Вы находитесь на странице: 1из 3

SITE INSPECTION AND TEST

RECORD
Description: Order no.: Record no. :
MK UNDER VOLTAGE RELAY
Customer: End Client: Sheet:
Al - Babtain SEC - COA 1 of 3
Site: Panel / Designation / Location no.: Project no.:
S/S 8715 (132/13.8 kV) 14410005/00

1. GENERAL DATA AND INFORMATION :

Bay No. : _______________ Rated Voltage : ______________

Bay Name : ________________ Manufacturer :

Draw. & Sh. No. : ________________ Order No. : ______________

Designation : ______________

2. MECHANICAL CHECKS AND VISUAL INSPECTION :

ITEM DESCRIPTION CHECKED


1 Inspect for physical damage / defects. OK
2 Verify connections as per approved drawings. OK
3 Check tightness of all connections. OK
4 Check Ferrules. OK
5 Check apparatus lists. OK

3. ELECTRICAL TESTS :

A) FUNCTION TEST :

Tested by: Witnessed by:


Name Eng ./ Name Eng.
Signature & Date : Signature & Date :
SITE INSPECTION AND TEST
RECORD
Description: Order no.: Record no. :
MK UNDER VOLTAGE RELAY
Customer: End Client: Sheet:
Al - Babtain SEC - COA 2 of 3
Site: Panel / Designation / Location no.: Project no.:
S/S 8715 (132/13.8 kV) 14410005/00

B) Pickup Voltage Test :

U/V Setting Pickup Voltage Drop off Voltage


(Ph-Ph)(V) (Ph-Ph) (V) (Ph-Ph) (V)
160
180
200
220
Limits: Operate Voltage : ±5 V

C) Timing Test :

Setting Time for


Contacts Pickup Time (s)
pickup(s)

3 95-96

5 95-96

6 95-96

7 95-96

Tested by: Witnessed by:


Name Eng ./ Name Eng.
Signature & Date : Signature & Date :
SITE INSPECTION AND TEST
RECORD
Description: Order no.: Record no. :
MK UNDER VOLTAGE RELAY
Customer: End Client: Sheet:
Al - Babtain SEC - COA 3 of 3
Site: Panel / Designation / Location no.: Project no.:
S/S 8715 (132/13.8 kV) 14410005/00

Limits: Operate Time : ±10 %

4- Final Setting :-

U/V Setting Setting Time for


Pickup Time (s)
(Ph-Ph)(V) pickup(s)

200 3

Equipment used:

FREJA 300 S.NO: CAL DUE

FLUKE MULTIMETER S.NO: CAL DUE

Tested by: Witnessed by:


Name Eng ./ Name Eng.
Signature & Date : Signature & Date :