-08 13:39
LPG Tot C5+C6 (vol %) 0.08 [ 1.5 09-02-09 18:09 Weathering Test (oC) 0.6 -2.2~2.2 23-07-07 21:59
Sulphur Content (ppm) 116.00 [ 100 17-02-09 14:00 Residue in LPG (vol%) 0.00 0 05-08-05 09:59
CAUSTIC
Caustic Unit 26 (wt% free NaOH) <7.0 10.7 16-02-09 07:59 Lead Acetate Test No H2S Present
Latest Caustic Change-Out 11-Feb-2009 Shake Test No Colour Change
DSO (ppmwt) 576.8 13-02-09 07:59
OTHER DATA
Caustic Circulation Rate (m3/hr) 22.3 Oxidation Air Rate (m3/hr) 7.1
RATIO
Measure Actual Spec Measure Actual Spec
Naphtha Flow / Caustic Circ. Rate 1.1 4 to 10 Naphtha Flow / Oxidation Air Rate 3.4 3.8 to 6.4
LAB RESULT
Measure SC2703 Spec CAUSTIC
Mercaptan Sulfur (ppm) 8.11 <5 17-02-07:59 Caustic Unit 27 (wt% Free NaOH) 8.13 13-02 07:59
Dr Test Positive - ve 17-02 07:59 Latest Caustic Change-Out 14-Feb-09
RVP 215.0 < 180 17-02 07:59 Caustic Unit 27 (Deg Baume)-Use 20Baume
215 max as planner
Unit 28 : Kerosene Treating Unit
FEED
Kerosene Feed Rate (m3/hr) 116.6 Kerosene Thruput (%) 123.9
RATIO
Measure Actual Spec Measure Actual Spec
Kerosene Flow / Oxidation Air 2.3 3.33 Kerosene / Wash Water Flow 10.6 10
Kerosene / Caustic Flow 9.7 10
LAB RESULT
Measure SC2809 Spec Measure Routine Spec
Mercaptan Sulfur (ppm) 63.9 max 50 17-02-09 19:59 Dr Test Negative + ve 22-10-07 09:59
Saybolt Colour (filtered) 17 m 12 17-02-09 16:00 Particulate 0.35 <1.0 17-02-09 07:59
Checked previous shift's Panel Handover Report Checked previous shift's Field Handover Report
Furnace Efficiency
F21201 F21251
Excess O2 (%) 1.46 Excess O2 (%) 2.82
Draft pressure (mmH20) -3.55 Draft pressure (mmH20) -1.17
EQUIPMENT STATUS
Equipment Qty Status Equipment Qty Status
LEL Meter 1 MSA ORION A4-1565 H2S Badge 11 no battery
UNIT 21
1 Crude feed maintains at 140MB.
2 MVGO and HVGO routed back to HCK feed tank.
3 V-21251 Recovered Oil - 100% to DHT and fully close to LSO
4 V-21251 RV bypass closed.
5 V-21254 - draining system suspected clogged, pls drain using LPS drain point.
6 VDU sour water routed to desalter as U34 train #2 shutdown. 4H5 injected to P-21214 replacing NH3 to VDU.
CHEMICALS/OIL
* New chemical being used due to unavailability of the previous chemical after MOC. 7R64 replaced with 3F18, 5K1& 5K2S replaced with 5K7.
Anti Oxidant U27 - 3F28.
1 61N - BETZ fully monitor 61N injection rate. Operation responsibility is to monitor pump perfomance and stock at site.
2 Wetting agent pump was found not pumping. The pump was replaced by 61N pump.Notif raised.
3 Ammonia Haskel pump B awaiting for material for the rectification job.
4 P-21222A (main) removed out for rectification job under Betz. One spare unit installed at site but still failed as it causing pace setter to trip.
