KILANG SAWIT KEMAHANG

INSTALLATION TEST FORM

EQUIPMENT NAME :

TESTER NAME :

DATE TEST :

SPECIFICATION EQUIPMENT / MOTOR

1. Rated Voltage : ........................................


2. Rated Current : ........................................
3. Frequency : ........................................
4. R.P.M : ........................................
5. Model : ........................................
6. Series No. : ........................................
7. Power : ........................................
8. Class Insulation : ........................................

*Inspection & testing project c/w commissioning.

*The test is to be carried out on the installation of motor control is divided into two parts.

Visual Inspection Test

NO TYPE OF INSPECTION TEST READING RESULT


1 Equipment complies with a product standard
2 Equipment is correctly selected
3 Equipment is not damaged
KILANG SAWIT KEMAHANG

NO TYPES OF TEST READING TEST RESULT


(Parts One-Starter Component)
1 Insulation Test 1. RY :
2. YB :
3. BR :
4. RN :
5. YN ;
6. BN :
7. RYB + E :
2 Continuity Test 1. R L1 T1 R :
2. Y L2 T2 Y :
3. B L3 T3 B :
3 Polarity Test 1. R – U1 :
2. Y – V1 :
3. B – W1 :
4 Voltage Indicator Test 1. RY :
2. YB :
3. BR :
4. RN :
5. YN :
6. BN :

NO TYPES OF TEST READING TEST RESULT


(Parts Two-Motor Component)
1 Insulation Test 1. RY :
2. YB :
3. BR :
4. RYB+E :
2 Continuity Test 1. R,U1 U2 :
2. Y,V1 V2 :
3. B,W1 W2:
3 Polarity Test 1. R – U1 :
2. Y – V1 :
3. B – W1 :
4 Clamp Amp Test Y ∆
*starting *starting
1. R: 1. R:
2. Y: 2. Y:
3. B: 3. B:
*running *running
1. R: 1. R:
2. Y: 2. Y:
3. B: 3. B:
5 Resistance Coil Test Y ∆
1.R,U1- U2 : 1.R,U1- U2 :
2.B,V1- V2 : 2.B,V1- V2 :
3.Y,W1- W2 : 3.Y,W1- W2 :
6 R.P.M Test Y ∆

I hereby confirmed tested the installation and verified it is correct and safe to be use.

Tester signature Competent Person signature

Date : Date :