HARGA UPAH DAN BAHAN 2017

NO JENIS BAHAN

A BAHAN AGREGAT KASAR, BAHAN PELEKAT DAN BAHAN JADI


1 Pasir urug
2 Pasir pasang
3 Pasir beton
4 Batu koral
5 Batu belah
6 Batu split 2/3
7 Bata merah
8 Paving blok natural 6 cm
9 PC
10 Semen warna
11 Lem kayu putih rachol
12 Buis beton 1/2 dia 20 cm panjang 1 m
13 Rooster 20x20

B BAHAN FINISHING LABURAN PENGISI DAN ALATNYA


1 Plamir tembok setara matek/metrolite
2 Plamir kayu
3 Cat tembok setara metrolite/vinilex
4 Rool cat tembok
5 Solignum 1 Blik
6 Pint cut
7 Kuwas 3"
8 Thiner B
9 Ampelas
10 Meni kayu/besi
11 Cat kayu setara glotex
12 Cat dasar
13 Residu
14 Cat seng

C BAHAN KAYU BERIKUT BAHAN JADINYA


1 Kayu klas 3
2 Kayu balok klas I
3 Kayu papan klas I
4 Kayu papan bekisting 2/30 cm
5 Kayu papan 2/30 cm klas II
6 Kayu balok 8/12 cm klas II
7 Kayu kaso 5/7 cm klas II
8 Kayu kaso 5/10 cm klas II
9 Kayu kaso 4/5 cm klas II
10 List profil kamper 10 cm
HARGA UPAH DAN BAHAN 2017
NO JENIS BAHAN

11 Kayu jati untuk furniture

D BAHAN PENUTUP RANGKA PLAFOND


1 Bahan Plafond triplek 4 mm

E BAHAN KAYU LAPIS


1 Triplek 4mm 120 x 240
2 Triplek 6mm 120 x 240
3 GRC Board 9mm 120 x 240
4 Woodplank Board
HARGA UPAH DAN BAHAN 2017
NO JENIS BAHAN

F BAHAN LANTAI DAN PELAPIS DINDING


1 Keramik 10 x 20
2 Keramik 20 x 20 DN Putih Kw. 2
3 Keramik 20 x 20 Warna
4 Keramik 20 x 25 corak
5 Keramik 40 x 40 DN Putih
6 Closet jongkok
7 Bak air mandi

G BAHAN SALURAN AIR KOTOR (RIOLERING)


1 Grafel 20 cm

H BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U. 24 Rata-rata
2 IWF Ex DN SII
3 Kawat beton
4 Kawat Las Listrik
5 Besi begel
6 Kawat berduri
7 Pipa Galvanis Medium 2"
8 Profil Allumunium Warna 3"
9 Profil Allumunium Natural 3"
10 Profil Allumunium T
11 Skrup Fixer
12 Sealant

I BAHAN KACA
1 Kaca Polos 5 mm

J BAHAN PAKU DAN MUR BAUD


1 Paku 1 cm s/d 3 cm
2 Paku 4 cm s/d 7 cm
3 Paku 8 cm s/d 12 cm
4 Paku seng
5 Paku Skrup

K BAHAN PERPIPAAN (RIOLERING DAN ASINEERING)


1 PVC dia 1/2"
2 PVC dia 1 1/2"
3 PVC dia 4"
4 Kran 1/2"
5 Pintu fiber KM/WC
6 Floor drain
HARGA UPAH DAN BAHAN 2017
NO JENIS BAHAN

7 Tangki air 500L

L BAHAN SANITAIR DAN PERPIPAAN


1 Closet jongkok standar
2 Bahan kimia anti rayap

M BAHAN PENUTUP ATAP


1 Atas Asbes Gelombang Kecil 4 mm
2 Genteng standar
3 Genteng bubung standar
4 Seng Gelombang BJLS 25 60 x 180
5 Seng Gelombang BJLS 30 80 x 180
6 Rabung Seng
HARGA UPAH DAN BAHAN 2017
NO JENIS BAHAN

7 Papan Bubungan
8 Nok Metal Roof
9 Genteng Metal Roof (Pasir Kwarsa)
10 Seng Plat
11 Canal
12 Reng
13 Baut Kuda-kuda
14 Baut Reng
15 Dinabolt
N BAHAN ALAT PENGGANTUNG DAN KUNCI
1 Kunci Pintu
2 Grendel
3 Kait Angin Jendela
4 Engsel Jendela / pintu
5 Kunci laci

O BAHAN JADI PENAMPUNG TINJA


1 Tali ijuk

P BAHAN BAKAR DAN PELUMAS


1 Minyak Solar
2 Oil Mesran 40 SAE

Q BAHAN LISTRIK
1 TL 1x20 W
2 Lampu Pijar
3 Stop Kontak
4 Saklar tunggal
5 Saklar Double
6 Kabel NYY
7 Panel Induk
8 MCB box
9 MCB 4 A

R FURNITURE
1 Meja Murid Tunggal
2 Kursi Murid
3 Meja Guru
4 Kursi Guru
5 Lemari Kelas
6 Papan tulis
8 Kotak Sampah
HARGA UPAH DAN BAHAN 2017
NO JENIS BAHAN

UPAH KERJA
No. JENIS PEKERJAAN
1 Kepala tukang batu
2 Kepala tukang besi
3 Kepala tukang cat
4 Kepala tukang kayu
5 Mandor
6 Pekerja
7 Tukang batu
8 Tukang besi
9 Tukang cat
10 Tukang kayu
BAHAN 2017
HARGA
SATUAN
Rp.

137,000.00 M3
186,000.00 M3
195,000.00 M3
165,000.00 M3
175,000.00 M3
156,660.00 M3
550.00 Bh
78,100.00 M2
65,000.00 Kg
14,300.00 Kg
26,000.00 Kg
65,000.00 Bh
5,000.00 Bh

38,500.00 Kg
40,700.00 Kg
25,300.00 Kg
30,000.00 Bh
37,500.00 5 Ltr
18,000.00 Kg
14,200.00 Bh
26,300.00 Ltr
5,200.00 Lbr
25,900.00 Kg
59,800.00 Kg
25,800.00 Kg
12,200.00 Kg
50,000.00 Kg

156,500.00 M3
5,597,000.00 M3
5,597,000.00 M3
2,106,000.00 M3
3,406,000.00 M3
3,406,000.00 M3
3,258,000.00 M3
3,258,000.00 M3
3,258,000.00 M3
12,000.00 M'
BAHAN 2017
HARGA
SATUAN
Rp.
19,310,000.00 M3

56,000.00 Lbr

56,000.00 Lbr
82,000.00 Lbr
90,000.00 Lbr
66,400.00 Lbr
BAHAN 2017
HARGA
SATUAN
Rp.

110,600.00 M2
55,000.00 M2
87,200.00 M2
58,000.00 M2
60,000.00 M2
270,000.00 Bh
357,000.00 Bh

65,000.00 M

14,000.00 Kg
Kg
22,500.00 Kg
25,500.00 Kg
20,300.00 Kg
65,500.00 M
166,400.00 btg
65,000.00 M
50,000.00 M
35,000.00 M
400.00 Bh
20,000.00 tube

113,000.00 M2

26,500.00 Kg
14,000.00 Kg
13,500.00 Kg
1,000.00 Bh
500.00 Bh

4,092.50 M
14,927.50 M
62,275.00 M
25,000.00 Bh
420,000.00 Bh
20,000.00 Bh
BAHAN 2017
HARGA
SATUAN
Rp.
820,000.00 Bh

270,000.00 Bh
33,100.00 Lt

45,500.00 Lbr
2,200.00 Bh
4,600.00 Bh
47,800.00 Lb
59,800.00 Lb
31,200.00 Lb
BAHAN 2017
HARGA
SATUAN
Rp.
33,600.00 M
35,000.00 Lb
44,750.00 Lb
30,200.00 M
10,000.00 M3
5,333.33 M2
450.00 Bh
300.00 Bh
1,400.00 Kg

106,600.00 Bh
18,000.00 Bh
18,500.00 Bh
25,000.00 1/2 Ps
30,000.00 Bh

13,000.00 Kg

6,200.00 Ltr
35,000.00 Ltr

98,500.00 Paket
20,000.00 Bh
17,000.00 Bh
15,200.00 Bh
19,200.00 Bh
6,700.00 M1
150,000.00 Bh
66,500.00 Bh
40,000.00 Bh

240,000.00 Bh
125,000.00 Bh
864,000.00 Bh
360,000.00 Bh
1,296,000.00 Bh
345,600.00 Bh
34,400.00 Bh
BAHAN 2017
HARGA
SATUAN
Rp.

HARGA Rp. SATUAN


95,000.00 Org/hr/8 jam
95,000.00 Org/hr/8 jam
95,000.00 Org/hr/8 jam
95,000.00 Org/hr/8 jam
110,000.00 Org/hr/8 jam
70,000.00 Org/hr/8 jam
85,000.00 Org/hr/8 jam
85,000.00 Org/hr/8 jam
85,000.00 Org/hr/8 jam
85,000.00 Org/hr/8 jam
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e

