PROGRESS REPORT for MEP Works

Total
Quantity
SERVICES 02.07.2016 03.07.2016 04.07.2016 05.07.2016 06.07.2016 07.07.2016 Installed
for this
Week

1.5m bet. MH: 21/100A/11 to MH: 21/100A/10 CH: 0+280.8


Foul Sewer (LM) 0 0 0 & 3m bet. MH: 21/100A/11 to MH: 21/100A/12 CH: 0+280.8 0 0 4.5
Ammar Bin Yasser

Soak Away System (LM) 0 0 0 0 0 0 0

Ground Water Lowering 0 2.6m bet. SW13-S1-7-16-3 to SW13-S1-7-16-4 CH: 0+295 Rod 0 0 0 0 2.6
Network (LM) R1

TSE (LM) 0 0 0 0 0 0 0

TSE Line UPVC (LM) 0 0 0 0 0 0 0

Water Distribution (LM) 0 0 0 0 0 0 0


D.I. Pipes

Water Distribution 0 0 0 0 0 0 0
UPVC Pipe Sleeve (LM)

Gully Connection UPVC 0 10.8m bet SW13-3-11-1B to G1 CH: 0+560 Osama Bin Zaid 0 11.5m bet. MH: SW13-3-11-1C to G1 CH: 0+530 Osama 0 0 22.3
(LM)

Over Flow Back Drop


Line (LM) Surface 0 0 0 0 0 0 0
Water

Over Flow Back Drop 0 0 0 0 0 0 0


Line (LM) Foul Sewer

House Connection (LM) 0 0 0 0 0 0 0


Foul Sewer

Back Drop (Nos) Surface 1no bet MH: SW13-S1-7-4-A3 to MH:SA-26-03 CH: 0+240
Water Ammar Bin Yasser 0 0 0 0 0 1

Back Drop (Nos) Foul


Sewer 0 0 0 0 0 0 0

Manhole Connection 0 0 0 0 0 0
Surface Water(Nos)

Manhole Connection 0 0 0 2nos MH: 21/100A/11 CH: 0+280.8 Ammar Bin 0 0 0


Foul Sewer(Nos)