PS-DC-186-500- Sheet 1 of 20
0006A
NTPC Ref No. SIM/1/TS/2/005 A
Plant area : TURBINE
Sl. No.
2.0 OBJECTIVE
3.0 PROPOSALS
8.0 METHOD
10.0 APPENDICES
a) Drawing
b) Log Sheets
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 2 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 3 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
2.0 OBJECTIVE
Signatures
NTPC BHEL
Station: NTPC – Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 4 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
3.0 PROPOSAL
Commissioning of seal oil system is carried out in
the following stages:
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 5 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
4.2 Filling of seal oil storage tank with fresh oil and running of
Availability of service air and thinner/petrol for filter
cleaning.
Signatures
NTPC BHEL
Station: NTPC – Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 6 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
5.1 Readiness of stair cases, platforms, hand rails for Seal Oil
Tank and required approaches as decided at site are made
available.
5.2 Safety and protection equipments like hand gloves, helmet etc
are available during the process.
5.5 Ensure the availability of first aid kit near the process area.
5.8 Load on Pumps shall not exceed full load current of the motor.
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 7 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 8 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR GENERATOR SEAL OIL INTIAL CIRCULATION
7.1.2 Filling of seal oil storage tank with fresh oil and
running of Availability of service air and thinner/petrol
for filter cleaning.
7.1.5 Ensure that all the shut off and gate valves are
closed.
7.1.6 Loosening of spring of pressure regulating valves
A1,A2 and C to ensure these are in fully open
condition.
Signatures
NTPC BHEL
Station: NTPC – Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 9 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 10 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006
Sheet 11 of 20
NTPC Ref No. SIM/1/TS/2/005
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
8.0 METHOD
Signatures
NTPC BHEL
Station: NTPC – Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 12 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
Signatures
NTPC BHEL
Station: NTPC - Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 13 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
8.1.2 Charge the seal oil coolers on oil side with rotary
transfer valve assembly in centre position. When
the coolers are filled with seal oil, turn rotary
transfer valve on one side i.e. Right hand or left
hand side to bring one cooler in service and
other on standby.
8.1.4 Start and stop seal oil pump 1 for a short time to
bleed air from piping until pressure gauges MKW
71 CP 511 and CP 521 indicate a constant
pressure.
Signatures
NTPC BHEL
8.2.1 During filling of the air side circuit, the seal oil
tank is simultaneously filled with seal oil by valve
MKW03 AA 502. Oil level in this tank will
continue to rise above the sight glass till it
reaches the level of seal oil storage tank and will
get drained through siphon action.
MKW13 AA 503
Signatures
NTPC BHEL
8.2.6 Start and stop H2 side seal oil pump to bleed the
air from piping until the pressure gauges
MKW73 CP 511 and CP 521 indicates a
constant reading. Set three way valves MKW73
AA 511 and AA 521 to position, where no oil
passes through volume flow indicator.
Signatures
NTPC BHEL
Station: NTPC – Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 16 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
Signatures
NTPC BHEL
Station: NTPC – Simhadri BHEL Ref No. PS-DC-186-500-0006 Sheet 17 of 20
NTPC Ref No. SIM/1/TS/2/005
Plant area : TURBINE
PROCEDURE FOR HYDRAULIC TEST AND OIL FLUSHING OF GENERATOR
SEAL OIL SYSTEM
NTPC BHEL
Signatures
NTPC BHEL
Signatures
NTPC BHEL
Sheet 20 of 20
Oil temperature
Thermal
Sl.No Date/Time Pump Dis.Pr. Bef. After Remarks
Shock
Cooler Cooler
Signatures
NTPC BHEL
PROCEDURE FOR HYDRAULIC TEST AND OIL
FLUSHING OF GENERATOR SEAL OIL SYSTEM