1 PEMBERSIHAN LOKASI
a Pekerja org 0.1000 70,000
b Mandor org 0.0500 110,000
Total Rp
Total Harga Rp
2 1 M3 MENGANGKUT DAN PEMBUANGAN TANAH
a Pekerja org 0.3300 70,000
d Mandor org 0.0100 110,000
e Alat bantu ls 1.0000 1,000
Total Rp
Total Harga Rp
3 1 M2 PERKERASAN TANAH
a PC zak 0.0010 65,000
b Alat bantu ls 1.0000 1,000
c Pasir pasang m3 0.1300 186,000
d Pekerja org 0.2000 70,000
e Tukang batu org 0.2000 85,000
Total Rp
Total Harga Rp
4 1 M2 PEKERJAAN ANTI RAYAP
a Bahan kimia anti rayap ls 0.3300 33,100
b Pekerja org 0.0300 70,000
c Tukang batu org 0.0500 85,000
d Kepala Tukang Batu org 0.0050 95,000
e Mandor org 0.0025 110,000
f Alat bantu ls 1.0000 1,000
Total Rp
Total Harga Rp
5 1 M1 PENGUKURAN DAN PASANG BOUWPLANK
a Kayu papan 2/30 cm klas II m3 0.0087 3,406,000
b Paku 4 cm s/d 7 cm kg 0.0200 14,000
c Pekerja org 0.1000 70,000
d Tukang kayu org 0.1000 85,000
f Mandor org 0.0100 110,000
g Alat bantu ls 0.0050 1,000
Total Rp
Total Harga Rp
6 1 M3 PEK. GALIAN TANAH BIASA
a Pekerja org 0.7500 70,000
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
d Mandor org 0.0250 110,000
e Alat bantu ls 1.0000 1,000
Total Rp
Total Harga Rp
7 1 M3 URUGAN KEMBALI PONDASI DIHITUNG 1/4 DARI GALIAN
a Pekerja org 0.5000 70,000
b Mandor org 0.0500 110,000
d Alat Bantu ls 1.0000 1,000
Total Rp
Total Harga Rp
8 1 M3 URUGAN PASIR URUG
a Pasir urug m3 1.2000 137,000
b Pekerja org 0.3000 70,000
c Mandor org 0.0100 110,000
Total Rp
Total Harga Rp
9 1 M3 PAS. BATU KALI 1:5
a Batu belah m3 1.2000 175,000
b PC zak 3.4000 65,000
c Pasir pasang m3 0.5440 186,000
d Pekerja org 1.5000 70,000
e Tukang Batu org 0.7500 85,000
f Kepala Tukang Batu org 0.7500 95,000
g Mandor org 0.0750 110,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
10 1 M3 PAS. BATU KOSONG
a Batu belah m3 1.2000 175,000
b Pasir urug m3 0.4320 137,000
c Pekerja org 0.7800 70,000
d Tukang Batu org 0.3900 85,000
e Kepala Tukang Batu org 0.0390 95,000
f Mandor org 0.0390 110,000
Total Rp
Total Harga Rp
11 1 M3 COR BETON SITE MIX K. 225
a PC zak 9.2750 65,000
b Pasir beton m3 0.4986 195,000
c Batu split 2/3 m3 0.7756 156,660
d Peralatan ls 1.0000 5,000
e Pekerja org 1.6500 70,000
f Tukang Batu org 0.2750 85,000
g Kepala Tukang Batu org 0.0280 95,000
h Mandor org 0.0830 110,000
Total Rp
Total Harga Rp
12 1 KG BESI BETON TERPASANG U 24
a Besi Beton U. 24 Rata-rata kg 10.5000 14,000
b Kawat beton kg 0.1500 22,500
c Peralatan, spencer ls 1.0000 1,000
d Pekerja org 0.0700 70,000
e Tukang Batu org 0.0700 85,000
f Kepala Tukang Batu org 0.0070 95,000
g Mandor org 0.0040 110,000
Total Rp
Total Harga/10 kg Rp
Harga/1kg Rp
13 1 M2 BEKISTING DENGAN KAYU MERANTI (2 x PAKAI)
a Kayu papan 2/30 cm klas II m3 0.0180 3,406,000
b Kayu kaso 5/7 cm klas II m3 0.0100 3,258,000
c Paku 4 cm s/d 7 cm kg 1.0000 14,000
d Pekerja org 0.5200 70,000
e Tukang kayu org 0.2600 85,000
f Kepala tukang kayu org 0.0260 95,000
g Mandor org 0.0260 110,000
Total Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
Total Harga Rp
14 1 BH PONDASI FOOTPLAT 80 x 80
a Galian tanah M3 0.832 56,250
b Urugan Kembali M3 0.208 41,500
c Pasir urug M3 0.064 137,000
d Beton K-225 M3 0.283 977,260
f Besi kg 21.510 16,333
g Bekisting M2 2.200 171,718
Total Rp
Total Harga Rp
15 1 BH PONDASI FOOTPLAT 60 x 60
a Galian tanah M3 0.360 56,250
b Urugan Kembali M3 0.090 41,500
c Pasir urug M3 0.270 137,000
d Beton K-225 M3 0.120 977,260
f Besi kg 21.510 16,333
g Bekisting M2 1.200 171,718
Total Rp
Total Harga Rp
16 1 M2 PAS. BATA MERAH 1:5
a Bata merah bh 80.0000 550
b PC zak 0.4745 65,000
c Pasir pasang m3 0.0400 186,000
d Pekerja org 0.3000 70,000
e Tukang kayu org 0.1000 85,000
f Kepala tukang kayu org 0.0100 95,000
g Mandor org 0.0150 110,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
17 1 M2 PLESTERAN DINDING 1:5
a PC zak 0.1400 65,000
b Pasir pasang m3 0.0190 186,000
c Pekerja org 0.3000 70,000
d Tukang Batu org 0.1500 85,000
e Kepala Tukang Batu org 0.0150 95,000
f Mandor org 0.0150 110,000
Total Rp
Total Harga Rp
18 1 M2 ACIAN DINDING 1:5
a PC zak 0.0810 65,000
b Pasir pasang m3 0.0190 186,000
c Pekerja org 0.2000 70,000
d Tukang Batu org 0.1000 85,000
e Kepala Tukang Batu org 0.0100 95,000
f Mandor org 0.0100 110,000
Total Rp
Total Harga Rp
19 1 M2 PAS ORNAMEN TIANG DENGAN BATA 1:5 DI PLESTER
a Bata merah bh 70.0000 550
b PC zak 0.3000 65,000
c Pasir pasang m3 0.0600 186,000
d Pekerja org 0.2000 70,000
e Tukang Batu org 0.1000 85,000
f Kepala Tukang Batu org 0.0100 95,000
g Mandor org 0.0100 110,000
Total Rp
Total Harga Rp
20 1 M2 PENGECATAN DINDING DAN PLAFOND (3X)
a Cat tembok setara metrolite/vinilex kg 0.2000 25,300
b Plamir tembok setara matek/metrolite kg 0.1000 38,500
c Rool cat tembok bh 0.0100 30,000
d Steger werk ls 1.0000 1,000
e Ampelas lbr 0.5000 5,200
f Pekerja org 0.0450 70,000
g Tukang Cat org 0.1000 85,000
h Kepala Tukang Cat org 0.0100 95,000
i Mandor org 0.0010 110,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
21 1 M2 LANTAI KERAMIK 40/40 DN PUTIH
a Keramik 40 x 40 DN Putih m2 1.0000 60,000
b PC zak 0.1400 65,000
c Pasir pasang m3 0.0250 186,000
d Semen warna kg 0.0130 14,300
e Pekerja org 0.7000 70,000
f Tukang batu org 0.3500 85,000
g Kepala Tukang Batu org 0.0350 95,000
h Mandor org 0.0350 110,000
i Alat bantu (pemotong keramik) ls 0.5000 1,000
Total Rp
Total Harga Rp
22 1 M2 PAS. LANTAI KERAMIK 20/20 DN PUTIH
a Keramik 20 x 20 DN Putih Kw. 2 m2 1.0000 55,000
b PC zak 0.1400 65,000
c Pasir pasang m3 0.0250 186,000
d Semen warna kg 0.0130 14,300
e Pekerja org 0.1000 70,000
f Tukang batu org 0.1500 85,000
g Kepala Tukang Batu org 0.0150 95,000
h Mandor org 0.0020 110,000
i Alat bantu (pemotong keramik) ls 1.0000 2,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
23 1 M2 PAS. DINDING KERAMIK 20/25 CORAK
a Keramik 20 x 25 corak m2 1.0000 58,000
b PC zak 0.1400 65,000
c Pasir pasang m3 0.0250 186,000
d Semen warna kg 0.0130 14,300
e Pekerja org 0.1000 70,000
f Tukang batu org 0.1500 85,000
g Kepala Tukang Batu org 0.0150 95,000
h Mandor org 0.0020 110,000
i Alat bantu (pemotong keramik) ls 1.0000 2,000
Total Rp
Total Harga Rp
24 1 M3 RABAT BETON K-100
a PC zak 6.1750 65,000
b Pasir beton m3 0.6207 195,000
c Batu split 2/3 m3 0.5550 156,660
d Pekerja org 1.6500 70,000
e Tukang Batu org 0.2750 85,000
f Kepala Tukang Batu org 0.0280 95,000
g Mandor org 0.0830 110,000
Total Rp
Total Harga Rp
25 1 BH PONDASI UMPAK KOLOM
a Batu belah m3 0.3200 175,000
b PC zak 1.1000 65,000
c Pasir pasang m3 0.1450 186,000
d Pekerja org 0.4500 70,000
e Tukang Batu org 0.2000 85,000
f Kepala Tukang Batu org 0.0200 95,000
g Mandor org 0.0020 110,000
Total Rp
Total Harga Rp
26 1 M3 KUDA-KUDA KAYU KLAS II
a Kayu balok 8/12 cm klas II m3 1.1000 3,406,000
b Paku 8 cm s/d 12 cm kg 4.5000 13,500
c Besi begel kg 10.0000 20,300
d Residu kg 8.0000 12,200
e Pekerja org 0.4500 70,000
f Tukang Kayu org 0.2000 85,000
g Kepala Tukang Kayu org 0.0200 95,000
h Mandor org 0.0020 110,000
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
Total Rp
Total Harga Rp
27 1 M2 GORDING KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0125 3,406,000
b Paku 8 cm s/d 12 cm kg 0.2500 13,500
c Besi begel kg 0.5000 20,300
d Pekerja org 0.0500 70,000
e Tukang Kayu org 0.1000 85,000
f Kepala Tukang Kayu org 0.0100 95,000
g Mandor org 0.0010 110,000
Total Rp
Total Harga Rp
28 1 M2 PASANG RANGKA ATAP BAJA RINGAN
a Canal m' 3.700 10,000
b Reng m2 5.500 5,333
c Baut Kuda-kuda bh 25.000 450
d Baut Reng bh 35.000 300
e Dinabolt kg 2.000 1,400
f Pekerja bh 0.247 70,000.00
g Tukang bh 0.170 85,000.00
h Kepala Tukang ls 0.117 95,000.00
i Sewa Gedung org 0.011 781,000.00
j Transport org 0.021 500,000.00
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
29 1 M2 PENUTUP ATAP METAL
a Genteng Metal roof (Pasir Kwarsa) lbr 1.1000 44,750
b Pekerja org 0.0080 70,000
c Tukang Besi org 0.0800 85,000
d Kepala Tukang Besi org 0.0080 95,000
e Mandor org 0.0040 110,000
Total Rp
Total Harga Rp
30 1 M1 PEK. NOK METAL
a Nok Metal Roof lbr 1.1000 35,000
b Pekerja org 0.0080 70,000
c Tukang Besi org 0.0800 85,000
d Kepala tukang Besi org 0.0080 95,000
e Mandor org 0.0040 110,000
Total Rp
Total Harga Rp
31 1 M1 PEK. LISTPLANK KAYU KLAS II
a Kayu papan 2/30 cm klas II lbr 0.0100 3,406,000
b Paku 4 cm s/d 7 cm m1 0.0100 14,000
c Pekerja org 0.0688 70,000
d Tukang Kayu org 0.1250 85,000
e Kepala Tukang Kayu org 0.0600 95,000
f Mandor org 0.0300 110,000
Total Rp
Total Harga Rp
32 1 M1 PEK. LISTPLANK WOODPLANK BOARD
a Woodplank Board lbr 1.0000 66,400
b Paku 4 cm s/d 7 cm m1 0.0100 14,000
c Pekerja org 0.0688 70,000
d Tukang Kayu org 0.1250 85,000
e Kepala Tukang Kayu org 0.0600 95,000
f Mandor org 0.0300 110,000
Total Rp
Total Harga Rp
33 1 M3 PEK. KONSOL KAYU KLAS II
a Kayu balok 8/12 cm klas II m3 1.1000 3,406,000
b Paku 8 cm s/d 12 cm kg 4.5000 13,500
c Besi begel kg 10.0000 20,300
d Residu kg 8.0000 12,200
e Pekerja org 3.0000 70,000
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
f Tukang Kayu org 5.0000 85,000
g Kepala Tukang Kayu org 2.5000 95,000
h Mandor org 1.2500 110,000
Total Rp
Total Harga Rp
34 1 M2 PENGECATAN KAYU 3X BERIKUT MENI
a Meni kayu/besi kg 0.1700 25,900
b Plamir kayu kg 0.0900 40,700
c Cat kayu setara glotex kg 0.2200 59,800
d Ampelas lbr 0.4000 5,200
e Thiner B lt 0.1500 26,300
f Kuwas 3" bh 0.0500 14,200
g Pekerja org 0.0750 70,000
h Tukang Cat org 0.1500 85,000
i Kepala Tukang Cat org 0.0750 95,000
j Mandor org 0.0015 110,000
Total Rp
Total Harga Rp
35 1 M2 PAS. RANGKA PLAFOND KAYU
a Kayu kaso 5/7 cm klas II m3 0.0102 3,258,000
b Kayu kaso 5/10 cm klas II m3 0.0001 3,258,000
c Kayu kaso 4/5 cm klas II m3 0.0001 3,258,000
d Paku 8 cm s/d 12 cm kg 0.0200 13,500
e Pekerja org 0.1200 70,000
f Tukang Kayu org 0.1200 85,000
g Kepala Tukang Kayu org 0.0120 95,000
h Mandor org 0.0060 110,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
36 1 M2 PAS. PLAFOND TRIPLEKS 4 MM
a Triplek 4mm 120 x 240 m2 0.5000 56,000
b Paku 1 cm s/d 3 cm kg 0.0100 26,500
c Pekerja org 0.1200 70,000
d Tukang Kayu org 0.1200 85,000
e Kepala Tukang Kayu org 0.0120 95,000
f Mandor org 0.0060 110,000
Total Rp
Total Harga Rp
37 1 M2 PAS. PLAFOND GRC BOARD 9 MM
a GRC Board 9mm 120 x 240 m2 0.5000 90,000
b Paku 1 cm s/d 3 cm kg 0.0100 26,500
c Pekerja org 0.1200 70,000
Tukang Kayu org 0.1200 85,000
Kepala Tukang Kayu org 0.0120 95,000
d Mandor org 0.0060 110,000
Total Rp
Total Harga Rp
38 1 M' LIST PLAFOND
a List profil kamper 10 cm btg 0.3333 12,000
b Paku seng kg 0.0200 1,000
c Pekerja org 0.0200 70,000
d Tukang kayu org 0.0050 85,000
e Kepala tukang kayu org 0.0200 95,000
Total Rp
Total Harga Rp
39 1 M' MEMASANG KUSEN PINTU/JENDELA ALLUMINIUM NATURAL 3"
a Profil Allumunium Natural 3" m3 1.1000 50,000
b Skrup Fixer m3 2.0000 400
c Sealant bh 0.0600 20,000
h Pekerja bh 0.0430 70,000
i Tukang Besi ls 0.0430 85,000
j Kepala Tukang Besi org 0.0043 95,000
k Mandor org 0.0021 110,000
Total Rp
Total Harga Rp
40 1 M2 MEMASANG PINTU/JENDELA KACA RANGKA ALLUMUNIUM Natural 3"
a Profil Allumunium Natural 3" m3 4.4000 50,000
b Profil Allumunium T m3 4.5000 35,000
c Sealant bh 0.2700 20,000
h Pekerja bh 0.0850 70,000
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
i Tukang Besi ls 0.0850 85,000
j Kepala Tukang Besi org 0.0090 95,000
k Mandor org 0.0050 110,000
Total Rp
Total Harga Rp
41 1 UNIT KUSEN JENDELA TYPE J1 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.1110 3,406,000
b Paku 4 cm s/d 7 cm kg 0.2000 14,000
c Angkur bh 6.0000 1,000
d Alat bantu ls 1.0000 1,000
e Pekerja org 2.0000 70,000
f Tukang Kayu org 6.0000 85,000
g Kepala Tukang Kayu org 0.6000 95,000
h Mandor org 0.1000 110,000
Total Rp
Total Harga Rp
42 1 UNIT KUSEN JENDELA TYPE J2 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0480 3,406,000
f Paku 4 cm s/d 7 cm kg 0.1000 14,000
g Angkur bh 4.0000 1,000
i Alat bantu ls 0.9000 1,000
j Pekerja org 2.0000 70,000
k Tukang kayu org 6.0000 85,000
l Kepala Tukang Kayu org 0.6000 95,000
m Mandor org 0.1000 110,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
43 1 UNIT KUSEN TYPE P1 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0690 3,406,000
e Paku 4 cm s/d 7 cm kg 0.1250 14,000
f Angkur bh 6.0000 1,000
h Alat bantu ls 1.0000 1,000
i Pekerja org 2.0000 70,000
j Tukang Kayu org 6.0000 85,000
k Kepala Tukang Kayu org 0.6000 95,000
l Mandor org 0.1000 110,000
Total Rp
Total Harga Rp
44 1 UNIT KUSEN TYPE P2 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0525 3,406,000
e Paku 4 cm s/d 7 cm kg 0.1000 14,000
f Angkur bh 6.0000 1,000
g Grendel bh 2.0000 18,000
h Alat bantu ls 0.6500 1,000
i Pekerja org 2.0000 70,000
j Tukang Kayu org 6.0000 85,000
k Kepala Tukang Kayu org 0.6000 95,000
l Mandor org 0.1000 110,000
Total Rp
Total Harga Rp
45 1 UNIT PANEL PINTU uk. (215x80)cm
b Kayu papan 2/30 cm klas II m3 0.0688 3,406,000
c Paku 4 cm s/d 7 cm kg 3.0000 14,000
d Engsel Jendela / Pintu bh 3.0000 25,000
e Grendel bh 1.0000 18,000
f Kunci Pintu bh 1.0000 106,600
g Alat bantu ls 0.1000 1,000
h Pekerja org 1.0000 70,000
i Tukang Kayu org 3.0000 85,000
j Kepala Tukang Kayu org 0.3000 95,000
k Mandor org 0.0500 110,000
Total Rp
Total Harga Rp
46 1 UNIT JENDELA uk. (50x60) cm
b Kayu papan 2/30 cm klas II m2 0.0029 3,406,000
c Kaca polos 5 mm bh 0.1575 113,000
d Paku 1 cm s/d 3 cm kg 0.1000 26,500
e Engsel Jendela / Pintu bh 2.0000 25,000
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
f Grendel bh 1.0000 18,000
g Kait Angin Jendela bh 1.0000 18,500
h Alat bantu ls 0.7500 1,000
i Pekerja org 0.5000 70,000
j Tukang Kayu org 1.0000 85,000
k Kepala Tukang Kayu org 0.1000 95,000
l Mandor org 0.0250 110,000
Total Rp
Total Harga Rp
47 1 M2 DINDING TERAWANG
b Rooster 20x20 bh 30.0000 5,000
c PC zak 0.2750 65,000
d Pasir Pasang m3 0.0350 186,000
i Pekerja org 0.3000 70,000
j Tukang Batu org 0.1000 85,000
k Kepala Tukang Batu org 0.0100 95,000
l Mandor org 0.0150 110,000
Total Rp
Total Harga Rp
48 1 M1 PAS. SALURAN PINGGIR BANGUNAN
a Buis beton 1/2 dia 20 cm panjang 1 m bh 1.0500 65,000
b PC zak 0.2000 65,000
c Pasir pasang m3 0.0500 186,000
d Pekerja org 0.3000 70,000
e Tukang Batu org 0.1000 85,000
f Kepala Tukang Batu org 0.0100 95,000
g Mandor org 0.0150 110,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
49 1 m2 PEK. PERATAAN TANAH
a Pekerja org 0.1000 70,000
b Mandor org 0.0500 110,000
Total Rp
Total Harga Rp
50 1 UNIT PASANG KLOSET JONGKOK
a Closet jongkok bh 1.0000 270,000
b PC zak 0.1500 65,000
c Pasir pasang m3 0.0500 186,000
d Semen warna kg 0.3000 14,300
e Pekerja org 1.0000 70,000
f Tukang Batu org 1.5000 85,000
g Kepala tukang Batu org 0.1500 95,000
h Mandor org 0.1600 110,000
i Alat bantu ls 1.0000 25,000
Total Rp
Total Harga Rp
51 1 UNIT PASANG BAK KAMAR MANDI (AIR)
a Bak air mandi bh 1.0000 357,000
b PC zak 1.5000 65,000
c Pasir pasang m3 0.2500 186,000
d Semen warna kg 1.0000 14,300
e Bata merah bh 70.0000 550
f Pekerja org 0.7000 70,000
g Tukang batu org 1.5000 85,000
h Alat bantu (pemotong keramik) ls 1.0000 2,500
Total Rp
Total Harga Rp
52 1 M PAS. PIPA 1/2"
a PVC dia 1/2" m' 1.2000 4,093
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.0360 70,000
d Tukang batu org 0.0600 85,000
Total Rp
Total Harga Rp
53 1 M PAS. PIPA 4"
a PVC dia 4" m' 1.2000 62,275
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.0360 70,000
d Tukang batu org 0.0600 85,000
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
Total Rp
Total Harga Rp
54 1 M PAS. PIPA 2"
a PVC dia 2" m' 1.2000 19,075
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.0360 70,000
d Tukang batu org 0.0600 85,000
Total Rp
Total Harga Rp
55 1 BH KRAN 1/2"
a Kran 1/2" bh 1.0000 25,000
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.0360 70,000
d Tukang batu org 0.0600 85,000
Total Rp
Total Harga Rp
56 1 BH TANGKI AIR 500 L
a Tangki air 500L bh 1.0000 820,000
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.0360 70,000
d Tukang batu org 0.0600 85,000
Total Rp
Total Harga Rp
57 1 BH FLOOR DRAIN
a Floor drain bh 1.0000 20,000
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.0360 70,000
d Tukang batu org 0.0600 85,000
Total Rp
Total Harga Rp
ANALISA HARGA SATUAN 2017
NO KETERANGAN SAT INDEK HARGA (Rp)

