The document is a list of 22 pipeline drawings numbered 1 through 22. Each drawing is a longitudinal section of the pipeline at a certain chainage range, with the chainages increasing from drawing to drawing in 600 meter increments up to 15016 meters.
The document is a list of 22 pipeline drawings numbered 1 through 22. Each drawing is a longitudinal section of the pipeline at a certain chainage range, with the chainages increasing from drawing to drawing in 600 meter increments up to 15016 meters.
The document is a list of 22 pipeline drawings numbered 1 through 22. Each drawing is a longitudinal section of the pipeline at a certain chainage range, with the chainages increasing from drawing to drawing in 600 meter increments up to 15016 meters.
PIPELAYING WORKS LOGITUDINAL SECTION OF CH: 600 TO 1200 1 LOGITUDINAL SECTION OF CH: 1200 TO 1800 2 LOGITUDINAL SECTION OF CH: 1800 TO 2400 3 LOGITUDINAL SECTION OF CH: 2400 TO 3000 4 LOGITUDINAL SECTION OF CH: 3000 TO 3600 5 LOGITUDINAL SECTION OF CH: 3600 TO 4200 6 LOGITUDINAL SECTION OF CH: 4200 TO 4620 7 LOGITUDINAL SECTION OF CH: 4620 TO 5200 8 LOGITUDINAL SECTION OF CH: 5200 TO 5800 9 LOGITUDINAL SECTION OF CH: 5800 TO 6400 10 LOGITUDINAL SECTION OF CH: 6400 TO 7000 11 LOGITUDINAL SECTION OF CH: 7000 TO 7600 12 LOGITUDINAL SECTION OF CH: 8960 TO 9600 13 LOGITUDINAL SECTION OF CH: 9600 TO 10200 14 LOGITUDINAL SECTION OF CH: 10200 TO 10800 15 LOGITUDINAL SECTION OF CH: 10800 TO 11400 16 LOGITUDINAL SECTION OF CH: 11400 TO 12000 17 LOGITUDINAL SECTION OF CH: 12000 TO 12600 18 LOGITUDINAL SECTION OF CH: 12600 TO 13200 19 LOGITUDINAL SECTION OF CH: 13200 TO 13800 20 LOGITUDINAL SECTION OF CH: 13800 TO 14400 21 LOGITUDINAL SECTION OF CH: 14400 TO 15016 22