E&I WORK FRONT LOOKAHEAD SCHEDULE

UPDATED as of 14-JUN-17

12-Jun-17
13-Jun-17
14-Jun-17
15-Jun-17
16-Jun-17
17-Jun-17
18-Jun-17
19-Jun-17
20-Jun-17
21-Jun-17
22-Jun-17
23-Jun-17
24-Jun-17
25-Jun-17
26-Jun-17
27-Jun-17
28-Jun-17
29-Jun-17
30-Jun-17
1-Jul-17
2-Jul-17
NBR. OF EST. QTY
DESCRIPTION DUR (D) START DATE FINISH DATE CABLES (m) STATUS DISC EQUIPMENT REQUIRED COMMENT(S)

LOOKAHEAD - 12-06-17 171 12-Jun-17 30-Nov-17 0


TUNU SITE 360 5-Dec-16 30-Nov-17 0
SUB-STATION
MODIFICATION OF C/T & CABLE ARRANGEMENT 51 28-Apr-17 17-Jun-17 Ongoing E&I 1 1 1 1 1 1
ELE CABLE GLANDING AND TERMINATION 130 24-Mar-17 31-Jul-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TWISTER MODULE AREA
STEP 10 TRENCH ET836, ET837, ET838 EXCAVATION 3 12-Jun-17 14-Jun-17 Completed CIVIL 1 1 1
ELE CABLE PULLING/LAYING - U/G (STEP 10) 3 14-Jun-17 16-Jun-17 Ongoing E&I 1 1 1
STEP 10 TRENCH ET836, ET837, ET838 INSPECTION FOR BACKFILLING 2 17-Jun-17 18-Jun-17 E&I 1 1
STEP 10 TRENCH ET836, ET837, ET838 BACK FILLING 2 19-Jun-17 20-Jun-17 CIVIL 1 1
CLOSED DRAIN VESSEL PUMPS
STEP 11 TRENCH ET832, ET833 EXCAVATION 2 16-Jun-17 17-Jun-17 CIVIL 1 1
ELE CABLE PULLING/LAYING - U/G (STEP 11) 2 18-Jun-17 19-Jun-17 E&I 1 1
STEP 11 TRENCH ET832, ET833 INSPECTION FOR BACKFILLING 1 20-Jun-17 20-Jun-17 E&I 1
STEP 11 TRENCH ET832, ET833 BACK FILLING 2 21-Jun-17 22-Jun-17 CIVIL 1 1
PIPE RACK-001
LV CABLE PULLING A/G ON PIPE RACK 001 155 27-Feb-17 31-Jul-17 0 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CABLE PULLING/LAYING - U/G GAS EXPORT TRAIN-1 (STEP 9) 111 12-Mar-17 30-Jun-17 Ongoing E&I Cables on site. Work to resume 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
PIPE RACK-010
LV CABLE PULLING A/G ON PIPE RACK 010 109 9-Mar-17 25-Jun-17 Ongoing E&I Cables on site. Work to resume 1 1 1 1 1 1 1 1 1 1 1 1 1 1
U/G CABLE PULLING/LAYING - FLARE KO DRUM (STEP 13B) 44 13-May-17 25-Jun-17 Ongoing E&I Cables on site. Work to resume 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FLARE KO DRUM