a b c d e
58 1 BH PINTU KM/WC
a Pintu fiber KM/WC bh 1.0000 420,000
b Perlengkapan (35%) kg 1.0000 1,000
c Pekerja org 0.7000 70,000
d Tukang batu org 0.3500 85,000
Total Rp
Total Harga Rp
59 PEMASANGAN 1 BH WASTAFLE
a Wasfhtafle m' 1.000 600,000
b PC kg 0.150 65,000
c Pasir pasang m3 0.010 186,000
d Perlengkapan % 12.000 600,000
f Pekerja bh 0.247 70,000.00
g Tukang bh 0.170 85,000.00
h Kepala Tukang ls 0.117 95,000.00
Total Rp
Total Harga Rp
60 1 M 3 MEMBUAT SEPTICTANK+ REMBESAN
a Galian tanah Septictank & rembesan M3 1.0000 56,250
b Pasir urug M3 0.0500 137,000
c Lantai kerja M3 0.0500 137,000
d Pasang bata 1 Pc : 2 Psr M2 4.0000 114,383
e Pelat beton penutup dan balok M3 0.1200 993,593
f Pipa PVC 4 inci AW & perlengkapannya M' 5.4000 84,071
g Plesteran 1 Pc : 3 Psr M2 0.0800
i Urugan kerikil 3,5 cm M3 0.0300
j Pipa PVC 4 inci AW dilobang M' 9.0000
k Urugan kembali M3 0.1733
l Pekerja org 3.0000 70,000
m Tukang batu org 4.0000 85,000
Total Rp
Total Harga Rp
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

