DAILY DRILLING REPORT

G.P.C DAILY DRILLING REPORT WELL : HH 83/1 C


ATT.
EASTERN DESERT FIELD N AMER RIG HEADING : 206°
REPORT NO. 22 RIG ADMARINE-3 RKB-MSL 36 MT W. DEPTH 23 MT ORKB-MSL 24 MT
SPUD IN DATE MID NIGHT DEPHT PROGRESS MORNING DEPTH
WELL HH 83-1 B UNDER OBSERVATION WHILE THAT SKIDDING CANTILEVER IN
DATE OF REPORT 24/1/2018 DATE OF OPER's 23/1/2018 OPERATION @ 6:00 AM
TO WELL HH 83-1C
NEXT 24 HRs OPERATION FORECAST:- SKID CANTILEVER IN TO HH 83-1 C, N/U BOP, FLOW LINE & BELL NIPPLE, RUN MAGNET ASSY TO T.O.C
CASING DATA
BIT DATA MUD DATA ENGINEERS DATA
BIT NO. MUD TYPE : CO. MAN : ENG. MAHMOUD ABDELRAZIK
SIZE MUD WT. (ppg) N. CO. MAN : ENG. EHAB EID
TYPE VISCOSITY PET.ENG : ENG. AHMED ABED/MOHAMED AMIN
S. / NO. HPHT, ml/30 min.
NOZZLES PV
PUMP ( G.P.M ) YP FLUID & BULK DATA
PRESS., PSI LSYP ITEM RCVD USED ON HAND
W.O.B ( KLB ) GEL (10 SC / 10 MN ) DIESEL, LIT 0 3,657 156,738
AVG. ROP ( M/Hr ) ALKALINTY CMT., SK's 0 0 1,430
R.P.M CORREC. SOLID BARITE, SK's 0 0 0
T.ON BTM HRS EMULSION STABILITY D. WATER, BBLS 0 0 647
DEPTH IN (Mt) EXCESS LIME , PPB
DEPTH Out (Mt) OIL/WATER RATIO
DRLD. ( MT ) MUD COST DATA
TORQUE, LB.FT DAILY MUD COST, $ :
T. BIT REV., K ACC. MUD COST, $ :
WT BELOW JAR, KLBs
BHA LENGTH , MT :
BHA WEIGHT , KLBs :
BHA
TIME
FROM TO
HRs OPERATIONS
0:00 1:00 1:00 POOH WITH 1-5/8" MACRONI STRING, RIH WITH SAME IN WELL HH 83-1 A

1:00 2:30 1:30


R/UP CMT SURFACE LINES, P/T SAME W/ 500/2000 PSI " OK ", PERFORMED TOP CMT JOB BETWEEN 24''& 13 3/8" CSG ON WELL
HH 83/1 A (CMT SLURRY 16 PPG - CLASS G - 120 BBL's) , HAD NO CMT RETURN ON SURFACE.

2:30 4:00 1:30 TESTED PRODUCTION LINE W/ 500 PSI AGAINST HEADER MASTER VLV "OK"
>> FOUND LEAKS IN CORROSION INHBITOR INJECTION POINTS, BLEEDING VLV FROM PRESSURE SWITCH & FIXED SAME

CHECKED ESP RIGHT & WRONG DIERECTION


4:00 5:00 1:00 >> RIGHT DIRECTION READINGS: FREQUENCY: 45 HZ, CURRENT: 25 AMP, VOLT: 1120 VOLT, Pi: 2343 PSI, Pd: 2343 PSI, Ti: 83°C, Tm: 150°C, WHP: 50 PSI
>> TM INCREASED TO 156°C (313 0F), DECREASED FREQUENCY F/45 T/ 42 HZ.

5:00 6:00 TIME


1:00 STARTED ESP ON RIGHT DIRECTION AND DIVERTED WELL FULLY OPEN WING VLV ON 6" PRODUCTION LINE.
FREQUENCY, HZ WHP, psi AMP Pi, psi Pd, psi TI °C TM °C CASING, PSI SSSV, PSI GAS VENT, PSI

6:00 42 50 27 2197 2197 89 153 0 5500 4200

8:00 43 70 28 1937 1937 79 130 0 6400 4200

10:00 45 70 28 1579 1579 82 124 0 6400 4200

13:00 45 130 28 1393 1393 81 142 0 6400 4200

5:30 7:30 2:00 SKIDDED CANTILEVER IN TO WELL HH 83-1 C

7:30 13:30 6:00 N/U RISER, BOP, BELL NIPPLE & FLOW LINE (IN PROGRESS)

CHANGE TOP RAM FROM 3-1/2" TO 5"


TEST BOP , TESTE BOP STACK (TOP - BTM - BLIND RAMS - KILL LINE - CHOKE LINE VALVES W/ 300 - 2500 PSI ) & TESTED
HYDRILL W/ (250-2000 PSI ) "OK" .

HPJSM, RIH W/ 8" MAGNET ASSY. (GPC)( 5TH RUN )+ 6 5/8" BOOT BASKET ON 6 1/2" D/Cs & 5'' D/Ps T / 411 MT (T.O.C), PUMP
50 BBLs HI. VIS & CIRC. TILL HAD CLEAN RETURN ON SURFACE & TAGGED T.O.C W/ 10 KLB.

HPJSM, POOH SLOWLY W/ 8" MAGNET ASSY. (GPC) TO SURFACE & L/D SAME.
>> MARK & RECORD ANY DEBRIS LATCHED IN MAGNET IF ANY PREPARE FOR 8-1/2" MILLING ASSY

>> WIND SPEED @ 06:00 AM 24-26 KNOTS DIRECTION SOUTH


TOTAL HRs. 24:00

TIME
HRs OPERATIONS
FROM TO

TOTAL HRs. 6:00

MAHMOUD ABDELRAZIK
G.P.C REPRESENTATIVE