FINISHED SPLICING ESP ROUND CABLE BELOW & ABOVE 9 5/8" VENT PKR PENETRATOR.
0:00 1:30 1:30 >>TESTED GAS VENT (COMPLETELY OPEN @ 2450 PSI) , APPLIED 5000 PSI WHILE RIH TO KEEP IT OPEN .
>>SENSOR READINGS: PH-PH : 5.2 Ω (BALANCED) & PH-GR: 700 MΩ,Pi : 2340 PSI, Pd: 2337 PSI , Ti: 171 oF & Tm: 171oF .
CONT'D RIH W/ 2 JTs X 3 1/2'' TBG (R#1) TO 1830 MT (258 JTs F/273 JTs). P/UP & M/UP 3 1/2'' HLS SSSV
1:30 2:30 1:00 ( ID:2.813'', "X" PROFILE , SELF EQUALIZED ).
>>TESTED SSSV (COMPLETELY OPEN @ 1800 PSI) , APPLIED 5000 PSI WHILE RIH TO KEEP IT OPEN .
CONT'D RIH W/ (15 JTs X 3 1/2'' TBG (R#1) + PUP JT) TO 1941 MT (273 JTs F/273 JTs).
2:30 4:30 2:00 P/UP & M/UP 10" X 3 1/2" 3 K-PSI THARWA BREDA TBG HGR .
>>SENSOR READINGS: PH-PH : 4.8 Ω (BALANCED) & PH-GR: 500 MΩ,Pi : 2436 PSI, Pd: 2434 PSI , Ti: 177 oF & Tm: 177oF .
>>END OF STRG @ 1950 MT, PUMP INTAKE @ 1944 MT, F.N @ 1927 MT, SSD @ 153 MT, HYD.VENT.PKR @ 136 MT, SSSV @ 118 MT.
7:30 9:30 2:00 SPLICED ESP ROUND CABLE W/LOWER "QCI" WELL HEAD PENETRATOR.
SET 1-WAY BPV W/ 11" THARWA BREDA TBG HANGER .P/UP & M/UP TBG LANDING JT (3 x 3 1/2" TBG (R#1) + PUP JT).
9:30 13:30 4:00 LANDED TBG HGR IN T.H.S .
>> HAD OBSTRUCTION @ 1943 MT(1931 MT F/ORKB) WORKED ON SAME MANY TRIALS W/ROTATION 1/4 RIGHT TURN TILL PASS FREE .
13:30 14:30 1:00 TIGHTENED L.D.S TO TBG HGR & TESTED TBG HGR (OUTER SEAL) W/ 500 PSI "OK" .
14:30 23:00 8:30 N/D LANDING JT. , BELL NIPPLE ,FLOW LINE , BOP STACK & RISER.
23:00 24:00 1:00 N/UP X-MAS TREE'S ADAPTOR FLANGE "IN PROGRESS".
TIME
HRs OPERATIONS
FROM TO
APPLY PRESS. THRU C.L TO OPEN TR-SCSSSV, R/UP SAPESCO S/L EQUIP., P/T SAME "OK", RIH W/ FB-2 PLUG SET SAME IN
3:00 6:00 3:00 F.N., SET 9 5/8" H.V. PKR @ 136 MT & POOH W/ FB-2 PLUG "IN PROGRESS".
>> WHILE THAT STARTED WORKING IN PRODUCTION LINE CONNECTION.
>> TESTED ANNULUS BY 1000 PSI "OK".