7,000.00 7,000.00
5,500.00 5,500.00
- 5,500.00 - 12,500.00
12,500.00

23,100.00 23,100.00
1,100.00 1,100.00
1,000.00 1,000.00
1,000.00 24,200.00 - 25,200.00
25,200.00

65.00 65.00
1,000.00 1,000.00
24,180.00 24,180.00
14,000.00 14,000.00
17,000.00 17,000.00
1,000.00 31,000.00 24,245.00 56,245.00
56,245.00

10,923.00 10,923.00
2,100.00 2,100.00
4,250.00 4,250.00
475.00 475.00
275.00 275.00
1,000.00 1,000.00
1,000.00 7,100.00 10,923.00 19,023.00
19,023.00

29,632.20 29,632.20
280.00 280.00
7,000.00 7,000.00
8,500.00 8,500.00
1,100.00 1,100.00
5.00 5.00
5.00 16,600.00 29,912.20 46,517.20
46,517.20

52,500.00 52,500.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


2,750.00 2,750.00
1,000.00 1,000.00
1,000.00 55,250.00 - 56,250.00
56,250.00

35,000.00 35,000.00
5,500.00 5,500.00
1,000.00 1,000.00
- 35,000.00 - 41,500.00
41,500.00

164,400.00 164,400.00
21,000.00 21,000.00
1,100.00 1,100.00
- 22,100.00 164,400.00 186,500.00
186,500.00

210,000.00 210,000.00
221,000.00 221,000.00
101,184.00 101,184.00
105,000.00 105,000.00
63,750.00 63,750.00
71,250.00 71,250.00
8,250.00 8,250.00
- 248,250.00 532,184.00 780,434.00
780,434.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

210,000.00 210,000.00
59,184.00 59,184.00
54,600.00 54,600.00
33,150.00 33,150.00
3,705.00 3,705.00
4,290.00 4,290.00
- 95,745.00 269,184.00 364,929.00
364,929.00

602,875.00 602,875.00
97,221.43 97,221.43
121,498.53 121,498.53
5,000.00 5,000.00
115,500.00 115,500.00
23,375.00 23,375.00
2,660.00 2,660.00
9,130.00 9,130.00
5,000.00 150,665.00 821,594.96 977,259.96
977,259.96

147,000.00 147,000.00
3,375.00 3,375.00
1,000.00 1,000.00
4,900.00 4,900.00
5,950.00 5,950.00
665.00 665.00
440.00 440.00
1,000.00 11,955.00 150,375.00 163,330.00
100.00 1,195.50 15,037.50 163,330.00
16,333.00

61,308.00 61,308.00
32,580.00 32,580.00
14,000.00 14,000.00
36,400.00 36,400.00
22,100.00 22,100.00
2,470.00 2,470.00
2,860.00 2,860.00
- 63,830.00 107,888.00 171,718.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


171,718.00

46,800.00
8,632.00
8,768.00
276,075.94
351,322.83
377,779.60
- - - 1,069,378.37
1,069,378.37

20,250.00
3,735.00
36,990.00
117,271.20
351,322.83
206,061.60
- - - 735,630.63
735,630.63

44,000.00 44,000.00
30,842.50 30,842.50
7,440.00 7,440.00
21,000.00 21,000.00
8,500.00 8,500.00
950.00 950.00
1,650.00 1,650.00
- 32,100.00 82,282.50 114,382.50
114,382.50
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

9,100.00 9,100.00
3,534.00 3,534.00
21,000.00 21,000.00
12,750.00 12,750.00
1,425.00 1,425.00
1,650.00 1,650.00
- 36,825.00 12,634.00 49,459.00
49,459.00

5,265.00 5,265.00
3,534.00 3,534.00
14,000.00 14,000.00
8,500.00 8,500.00
950.00 950.00
1,100.00 1,100.00
- 24,550.00 8,799.00 33,349.00
33,349.00

38,500.00 38,500.00
19,500.00 19,500.00
11,160.00 11,160.00
14,000.00 14,000.00
8,500.00 8,500.00
950.00 950.00
1,100.00 1,100.00
- 24,550.00 69,160.00 93,710.00
93,710.00

5,060.00 5,060.00
3,850.00 3,850.00
300.00 300.00
1,000.00 1,000.00
2,600.00 2,600.00
3,150.00 3,150.00
8,500.00 8,500.00
950.00 950.00
110.00 110.00
1,000.00 12,710.00 11,810.00 25,520.00
25,520.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

60,000.00 60,000.00
9,100.00 9,100.00
4,650.00 4,650.00
185.90 185.90
49,000.00 49,000.00
29,750.00 29,750.00
3,325.00 3,325.00
3,850.00 3,850.00
500.00 500.00
500.00 85,925.00 73,935.90 160,360.90
160,360.90

55,000.00 55,000.00
9,100.00 9,100.00
4,650.00 4,650.00
185.90 185.90
7,000.00 7,000.00
12,750.00 12,750.00
1,425.00 1,425.00
220.00 220.00
2,000.00 2,000.00
2,000.00 21,395.00 68,935.90 92,330.90
92,330.90
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

58,000.00 58,000.00
9,100.00 9,100.00
4,650.00 4,650.00
185.90 185.90
7,000.00 7,000.00
12,750.00 12,750.00
1,425.00 1,425.00
220.00 220.00
2,000.00 2,000.00
2,000.00 21,395.00 71,935.90 95,330.90
95,330.90

401,375.00 401,375.00
121,039.29 121,039.29
86,946.30 86,946.30
115,500.00 115,500.00
23,375.00 23,375.00
2,660.00 2,660.00
9,130.00 9,130.00
- 150,665.00 609,360.59 760,025.59
760,025.59

56,000.00 56,000.00
71,500.00 71,500.00
26,970.00 26,970.00
31,500.00 31,500.00
17,000.00 17,000.00
1,900.00 1,900.00
220.00 220.00
- 50,620.00 154,470.00 205,090.00
205,090.00

3,746,600.00 3,746,600.00
60,750.00 60,750.00
203,000.00 203,000.00
97,600.00 97,600.00
31,500.00 31,500.00
17,000.00 17,000.00
1,900.00 1,900.00
220.00 220.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


- 50,620.00 4,107,950.00 4,158,570.00
4,158,570.00

42,575.00 42,575.00
3,375.00 3,375.00
10,150.00 10,150.00
3,500.00 3,500.00
8,500.00 8,500.00
950.00 950.00
110.00 110.00
- 13,060.00 56,100.00 69,160.00
69,160.00

37,000 37,000.00
29,333 29,333.33
11,250 11,250.00
10,500 10,500.00
2,800 2,800.00
17,290.00 17,290.00
14,450.00 14,450.00
11,115.00 11,115.00
8,591.00 8,591.00
10,500.00 10,500.00
- 61,946.00 90,883.33 152,829.33
152,829.33
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

49,225.00 49,225.00
560.00 560.00
6,800.00 6,800.00
760.00 760.00
440.00 440.00
- 8,560.00 49,225.00 57,785.00
57,785.00

38,500.00 38,500.00
560.00 560.00
6,800.00 6,800.00
760.00 760.00
440.00 440.00
- 8,560.00 38,500.00 47,060.00
47,060.00

34,060.00 34,060.00
140.00 140.00
4,816.00 4,816.00
10,625.00 10,625.00
5,700.00 5,700.00
3,300.00 3,300.00
- 24,441.00 34,200.00 58,641.00
58,641.00

66,400.00 66,400.00
140.00 140.00
4,816.00 4,816.00
10,625.00 10,625.00
5,700.00 5,700.00
3,300.00 3,300.00
- 24,441.00 66,540.00 90,981.00
90,981.00

3,746,600.00 3,746,600.00
60,750.00 60,750.00
203,000.00 203,000.00
97,600.00 97,600.00
210,000.00 210,000.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


425,000.00 425,000.00
237,500.00 237,500.00
137,500.00 137,500.00
- 1,010,000.00 4,107,950.00 5,117,950.00
5,117,950.00

4,403.00 4,403.00
3,663.00 3,663.00
13,156.00 13,156.00
2,080.00 2,080.00
3,945.00 3,945.00
710.00 710.00
5,250.00 5,250.00
12,750.00 12,750.00
7,125.00 7,125.00
165.00 165.00
- 25,290.00 27,957.00 53,247.00
53,247.00

33,231.60 33,231.60
325.80 325.80
325.80 325.80
270.00 270.00
8,400.00 8,400.00
10,200.00 10,200.00
1,140.00 1,140.00
660.00 660.00
- 20,400.00 34,153.20 54,553.20
54,553.20
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

28,000.00 28,000.00
265.00 265.00
8,400.00 8,400.00
10,200.00 10,200.00
1,140.00 1,140.00
660.00 660.00
- 20,400.00 28,265.00 48,665.00
48,665.00

45,000.00 45,000.00
265.00 265.00
8,400.00 8,400.00
10,200.00 10,200.00
1,140.00 1,140.00
660.00 660.00
- 20,400.00 45,265.00 65,665.00
65,665.00

4,000.00 4,000.00
20.00 20.00
1,400.00 1,400.00
425.00 425.00
1,900.00 1,900.00
- 3,725.00 4,020.00 7,745.00
7,745.00

55,000.00 55,000.00
800.00 800.00
1,200.00 1,200.00
3,010.00 3,010.00
3,655.00 3,655.00
408.50 408.50
231.00 231.00
- 7,304.50 57,000.00 64,304.50
64,304.50

220,000.00 220,000.00
157,500.00 157,500.00
5,400.00 5,400.00
5,950.00 5,950.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


7,225.00 7,225.00
855.00 855.00
550.00 550.00
- 14,580.00 382,900.00 397,480.00
397,480.00

378,066.00 378,066.00
2,800.00 2,800.00
6,000.00 6,000.00
1,000.00 1,000.00
140,000.00 140,000.00
510,000.00 510,000.00
57,000.00 57,000.00
11,000.00 11,000.00
1,000.00 718,000.00 386,866.00 1,105,866.00
1,105,866.00

163,488.00 163,488.00
1,400.00 1,400.00
4,000.00 4,000.00
900.00 900.00
140,000.00 140,000.00
510,000.00 510,000.00
57,000.00 57,000.00
11,000.00 11,000.00
900.00 718,000.00 168,888.00 887,788.00
887,788.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