STEP 13B TRENCH ET880, ET881, ET882, ET879 INSPECTION FOR BACKFILLING 10 16-Jun-17 25-Jun-17 Ongoing E&I Cables on site. Work to resume 1 1 1 1 1 1 1 1 1 1
STEP 13B TRENCH ET880, ET881, ET882, ET879 BACKFILLING 2 25-Jun-17 26-Jun-17 Ongoing CIVIL 1 1
POWER GENERATION & DISTRIBUTION
CABLE GLANDING AND TERMINATION AT TRANSFORMER 115 2-Mar-17 24-Jun-17 Ongoing E&I 3x25mm lug not available. ETA at site 16-Jun-17 1 1 1 1 1 1 1 1 1 1 1 1 1
CCB - PR-001
INS PRIMARY CABLE PULLING IN ITR060 113 25-Apr-17 15-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUBSTATION - CCB
ELE U/G CABLE PULLING/LAYING - CCB TO SUBSTATION (STEP 14) 37 20-May-17 25-Jun-17 Ongoing E&I Cables on site. Work to resume 1 1 1 1 1 1 1 1 1 1 1 1 1 1
STEP 14 TRENCH ET809 INSPECTION FOR BACKFILLING 2 26-Jun-17 27-Jun-17 E&I 1 1
STEP 14 TRENCH ET809 BACKFILLING 2 28-Jun-17 29-Jun-17 CIVIL Excavator/Bobcat 1 1
SUB-STATION - FLB RMU
STEP 18 TRENCH ET811, ET812, ET740 EXCAVATION 6 20-Jun-17 25-Jun-17 CIVIL 1 1 1 1 1 1
ELE U/G CABLE PULLING/LAYING (STEP 18) 6 25-Jun-17 30-Jun-17 E&I 1 1 1 1 1 1
STEP 18 TRENCH ET811, ET812, ET740 INSPPECTION FOR BACKFILLING 2 1-Jul-17 2-Jul-17 E&I 1 1
STEP 18 TRENCH ET811, ET812, ET740 BACKFILLING 3 3-Jul-17 5-Jul-17 CIVIL
STEP 19 TRENCH ET710 EXCAVATION 6 20-Jun-17 25-Jun-17 CIVIL 1 1 1 1 1 1
ELE U/G CABLE PULLING/LAYING (STEP 19) 6 25-Jun-17 30-Jun-17 E&I 1 1 1 1 1 1
STEP 19 TRENCH ET710 INSPPECTION FOR BACKFILLING 2 1-Jul-17 2-Jul-17 E&I 1 1
STEP 19 TRENCH ET710 BACKFILLING 3 3-Jul-17 5-Jul-17 CIVIL
PR001 - EXISTING FLOWSTATION
STEP 17 TRENCH ET937, ET938, ET939, ET890 EXCAVATION 12 7-Jun-17 18-Jun-17 Ongoing CIVIL 1 1 1 1 1 1 1
ELE U/G CABLE PULLING/LAYING -SUBSTATION TO EXISTING FLOW STATION (STEP 17) 12 19-Jun-17 30-Jun-17 E&I 1 1 1 1 1 1 1 1 1 1 1 1
STEP 17 TRENCH ET937, ET938, ET939, ET890 INSPECTION FOR BACKFILLING 2 30-Jun-17 1-Jul-17 E&I 1 1
STEP 17 TRENCH ET937, ET938, ET939, ET890 BACKFILLING 5 1-Jul-17 5-Jul-17 CIVIL 1 1

