Вы находитесь на странице: 1из 1

DAILY DRILLING REPORT

G.P.C DAILY DRILLING REPORT WELL : HH 83/1 B


ATT.
EASTERN DESERT FIELD N AMER RIG HEADING : 206°
REPORT NO. 20 RIG ADMARINE-3 RKB-MSL 36 MT W. DEPTH 23 MT ORKB-MSL 24 MT
SPUD IN DATE MID NIGHT DEPHT PROGRESS MORNING DEPTH
DATE OF REPORT 22/1/2018 DATE OF OPER's 21/1/2018 OPERATION @ 6:00 AM POOH W/ FB-2 PLUG
NEXT 24 HRs OPERATION FORECAST:- FINISH PRODUCTIO LINE CONNECTION , START ESP & PUT THE WELL ON PRODUCTION
CASING DATA
BIT DATA MUD DATA ENGINEERS DATA
BIT NO. MUD TYPE : CO. MAN : ENG. MAHMOUD ABDELRAZIK
SIZE MUD WT. (ppg) N. CO. MAN : ENG. AMIR HANY
TYPE VISCOSITY DRLG.ENG : ENG. EHAB EID / SHADY EHAB
S. / NO. HPHT, ml/30 min. PET.ENG : ENG. AHMED ABED/MOHAMED AMIN
NOZZLES PV
PUMP ( G.P.M ) YP FLUID & BULK DATA
PRESS., PSI LSYP ITEM RCVD USED ON HAND
W.O.B ( KLB ) GEL (10 SC / 10 MN ) DIESEL, LIT 0 3,975 160,395
AVG. ROP ( M/Hr ) ALKALINTY CMT., SK's 0 0 1,430
R.P.M CORREC. SOLID BARITE, SK's 0 0 0
T.ON BTM HRS EMULSION STABILITY D. WATER, BBLS 0 0 647
DEPTH IN (Mt) EXCESS LIME , PPB
DEPTH Out (Mt) OIL/WATER RATIO
DRLD. ( MT ) MUD COST DATA
TORQUE, LB.FT DAILY MUD COST, $ :
T. BIT REV., K ACC. MUD COST, $ :
WT BELOW JAR, KLBs
BHA LENGTH , MT :
BHA WEIGHT , KLBs :
BHA
TIME
FROM TO
HRs OPERATIONS

FINISHED SPLICING ESP ROUND CABLE BELOW & ABOVE 9 5/8" VENT PKR PENETRATOR.
0:00 1:30 1:30 >>TESTED GAS VENT (COMPLETELY OPEN @ 2450 PSI) , APPLIED 5000 PSI WHILE RIH TO KEEP IT OPEN .
>>SENSOR READINGS: PH-PH : 5.2 Ω (BALANCED) & PH-GR: 700 MΩ,Pi : 2340 PSI, Pd: 2337 PSI , Ti: 171 oF & Tm: 171oF .

CONT'D RIH W/ 2 JTs X 3 1/2'' TBG (R#1) TO 1830 MT (258 JTs F/273 JTs). P/UP & M/UP 3 1/2'' HLS SSSV
1:30 2:30 1:00 ( ID:2.813'', "X" PROFILE , SELF EQUALIZED ).
>>TESTED SSSV (COMPLETELY OPEN @ 1800 PSI) , APPLIED 5000 PSI WHILE RIH TO KEEP IT OPEN .

CONT'D RIH W/ (15 JTs X 3 1/2'' TBG (R#1) + PUP JT) TO 1941 MT (273 JTs F/273 JTs).
2:30 4:30 2:00 P/UP & M/UP 10" X 3 1/2" 3 K-PSI THARWA BREDA TBG HGR .
>>SENSOR READINGS: PH-PH : 4.8 Ω (BALANCED) & PH-GR: 500 MΩ,Pi : 2436 PSI, Pd: 2434 PSI , Ti: 177 oF & Tm: 177oF .
>>END OF STRG @ 1950 MT, PUMP INTAKE @ 1944 MT, F.N @ 1927 MT, SSD @ 153 MT, HYD.VENT.PKR @ 136 MT, SSSV @ 118 MT.

4:30 7:30 3:00


R/UP SAPESCO S/L EQUIP., P/T SAME "OK". RIH W/ FB-2 PLUG SET SAME IN F.N., P/T STRING
FINAL WAY AGAINST FB-2 PLUG W/500 PSI "HOLD"& POOH W/ FB-2 PLUG T/ SURFACE & L/D SAPESCO S/L EQUIP.

7:30 9:30 2:00 SPLICED ESP ROUND CABLE W/LOWER "QCI" WELL HEAD PENETRATOR.

SET 1-WAY BPV W/ 11" THARWA BREDA TBG HANGER .P/UP & M/UP TBG LANDING JT (3 x 3 1/2" TBG (R#1) + PUP JT).
9:30 13:30 4:00 LANDED TBG HGR IN T.H.S .
>> HAD OBSTRUCTION @ 1943 MT(1931 MT F/ORKB) WORKED ON SAME MANY TRIALS W/ROTATION 1/4 RIGHT TURN TILL PASS FREE .

13:30 14:30 1:00 TIGHTENED L.D.S TO TBG HGR & TESTED TBG HGR (OUTER SEAL) W/ 500 PSI "OK" .

14:30 23:00 8:30 N/D LANDING JT. , BELL NIPPLE ,FLOW LINE , BOP STACK & RISER.

23:00 24:00 1:00 N/UP X-MAS TREE'S ADAPTOR FLANGE "IN PROGRESS".

>> WIND SPEED @ 6:00 AM 14 - 16 KNOTS.


TOTAL HRs. 24:00

TIME
HRs OPERATIONS
FROM TO

0:00 3:00 3:00


CONT'D N/UP X-MAS TREE'S ADAPTOR FLANGE , TESTED SAME W/2500 PSI THRU ADAPTOR PORT,
N/UP X-MAS TREE , RETRIEVED 1-WAY BPV , SET 2-WAY BPV & P/T SAME W/2500 PSI (OK).

APPLY PRESS. THRU C.L TO OPEN TR-SCSSSV, R/UP SAPESCO S/L EQUIP., P/T SAME "OK", RIH W/ FB-2 PLUG SET SAME IN
3:00 6:00 3:00 F.N., SET 9 5/8" H.V. PKR @ 136 MT & POOH W/ FB-2 PLUG "IN PROGRESS".
>> WHILE THAT STARTED WORKING IN PRODUCTION LINE CONNECTION.
>> TESTED ANNULUS BY 1000 PSI "OK".

TOTAL HRs. 6:00

MAHMOUD ABDELRAZIK
G.P.C REPRESENTATIVE
MAHMOUD ABDELRAZIK

Вам также может понравиться