235,014.00 235,014.00
1,750.00 1,750.00
6,000.00 6,000.00
1,000.00 1,000.00
140,000.00 140,000.00
510,000.00 510,000.00
57,000.00 57,000.00
11,000.00 11,000.00
1,000.00 718,000.00 242,764.00 961,764.00
961,764.00

178,815.00 178,815.00
1,400.00 1,400.00
6,000.00 6,000.00
36,000.00 36,000.00
650.00 650.00
140,000.00 140,000.00
510,000.00 510,000.00
57,000.00 57,000.00
11,000.00 11,000.00
650.00 718,000.00 222,215.00 940,865.00
940,865.00

234,332.80 234,332.80
42,000.00 42,000.00
75,000.00 75,000.00
18,000.00 18,000.00
106,600.00 106,600.00
100.00 100.00
70,000.00 70,000.00
255,000.00 255,000.00
28,500.00 28,500.00
5,500.00 5,500.00
100.00 359,000.00 475,932.80 835,032.80
835,032.80

9,707.10 9,707.10
17,797.50 17,797.50
2,650.00 2,650.00
50,000.00 50,000.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


18,000.00 18,000.00
18,500.00 18,500.00
750.00 750.00
35,000.00 35,000.00
85,000.00 85,000.00
9,500.00 9,500.00
2,750.00 2,750.00
750.00 132,250.00 116,654.60 249,654.60
249,654.60

150,000.00 150,000.00
17,875.00 17,875.00
6,510.00 6,510.00
21,000.00 21,000.00
8,500.00 8,500.00
950.00 950.00
1,650.00 1,650.00
- 32,100.00 174,385.00 206,485.00
206,485.00

68,250.00 68,250.00
13,000.00 13,000.00
9,300.00 9,300.00
21,000.00 21,000.00
8,500.00 8,500.00
950.00 950.00
1,650.00 1,650.00
- 32,100.00 90,550.00 122,650.00
122,650.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

7,000.00 7,000.00
5,500.00 5,500.00
- 12,500.00 - 12,500.00
12,500.00

270,000.00 270,000.00
9,750.00 9,750.00
9,300.00 9,300.00
4,290.00 4,290.00
70,000.00 70,000.00
127,500.00 127,500.00
14,250.00 14,250.00
17,600.00 17,600.00
25,000.00 25,000.00
25,000.00 229,350.00 293,340.00 547,690.00
547,690.00

357,000.00 357,000.00
97,500.00 97,500.00
46,500.00 46,500.00
14,300.00 14,300.00
38,500.00 38,500.00
49,000.00 49,000.00
127,500.00 127,500.00
2,500.00 2,500.00
2,500.00 176,500.00 553,800.00 732,800.00
732,800.00

4,911.00 4,911.00
1,000.00 1,000.00
2,520.00 2,520.00
5,100.00 5,100.00
1,000.00 7,620.00 4,911.00 13,531.00
13,531.00

74,730.00 74,730.00
1,000.00 1,000.00
2,520.00 2,520.00
5,100.00 5,100.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)


1,000.00 7,620.00 74,730.00 83,350.00
83,350.00

22,890.00 22,890.00
1,000.00 1,000.00
2,520.00 2,520.00
5,100.00 5,100.00
1,000.00 7,620.00 22,890.00 31,510.00
31,510.00

25,000.00 25,000.00
1,000.00 1,000.00
2,520.00 2,520.00
5,100.00 5,100.00
1,000.00 7,620.00 25,000.00 33,620.00
33,620.00

820,000.00 820,000.00
1,000.00 1,000.00
2,520.00 2,520.00
5,100.00 5,100.00
1,000.00 7,620.00 820,000.00 828,620.00
828,620.00

20,000.00 20,000.00
1,000.00 1,000.00
2,520.00 2,520.00
5,100.00 5,100.00
1,000.00 7,620.00 20,000.00 28,620.00
28,620.00
HARGA SATUAN 2017
ALAT (Rp) UPAH (Rp) BAHAN (Rp) JUMLAH

f=(dxe) g=(dxe) h=(dxe) i=(f+g+h)

420,000.00 420,000.00
1,000.00 1,000.00
49,000.00 49,000.00
29,750.00 29,750.00
1,000.00 78,750.00 420,000.00 499,750.00
499,750.00

600,000 600,000.00
9,750 9,750.00
1,860 1,860.00
72,000 72,000.00
17,290.00 17,290.00
14,450.00 14,450.00
11,115.00 11,115.00
- 42,855.00 683,610.00 726,465.00
726,465.00