Page 1 E&I Look ahead Work front schedule


FLARE SYSTEM
INSTALLATION OF THERMO-COUPLES / GLANDING AND TERMINATION ON JBs 113 10-Mar-17 30-Jun-17 Ongoing E&I 1 Adaptor required & 75mm C/T Cover. ETA at site 24-Jun-17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INSTRUMENT AIR & NITROGEN PACKAGE
INSTRUMENT TRENCH ITR024, ITR024A, ITR139 EXCAVATION 5 28-May-17 1-Jun-17 Completed CIVIL
INS PRIMARY CABLE PULLING 7 3-Jun-17 9-Jun-17 Completed E&I
TRENCH ITR024, ITR024A, ITR139 INSPECTION FOR BACKFILLING 11 10-Jun-17 20-Jun-17 E&I INS Secondary cable to be pulled in Trench 1 1 1 1 1 1 1 1 1
TRENCH ITR024, ITR024A, ITR139 BACKFILLING 2 21-Jun-17 22-Jun-17 CIVIL 1 1
AG SLUG CATCHER / OPEN DRAIN TANK
INSTRUMENT TRENCH ITR015, ITR015D, ITR015E, ITR010 EXCAVATION 11 5-Jun-17 15-Jun-17 Ongoing CIVIL 1 1 1 1
INS PRIMARY CABLE PULLING 17 9-Jun-17 25-Jun-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TRENCH ITR015, ITR015D, ITR015E, ITR010 INSPECTION FOR BACKFILLING 2 26-Jun-17 27-Jun-17 E&I 1 1
TRENCH ITR015, ITR015D, ITR015E, ITR010 BACKFILLING 3 28-Jun-17 30-Jun-17 CIVIL 1 1 1
COMMON AREA
EARTHING U/G CONDUCTORS 239 5-Dec-16 31-Jul-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EARTHING TERMINATION 135 3-Apr-17 15-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ELECTRICAL PRIMARY CABLE TERNINATION 142 12-Apr-17 31-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CATHODIC PROTECTION 314 6-Dec-16 15-Oct-17 Ongoing E&I Rectifier unit EDA Sept. 2017 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INSTALLATION OF RCU DEVICES AND SWITCHES 166 16-Jan-17 30-Jun-17 Ongoing E&I Remaining Precast foundation required 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INS INSTALLATION OF JB FRAMES AND JB 197 16-Jan-17 31-Jul-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INSTRUMENT EQUIPMENT INSTALLATION 179 6-Mar-17 31-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ELE SECONDARY C/T INSTALLATION 212 16-Jan-17 15-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INS SECONDARY C/T INSTALLATION 212 16-Jan-17 15-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INS SECONDARY CABLE PULLING 128 1-May-17 5-Sep-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
POWER DISTRIBUTION APPARATUS 117 6-Mar-17 30-Jun-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INS TUBING INSTALLATION 50 12-May-17 30-Jun-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INFRASTRUCTURE/SHORELINE
PLANT AND LIGHTING INSTALLATION FOR SHELTERS 251 25-Mar-17 30-Nov-17 Ongoing E&I Scaffold / Manlif 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CONDUIT INSTALLATION IN GATE HOUSE 66 26-Apr-17 30-Jun-17 Ongoing E&I Accessories on site. Work to resume 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OGBOTOBO SITE 339 26-Dec-16 30-Nov-17 0
PIPE RACKS
ELE / INS MAIN CABLE TRAY INSTALLATION ON PR-002 52 10-May-17 30-Jun-17 Ongoing E&I Scaffold erction ongoing 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUB-STATION
MODIFICATION OF CABLE TRAY UNDER SS-100 CELAR 10 8-Jun-17 17-Jun-17 Ongoing E&I 1 1 1 1 1 1
SUB-STATION - PR-001
ELE PRIMARY CABLE PULLING TO PR-001 71 22-Jun-17 31-Aug-17 E&I Early Works 1 1 1 1 1 1 1 1 1 1 1
FAR - PR-001
INS PRIMARY CABLE PULLING THROUGH ITR013 TO PR-001 109 15-May-17 31-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
KO DRUM - PR-003
INS PRIMARY CABLE PULLING TO PR-003 32 14-Jun-17 15-Jul-17 E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BOOSTER STATION
JB FRAME INSTALALTION 72 20-Apr-17 30-Jun-17 Ongoing E&I Awaiting installation of foundation by CICO to complete the remaining 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
JB INSTALLATION 72 20-Apr-17 30-Jun-17 Ongoing E&I Convetional JB installation ongoing 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ELE RCU /JB INSTALLATION 76 1-Jun-17 15-Aug-17 Ongoing E&I No ELE JB on site 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INS SECONDARY CABLE TRAY INSTALLATION 64 28-Apr-17 30-Jun-17 Ongoing E&I Unavailability of 200x100 cable tray for inst. JB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
COMMON AREA
EARTHING U/G CONDUCTORS 172 26-Dec-16 15-Jun-17 Ongoing E&I 1 1 1 1
EARTHING A/G CONDUCTORS 73 20-Jun-17 31-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1
EARTHING TERMINATION 129 25-Apr-17 31-Aug-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CATHODIC PROTECTION 280 24-Feb-17 30-Nov-17 Ongoing E&I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1