18Dec P21222B rectified by Elect(motor) and able to pump. Now injection back 16'/min to E201 and 16"/min to Desalter. Pls monitor
5 Mech AMT will replace RV of the 3F28 once the material arrive.
UNIT 24
1 Unit in steady condition. -
2 V-24208 RV bypass open.
3 24LC027 - reading faulty - RM to AMT. Inst plan to convert 24LI026 into 26LC026. OE to work for the CAF.
4 New LPG line from Unit 23 to C24202 reflux return under N2 blanket.
5 C-24203 online but no butane draw.
UNIT 26
1 Unit in steady condition.
3 Pls regularly check and compare the LG vs LI of U26 level.
UNIT 27
1 Unit in steady condition.
UNIT 28
1 Unit in steady condition.
2 Pls follow the instruction from OE regarding brine issue at V28203 and V-28202.
V28202 water wash changeout done once per shift. Do not drain until kero comeout at bottom drain as to ensure consistent water wash flow vrs kero as of Mericam.
CNU
1 Unit in steady condition.
2 Pls regularly check pH (litmus paper) versus analyser.
3 28UZA111 leaks at packing. Notification raised.
Tight-off valve located at top of the vessel is failed. To plan on next opportunity once V-28252 empty and plan for acid delivery properly.
Pls do not order the acid and let the vessel empty for UZ repair.
4 Currently both analyser is reliable and drained to OWS and isolation at suction pump was closed.
EQUIPMENT RELIABILITY
1 P-28255 under CRG.
2 P-21254B leaks at inboard seal 10 drops per minute. Switched to A as IMI advised. Highlighted to CRG and awaits for material. Till then pump A maintain on st by.
3 P21203A steam quenching line cold. IMI has checked and requested AMT to unclog. Pls liase with AMT.
4 P-21253A seal pot level loss severely and need to top up within shift. IMI to verify. Notification to raise.
5 P-21258A badly leaks thru quench steam drain. Mech seal suspect leaks. Notif raised to IMI @11Jan.
6 P21259A RV leaks at body. Pls arrange AMT to rectify. To rectify when B pump online.
7 P21259B- tested and found pump problem ,tomorrow AMT will rectified.
8 P-21202A - Under CRG for repair. Will be back on 23Feb 09.
9 K-24201- local panel display m/function, notification 20894716
Buffer gas filter element to replace.
10 K-21251B - suspected gear oil pump malfunction , pls closely monitor for filter cleaning tomorrow.
PROCESS CONCERN
1 RECAUSTICIZING OF U28 should be executed every Monday.
2 Both P-21209 A & B can be run to cater high AR flow.
3 Two strainers had been installed at outlet of V-28201.
4 Mudwash to be performed at night on daily basis for 1/2 hour duration.
5 It is advised to reduce desalting water to 3 % during crude tank switch to avoid water carry-over.
6 F-21251& F21201 :
Pls visually monitor hot spot and maintain as it is if possible.
7 Pls use separate pump for NH3 transfer from T21251 to T21207 (NH3 day-tank) and scrubber.
8 To identify steam tracing lines leak and related isolation valves, only then raise notifn.In progress.
9 Off gas from unit 19 was introduced into pipeline to PSR-1 via U21/24. PC-405 auto at SP=4.9 (OP=45%) and PC-407 at MAN fully shut.
Upstream and downstream valves of PC-407 isolated.
10 21RV-003 - still reliable as AMT but to have close monitoring by operation.
PROJECT
1 Revamp activity on going in Unit 21/24/26/27/28.
GENERAL ISSUES
1 Pls aware to inform area planner and not to raise notification for - belt wobbled/clean strainer.
2 File for bicycle maintenance record available at PS rack. Pls update in/out item.
3 Meeting
Production & Maintenance - every Tuesday @ 1030 hrs.
Maintenance backlog & planning - every wed @ 1030 hrs or refer to Ehsan, Area 2 Planner.
4 New Info: Sampling bomb is under our custodian but fittings (repair) are under lab. IF damaged mark it and send to lab.