56,250.00 56,250.00
6,850.00 6,850.00
6,850.00 6,850.00
82,282.50 82,282.50
993,592.96 993,592.96
84,071.25 84,071.25
49,459.00 49,459.00
165,000.00 165,000.00
62,275.00 62,275.00
25,200.00 25,200.00
210,000.00 210,000.00
340,000.00 340,000.00
- 631,450.00 1,450,380.71 2,081,830.71
2,081,830.71
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
1 PEMBERSIHAN LOKASI
a Pekerja org 0.1000
b Mandor org 0.0500
Total
Total Harga
2 1 M3 MENGANGKUT DAN PEMBUANGAN TANAH
a Pekerja org 0.3300
d Mandor org 0.0100
e Alat bantu ls 1.0000
Total
Total Harga
3 1 M2 PERKERASAN TANAH
a PC zak 0.0010
b Alat bantu ls 1.0000
c Pasir pasang m3 0.1300
d Pekerja org 0.2000
e Tukang batu org 0.2000
Total
Total Harga
4 1 M2 PEKERJAAN ANTI RAYAP
a Bahan kimia anti rayap ls 0.3300
b Pekerja org 0.0300
c Tukang batu org 0.0500
d Kepala Tukang Batu org 0.0050
e Mandor org 0.0025
f Alat bantu ls 1.0000
Total
Total Harga
5 1 M1 PENGUKURAN DAN PASANG BOUWPLANK
a Kayu papan 2/30 cm klas II m3 0.0087
b Paku 4 cm s/d 7 cm kg 0.0200
c Pekerja org 0.1000
d Tukang kayu org 0.1000
f Mandor org 0.0100
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
g Alat bantu ls 0.0050
Total
Total Harga
6 1 M3 PEK. GALIAN TANAH BIASA
a Pekerja org 0.7500
d Mandor org 0.0250
e Alat bantu ls 1.0000
Total
Total Harga
7 1 M3 URUGAN KEMBALI PONDASI DIHITUNG 1/4 DARI GALIAN
a Pekerja org 0.5000
b Mandor org 0.0500
d Alat Bantu ls 1.0000
Total
Total Harga
8 1 M3 URUGAN PASIR URUG
a Pasir urug m3 1.2000
b Pekerja org 0.3000
c Mandor org 0.0100
Total
Total Harga
9 1 M3 PAS. BATU KALI 1:5
a Batu belah m3 1.2000
b PC zak 3.4000
c Pasir pasang m3 0.5440
d Pekerja org 1.5000
e Tukang Batu org 0.7500
f Kepala Tukang Batu org 0.7500
g Mandor org 0.0750
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
10 1 M3 PAS. BATU KOSONG
a Batu belah m3 1.2000
b Pasir urug m3 0.4320
c Pekerja org 0.7800
d Tukang Batu org 0.3900
e Kepala Tukang Batu org 0.0390
f Mandor org 0.0390
Total
Total Harga
11 1 M3 COR BETON SITE MIX K. 225
a PC zak 9.2750
b Pasir beton m3 0.4986
c Batu split 2/3 m3 0.7756
d Peralatan ls 1.0000
e Pekerja org 1.6500
f Tukang Batu org 0.2750
g Kepala Tukang Batu org 0.0280
h Mandor org 0.0830
Total
Total Harga
12 1 KG BESI BETON TERPASANG U 24
a Besi Beton U. 24 Rata-rata kg 10.5000
b Kawat beton kg 0.1500
c Peralatan, spencer ls 1.0000
d Pekerja org 0.0700
e Tukang Batu org 0.0700
f Kepala Tukang Batu org 0.0070
g Mandor org 0.0040
Total
Total Harga/10 kg
Harga/1kg
13 1 M2 BEKISTING DENGAN KAYU MERANTI (2 x PAKAI)
a Kayu papan 2/30 cm klas II m3 0.0180
b Kayu kaso 5/7 cm klas II m3 0.0100
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
c Paku 4 cm s/d 7 cm kg 1.0000
d Pekerja org 0.5200
e Tukang kayu org 0.2600
f Kepala tukang kayu org 0.0260
g Mandor org 0.0260
Total
Total Harga
14 1 BH PONDASI FOOTPLAT 80 x 80
a Galian tanah M3 0.832
b Urugan Kembali M3 0.208
c Pasir urug M3 0.064
d Beton K-225 M3 0.283
f Besi kg 21.510
g Bekisting M2 2.200
Total
Total Harga
15 1 BH PONDASI FOOTPLAT 60 x 60
a Galian tanah M3 0.360
b Urugan Kembali M3 0.090
c Pasir urug M3 0.270
d Beton K-225 M3 0.120
f Besi kg 21.510
g Bekisting M2 1.200
Total
Total Harga
16 1 M2 PAS. BATA MERAH 1:5
a Bata merah bh 80.0000
b PC zak 0.4745
c Pasir pasang m3 0.0400
d Pekerja org 0.3000
e Tukang kayu org 0.1000
f Kepala tukang kayu org 0.0100
g Mandor org 0.0150
Total
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
17 1 M2 PLESTERAN DINDING 1:5
a PC zak 0.1400
b Pasir pasang m3 0.0190
c Pekerja org 0.3000
d Tukang Batu org 0.1500
e Kepala Tukang Batu org 0.0150
f Mandor org 0.0150
Total
Total Harga
18 1 M2 ACIAN DINDING 1:5
a PC zak 0.0810
b Pasir pasang m3 0.0190
c Pekerja org 0.2000
d Tukang Batu org 0.1000
e Kepala Tukang Batu org 0.0100
f Mandor org 0.0100
Total
Total Harga
19 1 M2 PAS ORNAMEN TIANG DENGAN BATA 1:5 DI PLESTER
a Bata merah bh 70.0000
b PC zak 0.3000
c Pasir pasang m3 0.0600
d Pekerja org 0.2000
e Tukang Batu org 0.1000
f Kepala Tukang Batu org 0.0100
g Mandor org 0.0100
Total
Total Harga
20 1 M2 PENGECATAN DINDING DAN PLAFOND (3X)
a Cat tembok setara metrolite/vinilex kg 0.2000
b Plamir tembok setara matek/metrolite kg 0.1000
c Rool cat tembok bh 0.0100
d Steger werk ls 1.0000
e Ampelas lbr 0.5000
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
f Pekerja org 0.0450
g Tukang Cat org 0.1000
h Kepala Tukang Cat org 0.0100
i Mandor org 0.0010
Total
Total Harga
21 1 M2 LANTAI KERAMIK 40/40 DN PUTIH
a Keramik 40 x 40 DN Putih m2 1.0000
b PC zak 0.1400
c Pasir pasang m3 0.0250
d Semen warna kg 0.0130
e Pekerja org 0.7000
f Tukang batu org 0.3500
g Kepala Tukang Batu org 0.0350
h Mandor org 0.0350
i Alat bantu (pemotong keramik) ls 0.5000
Total
Total Harga
22 1 M2 PAS. LANTAI KERAMIK 20/20 DN PUTIH
a Keramik 20 x 20 DN Putih Kw. 2 m2 1.0000
b PC zak 0.1400
c Pasir pasang m3 0.0250
d Semen warna kg 0.0130
e Pekerja org 0.1000
f Tukang batu org 0.1500
g Kepala Tukang Batu org 0.0150
h Mandor org 0.0020
i Alat bantu (pemotong keramik) ls 1.0000
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
23 1 M2 PAS. DINDING KERAMIK 20/25 CORAK
a Keramik 20 x 25 corak m2 1.0000
b PC zak 0.1400
c Pasir pasang m3 0.0250
d Semen warna kg 0.0130
e Pekerja org 0.1000
f Tukang batu org 0.1500
g Kepala Tukang Batu org 0.0150
h Mandor org 0.0020
i Alat bantu (pemotong keramik) ls 1.0000
Total
Total Harga
24 1 M3 RABAT BETON K-100
a PC zak 6.1750
b Pasir beton m3 0.6207
c Batu split 2/3 m3 0.5550
d Pekerja org 1.6500
e Tukang Batu org 0.2750
f Kepala Tukang Batu org 0.0280
g Mandor org 0.0830
Total
Total Harga
25 1 BH PONDASI UMPAK KOLOM
a Batu belah m3 0.3200
b PC zak 1.1000
c Pasir pasang m3 0.1450
d Pekerja org 0.4500
e Tukang Batu org 0.2000
f Kepala Tukang Batu org 0.0200
g Mandor org 0.0020
Total
Total Harga
26 1 M3 KUDA-KUDA KAYU KLAS II
a Kayu balok 8/12 cm klas II m3 1.1000
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
b Paku 8 cm s/d 12 cm kg 4.5000
c Besi begel kg 10.0000
d Residu kg 8.0000
e Pekerja org 0.4500
f Tukang Kayu org 0.2000
g Kepala Tukang Kayu org 0.0200
h Mandor org 0.0020
Total
Total Harga
27 1 M2 GORDING KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0125
b Paku 8 cm s/d 12 cm kg 0.2500
c Besi begel kg 0.5000
d Pekerja org 0.0500
e Tukang Kayu org 0.1000
f Kepala Tukang Kayu org 0.0100
g Mandor org 0.0010
Total
Total Harga
28 1 M2 PASANG RANGKA ATAP BAJA RINGAN
a Canal m' 3.700
b Reng m2 5.500
c Baut Kuda-kuda bh 25.000
d Baut Reng bh 35.000
e Dinabolt kg 2.000
f Pekerja bh 0.247
g Tukang bh 0.170
h Kepala Tukang ls 0.117
i Sewa Gedung org 0.011
j Transport org 0.021
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
29 1 M2 PENUTUP ATAP METAL
a Genteng Metal roof (Pasir Kwarsa) lbr 1.1000
b Pekerja org 0.0080
c Tukang Besi org 0.0800
d Kepala Tukang Besi org 0.0080
e Mandor org 0.0040
Total
Total Harga
30 1 M1 PEK. NOK METAL
a Nok Metal Roof lbr 1.1000
b Pekerja org 0.0080
c Tukang Besi org 0.0800
d Kepala tukang Besi org 0.0080
e Mandor org 0.0040
Total
Total Harga
31 1 M1 PEK. LISTPLANK KAYU KLAS II
a Kayu papan 2/30 cm klas II lbr 0.0100
b Paku 4 cm s/d 7 cm m1 0.0100
c Pekerja org 0.0688
d Tukang Kayu org 0.1250
e Kepala Tukang Kayu org 0.0600
f Mandor org 0.0300
Total
Total Harga
32 1 M1 PEK. LISTPLANK WOODPLANK BOARD
a Woodplank Board lbr 1.0000
b Paku 4 cm s/d 7 cm m1 0.0100
c Pekerja org 0.0688
d Tukang Kayu org 0.1250
e Kepala Tukang Kayu org 0.0600
f Mandor org 0.0300
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
33 1 M3 PEK. KONSOL KAYU KLAS II
a Kayu balok 8/12 cm klas II m3 1.1000
b Paku 8 cm s/d 12 cm kg 4.5000
c Besi begel kg 10.0000
d Residu kg 8.0000
e Pekerja org 3.0000
f Tukang Kayu org 5.0000
g Kepala Tukang Kayu org 2.5000
h Mandor org 1.2500
Total
Total Harga
34 1 M2 PENGECATAN KAYU 3X BERIKUT MENI
a Meni kayu/besi kg 0.1700
b Plamir kayu kg 0.0900
c Cat kayu setara glotex kg 0.2200
d Ampelas lbr 0.4000
e Thiner B lt 0.1500
f Kuwas 3" bh 0.0500
g Pekerja org 0.0750
h Tukang Cat org 0.1500
i Kepala Tukang Cat org 0.0750
j Mandor org 0.0015
Total
Total Harga
35 1 M2 PAS. RANGKA PLAFOND KAYU
a Kayu kaso 5/7 cm klas II m3 0.0102
b Kayu kaso 5/10 cm klas II m3 0.0001
c Kayu kaso 4/5 cm klas II m3 0.0001
d Paku 8 cm s/d 12 cm kg 0.0200
e Pekerja org 0.1200
f Tukang Kayu org 0.1200
g Kepala Tukang Kayu org 0.0120
h Mandor org 0.0060
Total
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
36 1 M2 PAS. PLAFOND TRIPLEKS 4 MM
a Triplek 4mm 120 x 240 m2 0.5000
b Paku 1 cm s/d 3 cm kg 0.0100
c Pekerja org 0.1200
d Tukang Kayu org 0.1200
e Kepala Tukang Kayu org 0.0120
f Mandor org 0.0060
Total
Total Harga
37 1 M2 PAS. PLAFOND GRC BOARD 9 MM
a GRC Board 9mm 120 x 240 m2 0.5000
b Paku 1 cm s/d 3 cm kg 0.0100
c Pekerja org 0.1200
Tukang Kayu org 0.1200
Kepala Tukang Kayu org 0.0120
d Mandor org 0.0060
Total
Total Harga
38 1 M' LIST PLAFOND
a List profil kamper 10 cm btg 0.3333
b Paku seng kg 0.0200
c Pekerja org 0.0200
d Tukang kayu org 0.0050
e Kepala tukang kayu org 0.0200
Total
Total Harga
39 1 M' MEMASANG KUSEN PINTU/JENDELA ALLUMINIUM NATURAL 3"
a Profil Allumunium Natural 3" m3 1.1000
b Skrup Fixer m3 2.0000
c Sealant bh 0.0600
h Pekerja bh 0.0430
i Tukang Besi ls 0.0430
j Kepala Tukang Besi org 0.0043
k Mandor org 0.0021
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
40 1 M2 MEMASANG PINTU/JENDELA KACA RANGKA ALLUMUNIUM Natural 3"
a Profil Allumunium Natural 3" m3 4.4000
b Profil Allumunium T m3 4.5000
c Sealant bh 0.2700
h Pekerja bh 0.0850
i Tukang Besi ls 0.0850
j Kepala Tukang Besi org 0.0090
k Mandor org 0.0050
Total
Total Harga
41 1 UNIT KUSEN JENDELA TYPE J1 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.1110
b Paku 4 cm s/d 7 cm kg 0.2000
c Angkur bh 6.0000
d Alat bantu ls 1.0000
e Pekerja org 2.0000
f Tukang Kayu org 6.0000
g Kepala Tukang Kayu org 0.6000
h Mandor org 0.1000
Total
Total Harga
42 1 UNIT KUSEN JENDELA TYPE J2 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0480
f Paku 4 cm s/d 7 cm kg 0.1000
g Angkur bh 4.0000
i Alat bantu ls 0.9000
j Pekerja org 2.0000
k Tukang kayu org 6.0000
l Kepala Tukang Kayu org 0.6000
m Mandor org 0.1000
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
43 1 UNIT KUSEN TYPE P1 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0690
e Paku 4 cm s/d 7 cm kg 0.1250
f Angkur bh 6.0000
h Alat bantu ls 1.0000
i Pekerja org 2.0000
j Tukang Kayu org 6.0000
k Kepala Tukang Kayu org 0.6000
l Mandor org 0.1000
Total
Total Harga
44 1 UNIT KUSEN TYPE P2 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0525
e Paku 4 cm s/d 7 cm kg 0.1000
f Angkur bh 6.0000
g Grendel bh 2.0000
h Alat bantu ls 0.6500
i Pekerja org 2.0000
j Tukang Kayu org 6.0000
k Kepala Tukang Kayu org 0.6000
l Mandor org 0.1000
Total
Total Harga
45 1 UNIT PANEL PINTU uk. (215x80)cm
b Kayu papan 2/30 cm klas II m3 0.0688
c Paku 4 cm s/d 7 cm kg 3.0000
d Engsel Jendela / Pintu bh 3.0000
e Grendel bh 1.0000
f Kunci Pintu bh 1.0000
g Alat bantu ls 0.1000
h Pekerja org 1.0000
i Tukang Kayu org 3.0000
j Kepala Tukang Kayu org 0.3000
k Mandor org 0.0500
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
46 1 UNIT JENDELA uk. (50x60) cm
b Kayu papan 2/30 cm klas II m2 0.0029
c Kaca polos 5 mm bh 0.1575
d Paku 1 cm s/d 3 cm kg 0.1000
e Engsel Jendela / Pintu bh 2.0000
f Grendel bh 1.0000
g Kait Angin Jendela bh 1.0000
h Alat bantu ls 0.7500
i Pekerja org 0.5000
j Tukang Kayu org 1.0000
k Kepala Tukang Kayu org 0.1000
l Mandor org 0.0250
Total
Total Harga
47 1 M2 DINDING TERAWANG
b Rooster 20x20 bh 30.0000
c PC zak 0.2750
d Pasir Pasang m3 0.0350
i Pekerja org 0.3000
j Tukang Batu org 0.1000
k Kepala Tukang Batu org 0.0100
l Mandor org 0.0150
Total
Total Harga
48 1 M1 PAS. SALURAN PINGGIR BANGUNAN
a Buis beton 1/2 dia 20 cm panjang 1 m bh 1.0500
b PC zak 0.2000
c Pasir pasang m3 0.0500
d Pekerja org 0.3000
e Tukang Batu org 0.1000
f Kepala Tukang Batu org 0.0100
g Mandor org 0.0150
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
49 1 m2 PEK. PERATAAN TANAH
a Pekerja org 0.1000
b Mandor org 0.0500
Total
Total Harga
50 1 UNIT PASANG KLOSET JONGKOK
a Closet jongkok bh 1.0000
b PC zak 0.1500
c Pasir pasang m3 0.0500
d Semen warna kg 0.3000
e Pekerja org 1.0000
f Tukang Batu org 1.5000
g Kepala tukang Batu org 0.1500
h Mandor org 0.1600
i Alat bantu ls 1.0000
Total
Total Harga
51 1 UNIT PASANG BAK KAMAR MANDI (AIR)
a Bak air mandi bh 1.0000
b PC zak 1.5000
c Pasir pasang m3 0.2500
d Semen warna kg 1.0000
e Bata merah bh 70.0000
f Pekerja org 0.7000
g Tukang batu org 1.5000
h Alat bantu (pemotong keramik) ls 1.0000
Total
Total Harga
52 1 M PAS. PIPA 1/2"
a PVC dia 1/2" m' 1.2000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total Harga
53 1 M PAS. PIPA 4"
a PVC dia 4" m' 1.2000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
54 1 M PAS. PIPA 2"
a PVC dia 2" m' 1.2000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
55 1 BH KRAN 1/2"
a Kran 1/2" bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
56 1 BH TANGKI AIR 500 L
a Tangki air 500L bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
57 1 BH FLOOR DRAIN
a Floor drain bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN RUANG GURU DAN
PIMPINAN

NO KETERANGAN SAT INDEK

a b c d
58 1 BH PINTU KM/WC
a Pintu fiber KM/WC bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.7000
d Tukang batu org 0.3500
Total
Total Harga
59 PEMASANGAN 1 BH WASTAFLE
a Wasfhtafle m' 1.000
b PC kg 0.150
c Pasir pasang m3 0.010
d Perlengkapan % 12.000
f Pekerja bh 0.247
g Tukang bh 0.170
h Kepala Tukang ls 0.117
Total
Total Harga
60 1 M 3 MEMBUAT SEPTICTANK+ REMBESAN
a Galian tanah Septictank & rembesan M3 1.0000
b Pasir urug M3 0.0500
c Lantai kerja M3 0.0500
d Pasang bata 1 Pc : 2 Psr M2 4.0000
e Pelat beton penutup dan balok M3 0.1200
f Pipa PVC 4 inci AW & perlengkapannya M' 5.4000
g Plesteran 1 Pc : 3 Psr M2 0.0800
i Urugan kerikil 3,5 cm M3 0.0300
j Pipa PVC 4 inci AW dilobang M' 9.0000
k Urugan kembali M3 0.1733
l Pekerja org 3.0000
m Tukang batu org 4.0000
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
1 PEMBERSIHAN LOKASI
a Pekerja org 0.1000
b Mandor org 0.0500
Total
Total Harga
2 1 M3 MENGANGKUT DAN PEMBUANGAN TANAH
a Pekerja org 0.3300
d Mandor org 0.0100
e Alat bantu ls 1.0000
Total
Total Harga
3 1 M2 PERKERASAN TANAH
a PC zak 0.0010
b Alat bantu ls 1.0000
c Pasir pasang m3 0.1300
d Pekerja org 0.2000
e Tukang batu org 0.2000
Total
Total Harga
4 1 M2 PEKERJAAN ANTI RAYAP
a Bahan kimia anti rayap ls 0.3300
b Pekerja org 0.0300
c Tukang batu org 0.0500
d Kepala Tukang Batu org 0.0050
e Mandor org 0.0025
f Alat bantu ls 1.0000
Total
Total Harga
5 1 M1 PENGUKURAN DAN PASANG BOUWPLANK
a Kayu papan 2/30 cm klas II m3 0.0087
b Paku 4 cm s/d 7 cm kg 0.0200
c Pekerja org 0.1000
d Tukang kayu org 0.1000
f Mandor org 0.0100
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
g Alat bantu ls 0.0050
Total
Total Harga
6 1 M3 PEK. GALIAN TANAH BIASA
a Pekerja org 0.7500
d Mandor org 0.0250
e Alat bantu ls 1.0000
Total
Total Harga
7 1 M3 URUGAN KEMBALI PONDASI DIHITUNG 1/4 DARI GALIAN
a Pekerja org 0.5000
b Mandor org 0.0500
d Alat Bantu ls 1.0000
Total
Total Harga
8 1 M3 URUGAN PASIR URUG
a Pasir urug m3 1.2000
b Pekerja org 0.3000
c Mandor org 0.0100
Total
Total Harga
9 1 M3 PAS. BATU KALI 1:5
a Batu belah m3 1.2000
b PC zak 3.4000
c Pasir pasang m3 0.5440
d Pekerja org 1.5000
e Tukang Batu org 0.7500
f Kepala Tukang Batu org 0.7500
g Mandor org 0.0750
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
10 1 M3 PAS. BATU KOSONG
a Batu belah m3 1.2000
b Pasir urug m3 0.4320
c Pekerja org 0.7800
d Tukang Batu org 0.3900
e Kepala Tukang Batu org 0.0390
f Mandor org 0.0390
Total
Total Harga
11 1 M3 COR BETON SITE MIX K. 225
a PC zak 9.2750
b Pasir beton m3 0.4986
c Batu split 2/3 m3 0.7756
d Peralatan ls 1.0000
e Pekerja org 1.6500
f Tukang Batu org 0.2750
g Kepala Tukang Batu org 0.0280
h Mandor org 0.0830
Total
Total Harga
12 1 KG BESI BETON TERPASANG U 24
a Besi Beton U. 24 Rata-rata kg 10.5000
b Kawat beton kg 0.1500
c Peralatan, spencer ls 1.0000
d Pekerja org 0.0700
e Tukang Batu org 0.0700
f Kepala Tukang Batu org 0.0070
g Mandor org 0.0040
Total
Total Harga/10 kg
Harga/1kg
13 1 M2 BEKISTING DENGAN KAYU MERANTI (2 x PAKAI)
a Kayu papan 2/30 cm klas II m3 0.0180
b Kayu kaso 5/7 cm klas II m3 0.0100
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
c Paku 4 cm s/d 7 cm kg 1.0000
d Pekerja org 0.5200
e Tukang kayu org 0.2600
f Kepala tukang kayu org 0.0260
g Mandor org 0.0260
Total
Total Harga
14 1 BH PONDASI FOOTPLAT 80 x 80
a Galian tanah M3 0.832
b Urugan Kembali M3 0.208
c Pasir urug M3 0.064
d Beton K-225 M3 0.283
f Besi kg 21.510
g Bekisting M2 2.200
Total
Total Harga
15 1 BH PONDASI FOOTPLAT 60 x 60
a Galian tanah M3 0.360
b Urugan Kembali M3 0.090
c Pasir urug M3 0.270
d Beton K-225 M3 0.120
f Besi kg 21.510
g Bekisting M2 1.200
Total
Total Harga
16 1 M2 PAS. BATA MERAH 1:5
a Bata merah bh 80.0000
b PC zak 0.4745
c Pasir pasang m3 0.0400
d Pekerja org 0.3000
e Tukang kayu org 0.1000
f Kepala tukang kayu org 0.0100
g Mandor org 0.0150
Total
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
17 1 M2 PLESTERAN DINDING 1:5
a PC zak 0.1400
b Pasir pasang m3 0.0190
c Pekerja org 0.3000
d Tukang Batu org 0.1500
e Kepala Tukang Batu org 0.0150
f Mandor org 0.0150
Total
Total Harga
18 1 M2 ACIAN DINDING 1:5
a PC zak 0.0810
b Pasir pasang m3 0.0190
c Pekerja org 0.2000
d Tukang Batu org 0.1000
e Kepala Tukang Batu org 0.0100
f Mandor org 0.0100
Total
Total Harga
19 1 M2 PAS ORNAMEN TIANG DENGAN BATA 1:5 DI PLESTER
a Bata merah bh 70.0000
b PC zak 0.3000
c Pasir pasang m3 0.0600
d Pekerja org 0.2000
e Tukang Batu org 0.1000
f Kepala Tukang Batu org 0.0100
g Mandor org 0.0100
Total
Total Harga
20 1 M2 PENGECATAN DINDING DAN PLAFOND (3X)
a Cat tembok setara metrolite/vinilex kg 0.2000
b Plamir tembok setara matek/metrolite kg 0.1000
c Rool cat tembok bh 0.0100
d Steger werk ls 1.0000
e Ampelas lbr 0.5000
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
f Pekerja org 0.0450
g Tukang Cat org 0.1000
h Kepala Tukang Cat org 0.0100
i Mandor org 0.0010
Total
Total Harga
21 1 M2 LANTAI KERAMIK 40/40 DN PUTIH
a Keramik 40 x 40 DN Putih m2 1.0000
b PC zak 0.1400
c Pasir pasang m3 0.0250
d Semen warna kg 0.0130
e Pekerja org 0.7000
f Tukang batu org 0.3500
g Kepala Tukang Batu org 0.0350
h Mandor org 0.0350
i Alat bantu (pemotong keramik) ls 0.5000
Total
Total Harga
22 1 M2 PAS. LANTAI KERAMIK 20/20 DN PUTIH
a Keramik 20 x 20 DN Putih Kw. 2 m2 1.0000
b PC zak 0.1400
c Pasir pasang m3 0.0250
d Semen warna kg 0.0130
e Pekerja org 0.1000
f Tukang batu org 0.1500
g Kepala Tukang Batu org 0.0150
h Mandor org 0.0020
i Alat bantu (pemotong keramik) ls 1.0000
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
23 1 M2 PAS. DINDING KERAMIK 20/25 CORAK
a Keramik 20 x 25 corak m2 1.0000
b PC zak 0.1400
c Pasir pasang m3 0.0250
d Semen warna kg 0.0130
e Pekerja org 0.1000
f Tukang batu org 0.1500
g Kepala Tukang Batu org 0.0150
h Mandor org 0.0020
i Alat bantu (pemotong keramik) ls 1.0000
Total
Total Harga
24 1 M3 RABAT BETON K-100
a PC zak 6.1750
b Pasir beton m3 0.6207
c Batu split 2/3 m3 0.5550
d Pekerja org 1.6500
e Tukang Batu org 0.2750
f Kepala Tukang Batu org 0.0280
g Mandor org 0.0830
Total
Total Harga
25 1 BH PONDASI UMPAK KOLOM
a Batu belah m3 0.3200
b PC zak 1.1000
c Pasir pasang m3 0.1450
d Pekerja org 0.4500
e Tukang Batu org 0.2000
f Kepala Tukang Batu org 0.0200
g Mandor org 0.0020
Total
Total Harga
26 1 M3 KUDA-KUDA KAYU KLAS II
a Kayu balok 8/12 cm klas II m3 1.1000
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
b Paku 8 cm s/d 12 cm kg 4.5000
c Besi begel kg 10.0000
d Residu kg 8.0000
e Pekerja org 0.4500
f Tukang Kayu org 0.2000
g Kepala Tukang Kayu org 0.0200
h Mandor org 0.0020
Total
Total Harga
27 1 M2 GORDING KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0125
b Paku 8 cm s/d 12 cm kg 0.2500
c Besi begel kg 0.5000
d Pekerja org 0.0500
e Tukang Kayu org 0.1000
f Kepala Tukang Kayu org 0.0100
g Mandor org 0.0010
Total
Total Harga
28 1 M2 PASANG RANGKA ATAP BAJA RINGAN
a Canal m' 3.700
b Reng m2 5.500
c Baut Kuda-kuda bh 25.000
d Baut Reng bh 35.000
e Dinabolt kg 2.000
f Pekerja bh 0.247
g Tukang bh 0.170
h Kepala Tukang ls 0.117
i Sewa Gedung org 0.011
j Transport org 0.021
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
29 1 M2 PENUTUP ATAP METAL
a Genteng Metal roof (Pasir Kwarsa) lbr 1.1000
b Pekerja org 0.0080
c Tukang Besi org 0.0800
d Kepala Tukang Besi org 0.0080
e Mandor org 0.0040
Total
Total Harga
30 1 M1 PEK. NOK METAL
a Nok Metal Roof lbr 1.1000
b Pekerja org 0.0080
c Tukang Besi org 0.0800
d Kepala tukang Besi org 0.0080
e Mandor org 0.0040
Total
Total Harga
31 1 M1 PEK. LISTPLANK KAYU KLAS II
a Kayu papan 2/30 cm klas II lbr 0.0100
b Paku 4 cm s/d 7 cm m1 0.0100
c Pekerja org 0.0688
d Tukang Kayu org 0.1250
e Kepala Tukang Kayu org 0.0600
f Mandor org 0.0300
Total
Total Harga
32 1 M1 PEK. LISTPLANK WOODPLANK BOARD
a Woodplank Board lbr 1.0000
b Paku 4 cm s/d 7 cm m1 0.0100
c Pekerja org 0.0688
d Tukang Kayu org 0.1250
e Kepala Tukang Kayu org 0.0600
f Mandor org 0.0300
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
33 1 M3 PEK. KONSOL KAYU KLAS II
a Kayu balok 8/12 cm klas II m3 1.1000
b Paku 8 cm s/d 12 cm kg 4.5000
c Besi begel kg 10.0000
d Residu kg 8.0000
e Pekerja org 3.0000
f Tukang Kayu org 5.0000
g Kepala Tukang Kayu org 2.5000
h Mandor org 1.2500
Total
Total Harga
34 1 M2 PENGECATAN KAYU 3X BERIKUT MENI
a Meni kayu/besi kg 0.1700
b Plamir kayu kg 0.0900
c Cat kayu setara glotex kg 0.2200
d Ampelas lbr 0.4000
e Thiner B lt 0.1500
f Kuwas 3" bh 0.0500
g Pekerja org 0.0750
h Tukang Cat org 0.1500
i Kepala Tukang Cat org 0.0750
j Mandor org 0.0015
Total
Total Harga
35 1 M2 PAS. RANGKA PLAFOND KAYU
a Kayu kaso 5/7 cm klas II m3 0.0102
b Kayu kaso 5/10 cm klas II m3 0.0001
c Kayu kaso 4/5 cm klas II m3 0.0001
d Paku 8 cm s/d 12 cm kg 0.0200
e Pekerja org 0.1200
f Tukang Kayu org 0.1200
g Kepala Tukang Kayu org 0.0120
h Mandor org 0.0060
Total
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
36 1 M2 PAS. PLAFOND TRIPLEKS 4 MM
a Triplek 4mm 120 x 240 m2 0.5000
b Paku 1 cm s/d 3 cm kg 0.0100
c Pekerja org 0.1200
d Tukang Kayu org 0.1200
e Kepala Tukang Kayu org 0.0120
f Mandor org 0.0060
Total
Total Harga
37 1 M2 PAS. PLAFOND GRC BOARD 9 MM
a GRC Board 9mm 120 x 240 m2 0.5000
b Paku 1 cm s/d 3 cm kg 0.0100
c Pekerja org 0.1200
Tukang Kayu org 0.1200
Kepala Tukang Kayu org 0.0120
d Mandor org 0.0060
Total
Total Harga
38 1 M' LIST PLAFOND
a List profil kamper 10 cm btg 0.3333
b Paku seng kg 0.0200
c Pekerja org 0.0200
d Tukang kayu org 0.0050
e Kepala tukang kayu org 0.0200
Total
Total Harga
39 1 M' MEMASANG KUSEN PINTU/JENDELA ALLUMINIUM NATURAL 3"
a Profil Allumunium Natural 3" m3 1.1000
b Skrup Fixer m3 2.0000
c Sealant bh 0.0600
h Pekerja bh 0.0430
i Tukang Besi ls 0.0430
j Kepala Tukang Besi org 0.0043
k Mandor org 0.0021
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
40 1 M2 MEMASANG PINTU/JENDELA KACA RANGKA ALLUMUNIUM Natural 3"
a Profil Allumunium Natural 3" m3 4.4000
b Profil Allumunium T m3 4.5000
c Sealant bh 0.2700
h Pekerja bh 0.0850
i Tukang Besi ls 0.0850
j Kepala Tukang Besi org 0.0090
k Mandor org 0.0050
Total
Total Harga
41 1 UNIT KUSEN JENDELA TYPE J1 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.1110
b Paku 4 cm s/d 7 cm kg 0.2000
c Angkur bh 6.0000
d Alat bantu ls 1.0000
e Pekerja org 2.0000
f Tukang Kayu org 6.0000
g Kepala Tukang Kayu org 0.6000
h Mandor org 0.1000
Total
Total Harga
42 1 UNIT KUSEN JENDELA TYPE J2 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0480
f Paku 4 cm s/d 7 cm kg 0.1000
g Angkur bh 4.0000
i Alat bantu ls 0.9000
j Pekerja org 2.0000
k Tukang kayu org 6.0000
l Kepala Tukang Kayu org 0.6000
m Mandor org 0.1000
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
43 1 UNIT KUSEN TYPE P1 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0690
e Paku 4 cm s/d 7 cm kg 0.1250
f Angkur bh 6.0000
h Alat bantu ls 1.0000
i Pekerja org 2.0000
j Tukang Kayu org 6.0000
k Kepala Tukang Kayu org 0.6000
l Mandor org 0.1000
Total
Total Harga
44 1 UNIT KUSEN TYPE P2 KAYU KLAS 2
a Kayu balok 8/12 cm klas II m3 0.0525
e Paku 4 cm s/d 7 cm kg 0.1000
f Angkur bh 6.0000
g Grendel bh 2.0000
h Alat bantu ls 0.6500
i Pekerja org 2.0000
j Tukang Kayu org 6.0000
k Kepala Tukang Kayu org 0.6000
l Mandor org 0.1000
Total
Total Harga
45 1 UNIT PANEL PINTU uk. (215x80)cm
b Kayu papan 2/30 cm klas II m3 0.0688
c Paku 4 cm s/d 7 cm kg 3.0000
d Engsel Jendela / Pintu bh 3.0000
e Grendel bh 1.0000
f Kunci Pintu bh 1.0000
g Alat bantu ls 0.1000
h Pekerja org 1.0000
i Tukang Kayu org 3.0000
j Kepala Tukang Kayu org 0.3000
k Mandor org 0.0500
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
46 1 UNIT JENDELA uk. (50x60) cm
b Kayu papan 2/30 cm klas II m2 0.0029
c Kaca polos 5 mm bh 0.1575
d Paku 1 cm s/d 3 cm kg 0.1000
e Engsel Jendela / Pintu bh 2.0000
f Grendel bh 1.0000
g Kait Angin Jendela bh 1.0000
h Alat bantu ls 0.7500
i Pekerja org 0.5000
j Tukang Kayu org 1.0000
k Kepala Tukang Kayu org 0.1000
l Mandor org 0.0250
Total
Total Harga
47 1 M2 DINDING TERAWANG
b Rooster 20x20 bh 30.0000
c PC zak 0.2750
d Pasir Pasang m3 0.0350
i Pekerja org 0.3000
j Tukang Batu org 0.1000
k Kepala Tukang Batu org 0.0100
l Mandor org 0.0150
Total
Total Harga
48 1 M1 PAS. SALURAN PINGGIR BANGUNAN
a Buis beton 1/2 dia 20 cm panjang 1 m bh 1.0500
b PC zak 0.2000
c Pasir pasang m3 0.0500
d Pekerja org 0.3000
e Tukang Batu org 0.1000
f Kepala Tukang Batu org 0.0100
g Mandor org 0.0150
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
49 1 m2 PEK. PERATAAN TANAH
a Pekerja org 0.1000
b Mandor org 0.0500
Total
Total Harga
50 1 UNIT PASANG KLOSET JONGKOK
a Closet jongkok bh 1.0000
b PC zak 0.1500
c Pasir pasang m3 0.0500
d Semen warna kg 0.3000
e Pekerja org 1.0000
f Tukang Batu org 1.5000
g Kepala tukang Batu org 0.1500
h Mandor org 0.1600
i Alat bantu ls 1.0000
Total
Total Harga
51 1 UNIT PASANG BAK KAMAR MANDI (AIR)
a Bak air mandi bh 1.0000
b PC zak 1.5000
c Pasir pasang m3 0.2500
d Semen warna kg 1.0000
e Bata merah bh 70.0000
f Pekerja org 0.7000
g Tukang batu org 1.5000
h Alat bantu (pemotong keramik) ls 1.0000
Total
Total Harga
52 1 M PAS. PIPA 1/2"
a PVC dia 1/2" m' 1.2000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total Harga
53 1 M PAS. PIPA 4"
a PVC dia 4" m' 1.2000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
54 1 M PAS. PIPA 2"
a PVC dia 2" m' 1.2000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
55 1 BH KRAN 1/2"
a Kran 1/2" bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
56 1 BH TANGKI AIR 500 L
a Tangki air 500L bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
Total
Total Harga
57 1 BH FLOOR DRAIN
a Floor drain bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.0360
d Tukang batu org 0.0600
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
Total
Total Harga
KEBUTHAN BAHAN MATERIAL
PEMBANGUNAN TOILET SISWA

NO KETERANGAN SAT INDEK

a b c d
58 1 BH PINTU KM/WC
a Pintu fiber KM/WC bh 1.0000
b Perlengkapan (35%) kg 1.0000
c Pekerja org 0.7000
d Tukang batu org 0.3500
Total
Total Harga
59 PEMASANGAN 1 BH WASTAFLE
a Wasfhtafle m' 1.000
b PC kg 0.150
c Pasir pasang m3 0.010
d Perlengkapan % 12.000
f Pekerja bh 0.247
g Tukang bh 0.170
h Kepala Tukang ls 0.117
Total
Total Harga
60 1 M 3 MEMBUAT SEPTICTANK+ REMBESAN
a Galian tanah Septictank & rembesan M3 1.0000
b Pasir urug M3 0.0500
c Lantai kerja M3 0.0500
d Pasang bata 1 Pc : 2 Psr M2 4.0000
e Pelat beton penutup dan balok M3 0.1200
f Pipa PVC 4 inci AW & perlengkapannya M' 5.4000
g Plesteran 1 Pc : 3 Psr M2 0.0800
i Urugan kerikil 3,5 cm M3 0.0300
j Pipa PVC 4 inci AW dilobang M' 9.0000
k Urugan kembali M3 0.1733
l Pekerja org 3.0000
m Tukang batu org 4.0000
Total
Total Harga